This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Proposed Rule
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Comments are no longer being accepted.
See DATES for details.
736 comments have
been received at Regulations.gov.
Agencies review all submissions and may choose to redact, or withhold,
certain submissions (or portions thereof). Submitted comments may not be
available to be read until the agency has approved them.
Docket Title
Document ID
Comments
NRC Reviews of Reactor Designs Previously Authorized by U.S. Department of Energy or Department of War (formerly titled Streamlined Reviews of Proven Reactor Designs)
FederalRegister.gov retrieves relevant information about this document
from Regulations.gov to provide users with additional context. This
information is not part of the official Federal Register document.
NRC Reviews of Reactor Designs Previously Authorized by U.S. Department of Energy or Department of War (formerly titled Streamlined Reviews of Proven Reactor Designs)
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
2,791
as of
06/17/2026 at 2:15 pm EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2026-06414 as it appeared on Public Inspection on
04/01/2026 at 8:45 am.
It was viewed
91
times while on Public Inspection.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2026-06414 (91 FR 16584)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Nuclear Regulatory Commission.
ACTION:
Proposed rule; public meeting; and request for comment.
SUMMARY:
The U.S. Nuclear Regulatory Commission (NRC) is proposing to revise its regulations to facilitate direct leveraging of prior U.S. Department of Energy or Department of War authorizations of demonstration reactors into the NRC's licensing reviews of commercial reactor facility applications that reference those designs. This rulemaking would improve NRC licensing review efficiency, where applicable, by explicitly establishing by regulation an additional means for reactor applicants to demonstrate the safety functions of their reactor designs, and thus, would contribute to the safe and secure use and deployment of civilian nuclear energy technologies.
DATES:
Submit comments by May 4, 2026.
ADDRESSES:
Submit your comments, identified by Docket ID NRC-2025-1503, at
https://www.regulations.gov.
If your material cannot be submitted using
https://www.regulations.gov,
call or email the individuals listed in the
FOR FURTHER INFORMATION CONTACT
section of this document for alternate instructions.
Do not include any personally identifiable information (such as name, address, or other contact information) or confidential business information that you do not want publicly disclosed. All comments are public records; they are publicly displayed exactly as received and will not be deleted, modified, or redacted. Comments may be submitted anonymously.
You can read a plain language description of this proposed rule at
https://www.regulations.gov/docket/NRC-2025-1503.
For additional direction on obtaining information and submitting comments, see “Obtaining Information and Submitting Comments” in the
SUPPLEMENTARY INFORMATION
section of this document.
FOR FURTHER INFORMATION CONTACT:
Aaron Kwok, Office of Nuclear Material Safety and Safeguards, telephone: 301-415-1371, email:
Aaron.Kwok@nrc.gov
and James Kinsey, Office of Nuclear Reactor Regulation, telephone: 301-415-0754, email:
James.Kinsey@nrc.gov.
Both are staff of the U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
D. Executive Order 14270: Zero-Based Regulatory Budgeting To Unleash American Energy
XII. Voluntary Consensus Standards
XIII. Availability of Guidance
XIV. Availability of Documents
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2025-1503 when contacting the NRC about the availability of information for this action. You may obtain publicly available information related to this action by any of the following methods:
NRC's Agencywide Documents Access and Management System (ADAMS):
You may obtain publicly available documents online in the ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/adams.html.
To begin the search, select “Begin ADAMS Public Search.” For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, at 301-415-4737, or by email to
PDR.Resource@nrc.gov.
For the convenience of the reader, instructions about obtaining materials referenced in this document are provided in the “Availability of Documents” section.
NRC's PDR:
The PDR, where you may examine and order copies of publicly available documents, is open by appointment. To make an appointment to visit the PDR, please send an email to
PDR.Resource@nrc.gov
or call 1-800-397-4209 or 301-415-4737, between 8 a.m. and 4 p.m. eastern time, Monday through Friday, except Federal holidays.
Public Meeting: The NRC may conduct a public meeting to describe the proposed amendments and answer questions from the public on the proposed rule. If the NRC determines it will hold a public meeting, NRC will publish a notice of the location, time, and agenda of the meeting on the NRC's public meeting website within 10 calendar days of the meeting. Stakeholders should monitor the NRC's public meeting website for information about the public meeting at:
https://www.nrc.gov/public-involve/public-meetings/index.cfm.
B. Submitting Comments
The NRC encourages electronic comment submission through the Federal rulemaking website (
https://www.regulations.gov). Please include Docket ID NRC-2025-1503 in your comment submission.
The NRC cautions you not to include identifying or contact information that you do not want to be publicly disclosed in your comment submission. The NRC will post all comment submissions at
https://www.regulations.gov
as well as enter the comment submissions into ADAMS. The NRC does not routinely edit comment submissions to remove identifying or contact information.
If you are requesting or aggregating comments from other persons for submission to the NRC, then you should inform those persons not to include identifying or contact information that they do not want to be publicly disclosed in their comment submission. Your request should state that the NRC does not routinely edit comment submissions to remove such information before making the comment submissions available to the public or entering the comment into ADAMS.
