This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
Notice of Intent To Prepare an Environmental Impact Statement for Navajo Transitional Energy Company's No Name Permit Surface Mining Control & Reclamation Act Permit Application
OSMRE requests comments concerning the scope of the analysis in the EIS, as well as reasonable alternatives to be considered, and identification of relevant information, studies, and analyses that may be useful in evaluating potential impacts of the proposed action and alternatives. All comments must be received by February 4, 2026. The public scoping meeting will be held at the Burnham Chapter House on the Navajo Nation on Thursday, January 29, 2026, from 3:00 p.m. to 7:00 p.m.
Table of Contents
Enhanced Content - Table of Contents
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Notice of intent to prepare an environmental impact statement.
Notice of Intent To Prepare an Environmental Impact Statement for Navajo Transitional Energy Company's No Name Permit Surface Mining Control & Reclamation Act Permit Application
Notice of intent to prepare an environmental impact statement.
Notice of Intent To Prepare an Environmental Impact Statement for Navajo Transitional Energy Company's No Name Permit Surface Mining Control & Reclamation Act Permit Application
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
252
as of
07/16/2026 at 6:15 pm EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2026-00702 as it appeared on Public Inspection on
01/14/2026 at 8:45 am.
It was viewed
8
times while on Public Inspection.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2026-00702 (91 FR 1814)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Office of Surface Mining Reclamation and Enforcement, Interior.
ACTION:
Notice of intent to prepare an environmental impact statement.
SUMMARY:
The Office of Surface Mining Reclamation and Enforcement (OSMRE) is publishing this notice to announce that it will prepare an environmental impact statement (EIS) for Navajo Transitional Energy Company's (NTEC) proposed Surface Mining Control and Reclamation Act of 1977 (SMCRA) permit for the No Name Permit area within NTEC's existing Navajo Mine Lease 14-20-603-2505. With this notice, OSMRE is also providing notification to the public that it will hold a public scoping meeting and provide for a public scoping period to receive comments on the environmental issues that OSMRE should analyze in this EIS. If approved, the permit boundary would encompass 11,526 acres and authorize surface mining and reclamation operations on 9,042 acres and the recovery of 502 million tons of Navajo Nation coal.
DATES:
OSMRE requests comments concerning the scope of the analysis in the EIS, as well as reasonable alternatives to be considered, and identification of relevant information, studies, and analyses that may be useful in evaluating potential impacts of the proposed action and alternatives. All comments must be received by February 4, 2026. The public scoping meeting will be held at the Burnham Chapter House on the Navajo Nation on Thursday, January 29, 2026, from 3:00 p.m. to 7:00 p.m.
ADDRESSES:
You may submit comments related to the Project by either of the following methods:
Mail:
ATTN No Name SMCRA Permit EIS, C/O Roberta Martínez Hernández, OSMRE Western Regions 5, 7-11, P.O. Box 25065, Lakewood, CO 80225-0065.
FOR FURTHER INFORMATION CONTACT:
Roberta Martínez Hernández, NEPA Project Manager, email:
rmartinezhernandez@osmre.gov
or at the address provided in the
ADDRESSES
section. Individuals who use telecommunication devices for the deaf (TDD) may call the Federal Information Relay Service (FIRS) at 1-800-877-8339 between 8 a.m. and 8 p.m., Eastern Time, Monday through Friday.
SUPPLEMENTARY INFORMATION:
OSMRE Regions 5, 7-11 will prepare an EIS for the No Name SMCRA Permit application (Project). In accordance with SMCRA, OSMRE must approve, disapprove, or approve the Project with conditions because the Project is on Indian lands, as that term is defined under SMCRA, including tribal lands with leased tribal coal (BIA Mine Lease 14-20-603-2505). The lease agreement grants NTEC the right to mine within the lease area; however, mining cannot occur until a SMCRA permit is obtained. The Navajo Nation owns the surface and mineral rights of the entire lease area and the permit areas located within it.
OSMRE will prepare an EIS to analyze the potential environmental effects of the Project. The EIS will analyze the potential environmental effects of mining, including the realignment of Burnham Road and the Pinabete Arroyo. The only current customer of the Navajo Mine Complex is the Four Corners Power Plant, which has an approved lease through 2041; therefore, it is reasonably foreseeable that all coal mined at the Project will be used at the plant until 2041. Beyond 2041, the ultimate destination for the coal from the Project is unknown.
The No Name Permit area is located on the Navajo Nation approximately 22 miles from Farmington, New Mexico. The proposed surface coal mine is within NTEC's existing Navajo Mine Lease 14-20-603-2505, located adjacent to the southern boundary of the current Navajo Mine (OSMRE Permit No. NM-0042B) and adjacent to NTEC's Pinabete permit southern boundary. The No Name boundary permit area covers 11,526 acres, completely within tribal lands, and the current surface land use is grazing. The Project would allow for 9,042 acres of additional surface disturbance and production of 502,984,700 tons of recoverable coal, extending the life of the mine to 2136. The initial permit will be for five years with a right of renewal for the life of the mine, as long as all legal requirements are met. The annual production rate for the Project is anticipated to be approximately 5 million tons per year,
( printed page 1815)
starting in 2031, which is the rate OSMRE intends to use to consider potential environmental impacts resulting from the Project.
