This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Rule
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
This temporary scheduling order, which extends schedule I control of CUMYL-PEGACLONE covered by an order (88 FR 86040, December 12, 2023), is effective December 12, 2025, and expires on December 12, 2026. If DEA publishes a final rule making this scheduling action permanent, this order will expire on the effective date of that rule, if the effective date is earlier than December 12, 2026.
Table of Contents
Enhanced Content - Table of Contents
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Comments are no longer being accepted.
See DATES for details.
Regulations.gov Data
Enhanced Content - Regulations.gov Data
FederalRegister.gov retrieves relevant information about this document
from Regulations.gov to provide users with additional context. This
information is not part of the official Federal Register document.
Schedules of Controlled Substances: Placement of CUMYL-PEGACLONE in Schedule I (DEA1511)
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
562
as of
07/16/2026 at 2:15 pm EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2025-22496 as it appeared on Public Inspection on
12/10/2025 at 8:45 am.
It was viewed
16
times while on Public Inspection.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2025-22496 (90 FR 57542)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
( printed page 57542)
AGENCY:
Drug Enforcement Administration, Department of Justice.
ACTION:
Temporary scheduling order; extension.
SUMMARY:
The Administrator of the Drug Enforcement Administration (DEA) is issuing this temporary scheduling order to extend the temporary schedule I status of CUMYL-PEGACLONE. In an order dated December 12, 2023, DEA temporarily placed CUMYL-PEGACLONE in schedule I of the Controlled Substances Act. This temporary order will extend the temporary scheduling of CUMYL-PEGACLONE for one year, or until the permanent scheduling action for this substance is completed, whichever occurs first. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances will continue to be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis with, or possess) or propose to handle CUMYL-PEGACLONE.
DATES:
This temporary scheduling order, which extends schedule I control of CUMYL-PEGACLONE covered by an order (88 FR 86040, December 12, 2023), is effective December 12, 2025, and expires on December 12, 2026. If DEA publishes a final rule making this scheduling action permanent, this order will expire on the effective date of that rule, if the effective date is earlier than December 12, 2026.
FOR FURTHER INFORMATION CONTACT:
Dr. Terrence L. Boos, Drug and Chemical Evaluation Section, Diversion Control Division, Drug Enforcement Administration; Mailing Address: 8701 Morrissette Drive, Springfield, Virginia 22152; Telephone: (571) 362-3249.
SUPPLEMENTARY INFORMATION:
In this order, the Drug Enforcement Administration (DEA) extends the temporary scheduling of CUMYL-PEGACLONE in schedule I of the Controlled Substances Act (CSA), including its salts, isomers, and salts of isomers, whenever the existence of such salts, isomers, and salts of isomers is possible within the specific chemical designation:
On December 12, 2023, pursuant to 21 U.S.C. 811(h)(1), DEA published an order in the
Federal Register
temporarily placing CUMYL-PEGACLONE in schedule I of the CSA based upon a finding that this substance poses an imminent hazard to the public safety.[1]
That temporary order was effective upon the date of publication. Pursuant to 21 U.S.C. 811(h)(2), the temporary scheduling of a substance expires at the end of two years from the date of issuance of the scheduling order, except that DEA may extend temporary scheduling of that substance for up to one year during the pendency of proceedings under 21 U.S.C. 811(a)(1) with the respect to the temporarily controlled substance. In this instance, the temporary scheduling of CUMYL-PEGACLONE expires on December 12, 2025, unless extended.
Proceedings for the issuance, amendment, or repeal of the scheduling of any drug or other substance under 21 U.S.C. 811(a) may be initiated by the Attorney General (delegated to the Administrator of DEA pursuant to 28 CFR 0.100) on her own motion, at the request of the Secretary of the Department of Health and Human Services (HHS), or on the petition of any interested party.[2]
The Administrator of DEA, on his own motion pursuant to 21 U.S.C. 811(a), has initiated proceedings under 21 U.S.C. 811(a)(1) to permanently schedule CUMYL-PEGACLONE. DEA is publishing a notice of proposed rulemaking elsewhere in this issue of the
Federal Register
for the permanent placement of CUMYL-PEGACLONE in schedule I. If that proposed rule is finalized, DEA will publish a final rule in the
Federal Register
to make permanent the schedule I status of this substance.
