This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
Comments on the collection of information are due May 4, 2026.
Table of Contents
Enhanced Content - Table of Contents
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
47
as of
07/15/2026 at 10:15 pm EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2026-04270 as it appeared on Public Inspection on
03/03/2026 at 8:45 am.
It was viewed
7
times while on Public Inspection.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2026-04270 (91 FR 10598)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Federal Energy Regulatory Commission.
ACTION:
Notice of information collection and request for comments.
SUMMARY:
In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection, FERC-725T, Mandatory Reliability Standards for the Bulk-Power System: Texas Reliability Entity (TRE) Reliability Standards.
DATES:
Comments on the collection of information are due May 4, 2026.
ADDRESSES:
You may submit comments (identified by Docket No. IC26-22-000) by either of the following methods:
Mail/Hand Delivery/Courier:
Federal Energy Regulatory Commission, Secretary of the Commission, at Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852.
Docket:
Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do so at
https://www.ferc.gov/docs-filing/docs-filing.asp.
Title:
FERC-725T, Mandatory Reliability Standards for the Bulk-Power System: TRE Reliability Standards BAL-001-TRE-2 (Primary Frequency Response in the ERCOT Region).
OMB Control No.:
1902-0273.
Type of Request:
Three-year extension of the FERC-725T information collection requirements with no changes to the current reporting requirements.
Abstract:
TRE Reliability Standards apply to entities registered as Generator Owners (GOs), Generator Operators (GOPs), and Balancing Authorities (BAs) within the Texas Reliability Entity region.
The information collection requirements entail the setting or configuration of the Control System software, identification and recording of events, data retention, and submitting frequency measurable events to the compliance enforcement authority (Regional Entity or NERC).
( printed page 10599)
Submitting frequency measurable events—The BA is required to identify and post information regarding Frequency Measurable Events (FME). Further, the BA must calculate and report to the Compliance Enforcement Authority data related to Primary Frequency Response (PFR) performance of each generating unit/generating facility.
Data retention—The BA, GO, and GOP shall keep data or evidence to show compliance, as identified below, unless directed by its Compliance Enforcement Authority to retain specific evidence for a longer period of time as part of an investigation. Compliance audits are generally about three years apart.
The BA shall retain a list of identified Frequency Measurable Events and shall retain FME information since its last compliance audit.
The BA shall retain all monthly PFR performance reports since its last compliance audit.
The BA shall retain all annual Interconnection minimum Frequency Response calculations, and related methodology and criteria documents, relating to time periods since its last compliance audit.
The BA shall retain all data and calculations relating to the Interconnection's Frequency Response, and all evidence of actions taken to increase the Interconnection's Frequency Response, since its last compliance audit.
Each GOP and GO shall retain evidence since its last compliance audit.
Type of Respondents:
NERC Registered entities: Balancing Authorities (BA), Generator Owners (GO), Generator Operators (GOP).
Estimate of Annual Burden:[1]
The Commission estimates the annual public reporting burden for the information collection as:
FERC-725T (Mandatory Reliability Standards for the Bulk-Power System: TRE Reliability Standards)
Number of
respondents 2
Annual number
of responses
per respondent
Total number
of responses
Average burden
& cost per
response 3
Total annual
burden hours & total annual cost
Cost per
respondent
($) rounded
(1)
(2)
(1) * (2) = (3)
(4)
(3) * (4) = (5)
(5) ÷ (1)
Annual Review and Evidence Retention
1 (BA)
1
1
18 hrs.; $1,143.36
18 hrs.; $1,143.36
$1,143
309 (GO)
1
309
2 hrs.; $127.04
618 hrs.; $39,255.36
127
220 (GOP)
1
220
2 hrs.; $127.04
440 hrs.; $27,948.80
127
Total
530
1,076 hrs.; $68.347.52
Comments:
Comments
are invited on: (1) whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency's estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology.
Dated: February 27, 2026.
Debbie-Anne A. Reese,
Secretary.
Footnotes
1.
Burden is defined as the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. For further explanation of what is included in the information collection burden, reference 5 Code of Federal Regulations 1320.3.
2.
BA (balancing authority), GO (generator owner), GOP (generator operator). The entity counts were taken from the NERC Compliance Registration document as of February 9, 2026.
3.
The estimated hourly cost (salary plus benefits) is a combination of the following categories from the BLS website,
http://www.bls.gov/oes/current/naics2_22.htm:
75% of the average of an Electrical Engineer (17-2071) $71.19/hr., × .75 = 53.3925 ($53.39-rounded) ($53.39/hour); and 25% of an Information and Record Clerk (43-4199] $40.51/hr., $40.51 × .25 = 10.1275 ($10.13 rounded) ($10.13/hour), for a total ($53.39 + $10.13 = $63.52/hour).