Purpose and Need for the Proposed Action
The purpose and need for this EIS is for OSMRE to fulfill its obligation to ensure compliance with the requirements of NEPA with respect to permitting actions for surface coal mining and reclamation operations on Indian lands under 30 CFR 750.6(a)(7). 516 DM 1, Sec. 2.2.
Under the Department's Handbook of National Environmental Policy Act Implementing Procedures, 516 DM 1, “when the proposed action concerns a bureau's duty to act on an application for authorization, the purpose and need for the proposed action will also be informed by the goals of the applicant.” 516 DM 1, Sec. 2.2. Here, NTEC informed OSMRE that the Project is needed to allow NTEC to mine coal within its leased areas, to continue to provide coal to the Four Corners Power Plant for the duration of the Plant's continued operations, and to provide coal to future customers if the Four Corners Power Plant shuts down. NTEC was established by the Navajo Nation to exercise sovereignty over its natural resources. NTEC informed OSMRE that its purpose, including for the No Name Project, is to promote the development of the Navajo Nation's resources and new sources of energy, power, and transmission.
Preliminary Proposed Project and Alternatives
The Project proposes a new SMCRA permit area within Area 4 South and Area 5 of NTEC's existing Navajo Mine Lease 14-20-603-2505, located on the western flank of the San Juan Structural Basin south of the Navajo Mine (the No Name SMCRA Permit). The life of the mine would depend on the rate of production. The Project would require diversion of the Pinabete Arroyo into No Name Arroyo to mine in Area 4 South, as well as realignment of 7 miles of Burnham Road.
The EIS will evaluate the Proposed Action Alternative, a High Demand Alternative, and a No Action Alternative, and may evaluate additional action alternatives if other reasonable alternatives are identified that are technically and economically feasible, meet the purpose and need for the proposed action, are within the jurisdiction of OSMRE, and meet the goals of NTEC. Under the Proposed Action Alternative, mining would occur at a rate of 5 million tons per year, and the mine would operate through 2136. Under a High Demand Alternative, mining would occur at a rate of 15 million tons per year starting in 2036, and the mine would operate through 2076. Under both the Proposed Action Alternative and the High Demand Alternative, the permit boundary would encompass 11,526 acres and authorize surface mining and reclamation operations on 9,042 acres and the recovery of 502 million tons of Navajo Nation coal. Under the No Action Alternative, OSMRE would not approve the Project and no mining disturbance would occur.
Summary of Expected Impacts
OSMRE has completed internal scoping and identified preliminary analysis issues that will be evaluated in the EIS. The following reasonably foreseeable effects of mining coal within the No Name permit area will be evaluated for the following resources:
Impacts to surface water resources quality and quantity as a result of diverting the Pinabete Arroyo; potential wastewater discharges to the No Name and Pinabete Arroyos; and water use during mining and reclamation;
Impacts to groundwater quality and quantity as a result of surface mining and reclamation activities that may require dewatering;
Impacts to air resources as a result of the Project;
Disturbances to potential archaeological and tribal cultural resources as a result of ground-disturbance from surface mining activities;
Impacts to topography and physiography from surface mining and reclamation activities;
Impacts to wildlife, vegetation, and federally listed and proposed threatened/endangered species from the Project (e.g.,
increased noise, ground disturbance, vegetation removal); and
Potential increases in ambient noise and vibration at sensitive receptor locations as a result of mining and reclamation activities.
Anticipated Permits and Authorizations
OSMRE action on the federal SMCRA permit.
Schedule for the Decision-Making Process
The Department plans to issue the Record of Decision in 2026.
Public Scoping Process
All public scoping comments must be submitted by email or by hard copy mail to the addresses listed under
ADDRESSES
. Before including your address, phone number, email address, or other personal identifying information in your comment, you should be aware that your entire comment—including your personal identifying information—may be made public at any time. While you may request in your comment to withhold your personal identifying information from public review, OSMRE cannot guarantee that this will occur.
The project web page located at (
https://www.osmre.gov/laws-and-regulations/nepa/projects) includes the description of the Project, a map of the proposed mining area, and information about how to submit public comment on issues or concerns related to the Project. In addition to comments concerning the scope of the EIS analysis, commenters are encouraged to identify relevant information, studies, and analyses that would assist OSMRE in making its decision and in identifying potential alternatives to the Project.
OSMRE will review and consider all public scoping comments received and prepare a Scoping Summary Report. The Scoping Summary Report will be used by OSMRE to identify issues to be included in the EIS analysis, resources and issues that can be dismissed from detailed analysis because they are not present or not affected by the Project, and potential alternatives to be analyzed.
Lead and Cooperating Agencies
OSMRE is the lead agency for this EIS. The U.S. Environmental Protection Agency, Bureau of Land Management, Bureau of Indian Affairs, the Navajo Mineral Program, and Navajo Nation Environmental Protection Agency have been invited to be cooperating agencies. Other federal agencies, state, tribal, and local governments with jurisdiction by law or special expertise that are interested in participating in the preparation of this EIS should contact the above-mentioned NEPA Project Manager.
Decision Maker
Office of Surface Mining Reclamation and Enforcement.
Nature of Decision To Be Made
Informed, in part, by the EIS analysis, OSMRE will make a decision to approve, disapprove, or approve with conditions the No Name Permit area SMCRA permit application.