Pursuant to 21 U.S.C. 811(h)(2), the Administrator orders that the temporary scheduling of CUMYL-PEGACLONE and its salts, isomers, and salts of isomers whenever the existence of such salts, isomers, and salts of isomers is possible, be extended for one year, or until the permanent scheduling proceeding is completed, whichever occurs first.
Regulatory Matters
The CSA provides for an expedited temporary scheduling action where such action is necessary to avoid an imminent hazard to the public safety.[3]
This provision of the CSA allows the Attorney General, by order, to temporarily place substances in schedule I.[4]
The same subsection also provides that the temporary scheduling of a substance shall expire at the end of two years from the date of the issuance of the order scheduling such substance, except that the Attorney General may, during the pendency of proceedings to permanently schedule the substance under 21 U.S.C. 811(a)(1), extend the temporary scheduling for up to one year.
To the extent that 21 U.S.C. 811(h) directs that temporary scheduling actions be issued by order and sets forth the procedures by which such orders are to be issued and extended, the notice and comment requirements of the Administrative Procedure Act (APA) at 5 U.S.C. 553, do not apply to this extension of the temporary scheduling action. The APA expressly differentiates between orders and rules, as it defines an “order” to mean a “final disposition, whether affirmative, negative, injunctive, or declaratory in form, of an agency
in a matter other than rule making.
” [5]
This contrasts with permanent scheduling actions, which are subject to formal rulemaking procedures done “on the record after opportunity for a hearing,” and final decisions that conclude the scheduling process and are subject to judicial review.[6]
The specific language chosen by Congress indicates an intention for DEA to proceed through the issuance of an order instead of proceeding by rulemaking. Given that Congress specifically requires the Attorney General to follow rulemaking
( printed page 57543)
procedures for other kinds of scheduling actions,[7]
it is noteworthy that, in subsection 811(h), Congress authorized the issuance of temporary scheduling actions by order rather than by rule.
In the alternative, even if this action were subject to 5 U.S.C. 553, the Administrator finds that there is good cause under 5 U.S.C. 553(b)(B) and (d)(3) to forgo the notice-and-comment requirements and the delayed effective date requirements of such section, as any further delays in the process for extending the temporary scheduling order would be impracticable and contrary to the public interest in view of the manifest urgency to avoid an imminent hazard to the public safety that this substance would present if scheduling expired, for the reasons expressed in the temporary scheduling order.[8]
Further, DEA believes that this order extending the temporary scheduling action is not a “rule” as defined by 5 U.S.C. 601(2) and, accordingly, is not subject to the requirements of the Regulatory Flexibility Act (RFA). The requirements for the preparation of an initial regulatory flexibility analysis in 5 U.S.C. 603(a) are not applicable where, as here, DEA is not required by the APA at 5 U.S.C. 553 or any other law to publish a general notice of proposed rulemaking. Therefore, in this instance, since DEA believes this temporary scheduling action is not a “rule,” it is not subject to the requirements of the RFA when issuing this temporary action.
In addition, in accordance with the principles of Executive Orders (E.O.) 12866 and 13563, this action is not a significant regulatory action. E.O. 12866 directs agencies to assess all costs and benefits of available regulatory alternatives and, if regulation is necessary, to select regulatory approaches that maximize net benefits (including potential economic, environmental, public health, and safety effects; distributive impacts; and equity). E.O. 13563 is supplemental to and reaffirms the principles, structures, and definitions governing regulatory review as established in E.O. 12866. E.O. 12866, sec. 3(f), provides the definition of a “significant regulatory action,” requiring review by the Office of Management and Budget. Because this is not a rulemaking action, this is not a significant regulatory action as defined in subsection 3(f) of E.O. 12866. DEA scheduling actions are not subject to either E.O. 14192, Unleashing Prosperity Through Deregulation, or E.O. 14294, Fighting Overcriminalization in Federal Regulations.
