This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
Comments on the collection of information are due May 4, 2026.
Table of Contents
Enhanced Content - Table of Contents
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
64
as of
07/12/2026 at 10:15 am EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2026-04266 as it appeared on Public Inspection on
03/03/2026 at 8:45 am.
It was viewed
6
times while on Public Inspection.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2026-04266 (91 FR 10592)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Federal Energy Regulatory Commission.
ACTION:
Notice of information collection and request for comments.
SUMMARY:
In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection FERC-725N (Mandatory Reliability Standards TPL-007-4, Transmission System Planned Performance for Geomagnetic Disturbance Events).
DATES:
Comments on the collection of information are due May 4, 2026.
ADDRESSES:
You may submit your comments (identified by Docket No. IC26-19-000) by one of the following methods:
Electronic Filing:
Documents must be filed in acceptable native applications and print-to-PDF, but not in scanned or picture format.
For those unable to file electronically, comments may be filed by USPS mail or by hand (including courier) delivery:
○
Mail via U.S. Postal Service Only:
Addressed to: Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street NE, Washington, DC 20426.
○
Hand (Including Courier) Delivery:
Addressed to: Federal Energy Regulatory Commission, Secretary of the Commission,12225 Wilkins Avenue, Rockville, MD 20852.
Instructions:
All submissions must be formatted and filed in accordance with submission guidelines at:
https://www.ferc.gov.
For user assistance, contact FERC Online Support by email at
ferconlinesupport@ferc.gov,
or by phone at (866) 208-3676 (toll-free).
Docket:
Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do so at
https://www.ferc.gov.
Title:
FERC-725N, Mandatory Reliability Standards TPL-007-4, Transmission System Planned Performance for Geomagnetic Disturbance Events.
OMB Control No.:
1902-0264.
Type of Request:
Extension of the currently approved collection without change.
Abstract:
The Reliability Standard TPL-007-4 requires owners and operators of the Bulk-Power System to conduct initial and on-going vulnerability assessments of the potential impact of defined geomagnetic disturbance events on Bulk- Power System equipment and the Bulk-Power System as a whole. Specifically, the Reliability Standard requires entities to develop corrective action plans for vulnerabilities identified through supplemental geomagnetic disturbance vulnerability assessments and requires entities to seek approval from the Electric Reliability Organization of any extensions of time for the completion of corrective action plan items.
On August 8, 2005, Congress enacted into law the Electricity Modernization Act of 2005, which is Title XII, Subtitle A, of the Energy Policy Act of 2005 (EPAct 2005).[1]
EPAct 2005 added a new section 215 to the Federal Power Act (FPA), which required a Commission-certified Electric Reliability Organization (ERO) to develop mandatory and enforceable Reliability Standards, which are subject to Commission review and approval. Once approved, the Reliability Standards may be enforced by the ERO subject to Commission oversight, or the Commission can independently enforce Reliability Standards.[2]
On February 3, 2006, the Commission issued Order No. 672, implementing section 215 of the FPA.[3]
Pursuant to Order No. 672, the Commission certified one organization, North American Electric Reliability Corporation (NERC), as the ERO.[4]
The Reliability Standards developed by the ERO and approved by the Commission apply to users, owners and operators of the Bulk-Power System as set forth in each Reliability Standard.
Type of Respondents:
Generator Owner, Planning Coordinator, Distribution Provider and Transmission Owners.
Estimate of Annual Burden:[5]
Our estimates are based on the NERC Compliance Registry Summary of Entities as of February 9, 2026.
The individual burden estimates include the time needed to gather data,
( printed page 10593)
run studies, and analyze study results. These are consistent with estimates for similar tasks in other Commission-approved standards. Estimates for the additional average annual burden and cost 6
as follows:
Annual Collection TPL-007-4 FERC 725N
Reliability standard or process
Type and
number
of entities 7
Annual
number of
responses
per entity
Total
number of
responses
Average
burden hrs. & cost
($) per response
Total annual burden
hours & cost ($)
(rounded)
(1)
(2)
(1) * (2) = (3)
(4)
(3) * (4) = (5)
Annual review and record retention 8910
1,354 (GOP)
1
1,354
40 hrs.; $2,540.80
54,160 hrs.; $3,440,243.
60 (PC)
1
60
40 hrs.; $2,540.80
2,400 hrs.; $ 152,448.
300 (DP)
1
300
40 hrs.; $2,540.80
12,000 hrs.; $762,240.
341 (TO)
1
341
40 hrs.; $2,540.80
13,640 hrs.; $866,413.
Total for TPL-007-4
2,055
82,200 hours; $5,221,344.
Comments:
Comments are invited on: (1) whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency's estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology.
Dated: February 27, 2026.
Debbie-Anne A. Reese,
Secretary.
Footnotes
1.
Energy Policy Act of 2005, Public Law 109-58, Title XII, Subtitle A, 119 Stat. 594, 941 (codified at 16 U.S.C. 824o).
3.
Rules Concerning Certification of the Electric Reliability Organization; and Procedures for the Establishment, Approval, and Enforcement of Electric Reliability Standards,
Order No. 672, FERC Stats. & Regs. ¶ 31,204,
order on reh'g,
Order No. 672-A, FERC Stats. & Regs. ¶ 31,212 (2006).
4.
North American Electric Reliability Corp.,
116 FERC ¶ 61,062,
order on reh'g and compliance,
117 FERC ¶ 61,126 (2006),
order on compliance,
118 FERC ¶ 61,190,
order on reh'g,
119 FERC ¶ 61,046 (2007),
aff'd sub nom. Alcoa Inc.
v.
FERC,
564 F.3d 1342 (D.C. Cir. 2009).
5.
Burden is defined as the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a federal agency. See 5 CFR 1320 for additional information on the definition of information collection burden.
6.
The estimated hourly cost (salary plus benefits) is a combination of the following categories from the BLS website,
http://www.bls.gov/oes/current/naics2_22.htm:
75% of the average of an Electrical Engineer (17-2071) $71.19/hr., × .75 = 53.3925 ($53.39-rounded) ($53.39/hour); and 25% of an Information and Record Clerk (43-4199) $40.51/hr., $40.51 × .25 = 10.1275 ($10.13 rounded) ($10.13/hour), for a total ($53.39 + $10.13 = $63.52/hour).
7.
The “Number of Entity” data is compiled from the February 9, 2026, edition of the NERC Compliance Registry. “DP” means distribution provided; “GOP” means generator operator; “PC” means planning coordinator; “TO” means transmission owner.”