This action will not have substantial direct effects on the States, on the relationship between the National Government and the States, or on the distribution of power and responsibilities among the various levels of government. Therefore, in accordance with E.O. 13132 (Federalism), it is determined that this action does not have sufficient federalism implications to warrant the preparation of a Federalism Assessment.
As noted above, this action is an order, not a rule. Accordingly, the Congressional Review Act (CRA) is inapplicable, as it applies only to rules. However, if this were a rule, pursuant to the CRA, “any rule for which an agency for good cause finds that notice and public procedure thereon are impracticable, unnecessary, or contrary to the public interest, shall take effect at such time as the federal agency promulgating the rule determines.” [9]
It is in the public interest to maintain the temporary placement of CUMYL-PEGACLONE, including its salts, isomers, and salts of isomers, in schedule I because it poses a public health risk. The temporary scheduling action was taken pursuant to 21 U.S.C. 811(h), which is specifically designed to enable DEA to act in an expeditious manner to avoid an imminent hazard to the public safety. Under 21 U.S.C. 811(h), temporary scheduling orders are not subject to notice and comment rulemaking procedures. For the same reasons that underlie 21 U.S.C. 811(h), that is, the need to keep this substance in schedule I because it poses an imminent hazard to public safety, it would be contrary to the public interest to delay implementation of this extension of the temporary scheduling order. Further, public notice and comment is impracticable in the amount of time remaining before expiration of the temporary scheduling order and considering the manifest urgency to avoid an imminent hazard to the public safety that this substance would present if scheduling expired, for the reasons expressed in the temporary scheduling order. Therefore, in accordance with subsection 808(2) of the CRA, this order extending the temporary scheduling order, for CUMYL-PEGACLONE currently covered under the temporary order, shall take effect immediately upon its publication.
Nonetheless, DEA has submitted a copy of this temporary order to both Houses of Congress and to the Comptroller General, although such filing is not required under the Small Business Regulatory Enforcement Fairness Act of 1996 (Congressional Review Act), 5 U.S.C. 801-808 because, as noted above, this action is an order, not a rule.
Signing Authority
This document of the Drug Enforcement Administration was signed on December 8, 2025, by Administrator Terrance C. Cole. That document with the original signature and date is maintained by DEA. For administrative purposes only, and in compliance with requirements of the Office of the Federal Register, the undersigned DEA Federal Register Liaison Officer has been authorized to sign and submit the document in electronic format for publication, as an official document of DEA. This administrative process in no way alters the legal effect of this document upon publication in the
Federal Register
.
Heather Achbach,
Federal Register Liaison Officer, Drug Enforcement Administration.
Footnotes
1.
Schedules of Controlled Substances: Temporary Placement of MDMB-4en-PINACA, 4F-MDMB-BUTICA, ADB-4en-PINACA, CUMYL-PEGACLONE, 5F-EDMB-PICA, and MMB-FUBICA into Schedule I,88 FR 86040 (December 12, 2023).
2.
21 U.S.C. 811(a). As discussed in a memorandum of understanding entered into by the Food and Drug Administration (FDA) and the National Institute on Drug Abuse (NIDA), FDA acts as the lead agency within HHS in carrying out the Secretary's scheduling responsibilities under the CSA, with the concurrence of NIDA.
Memorandum of Understanding with the National Institute on Drug Abuse,50 FR 9518 (Mar. 8, 1985). Because the Secretary has delegated to the Assistant Secretary for Health of HHS the authority to make domestic drug scheduling recommendations,
see Comprehensive Drug Abuse Prevention and Control Act of 1970, Public Law 91-513, As Amended; Delegation of Authority,58 FR 35460 (July 1, 1993), for purposes of this temporary order, all subsequent references to “Secretary” have been replaced with “Assistant Secretary.”
8.
See Schedules of Controlled Substances: Temporary Placement of MDMB-4en-PINACA, 4F-MDMB-BUTICA, ADB-4en-PINACA, CUMYL-PEGACLONE, 5F-EDMB-PICA, and MMB-FUBICA into Schedule I, 88 FR 86040 (December 12, 2023).