On May 23, 2025, President Donald J. Trump signed Executive Order (E.O.) 14300, “Ordering the Reform of the Nuclear Regulatory Commission.” Section 5, “Reforming and Modernizing the NRC's Regulations,” requires the NRC to undertake a review and wholesale revision of its regulations and guidance documents as guided by the policies set forth in section 2 of E.O. 14300. This rulemaking addresses section 5(d), which requires the NRC to establish an expedited pathway to approve reactor designs that the U.S. Department of Energy (DOE) or the Department of War (DOW) have tested and that have demonstrated the ability to function safely.[1] E.O. 14300 further states that NRC review of such designs shall focus solely on risks that may arise from new applications permitted by NRC licensure, rather than revisiting risks that have already been addressed in the DOE or DOW processes.
III. Discussion
The NRC is proposing to amend title 10 of the
Code of Federal Regulations
(10 CFR) section 50.43, “Additional standards and provisions affecting class 103 licenses and certifications for commercial power,” and section 53.440, “Design requirements,” to explicitly establish a pathway for streamlined reviews for licensing commercial reactor designs that have previously received DOE or DOW authorization and that have been tested and demonstrated the ability to function safely. The amendment to § 50.43 would explicitly establish such a pathway for the licensing frameworks under 10 CFR part 50, “Domestic Licensing of Production and Utilization Facilities,” and part 52, “Licenses, Certifications, and Approvals for Nuclear Power Plants,” whereas the amendment to § 53.440 would do so for the 10 CFR part 53, “Risk-Informed, Technology-Inclusive Regulatory Framework for Commercial Nuclear Plants,” licensing framework. An analogous provision will be included in a separate proposed rule, “Licensing Requirements for Microreactors and Other Reactors with Comparable Risk Profiles,” which, if finalized, would apply to the associated proposed 10 CFR part 57, “Licensing Requirements for Microreactors and Other Reactors with Comparable Risk Profiles,” licensing framework. The primary intent of this rulemaking is to improve NRC licensing review efficiency, and thus capacity, for conducting licensing reviews. In turn, this would contribute to the safe and secure use and deployment of civilian nuclear energy technologies.
Section 50.43(e) currently provides two options for license applicants to demonstrate how newer reactor designs, including those that use simplified, inherent, passive, or other innovative means, accomplish their safety functions. The proposed rule would add a third option to be codified in § 50.43(e)(3). Specifically, the proposed rule would include the ability to reference a prior DOE or DOW authorization and successful testing and demonstration of the ability of the authorized design to function safely as another means for NRC license applicants to show that the design can accomplish its safety functions.
The amendment to § 50.43 would explicitly reflect the option for NRC Class 103 license applicants to directly reference a prior DOE or DOW authorization when demonstrating compliance with NRC regulatory requirements. Applicants using this
( printed page 16586)
option would be required to identify how aspects of the prior authorization satisfy NRC regulations. The applicant would also be required to address how any changes to the design, its functionality, associated hazards, siting information, or underlying safety assumptions from those considered in prior authorization reviews meet applicable NRC requirements.
Under the part 53 licensing framework, § 53.440(a) currently provides a series of design requirements. The requirements in § 53.440(a)(1) reflect an essential element of ensuring a proposed design can comply with the performance criteria in part 53, namely that the abilities of design features to fulfill their safety functions are demonstrated by a combination of analyses, test programs, prototype testing, and operating experience. This requirement closely aligns with the language in § 50.43(e) and reflects the same foundational requirement.
The amendment to § 53.440 would explicitly accommodate the option for NRC Class 103 license applicants to directly reference a prior DOE or DOW authorization for the purpose of demonstrating that the design features required by § 53.400 meet the defined functional design criteria required by §§ 53.410 and 53.420. Such a demonstration would be required to consider interdependent effects throughout the commercial nuclear plant and the range of conditions under which the design features required by § 53.400 must function throughout the plant's lifetime. Applicants using this option would be required to identify how aspects of the prior authorization satisfy applicable NRC regulations.
The proposed §§ 50.43(e) and 53.440(a)(1) pathways would be supported by new, publicly available guidance applicable to the review of applications for NRC Class 103 licenses that reference a DOE or DOW authorization. Those guidance documents are not a part of this proposed rulemaking. The NRC instead plans to provide such guidance in the future. The scope of such guidance would facilitate licensing of future commercial nuclear plants, including advanced reactor designs that may not employ light-water technology.
The NRC prepared an unofficial redline strikeout version of the proposed changes to the regulatory text that is intended to help the reader identify the proposed changes. The unofficial redline strikeout version of the proposed rule is publicly available and is listed in the “Availability of Documents” section.
IV. Regulatory Flexibility Certification
As required by the Regulatory Flexibility Act of 1980, 5 U.S.C. 605(b), the Commission certifies that this rule, if adopted, will not have a significant economic impact on a substantial number of small entities. This proposed rule affects only the licensing and operation of nuclear power plants. The companies that would own these plants are not expected to fall within the scope of the definition of “small entities” set forth in the Regulatory Flexibility Act or the size standards established by the NRC (10 CFR 2.810).
V. Regulatory Analysis
The NRC has not prepared a separate draft regulatory analysis on the proposed changes. However, the NRC performed a qualitative economic analysis of the rule impacts. As a result of this proposed rule, the NRC expects that the NRC would not need to repeat technical reviews previously performed by DOE or DOW, to the extent that those reviews cover the same scope as the related content in the NRC license application. In general, the NRC expects cost savings to both applicants in preparing an application and the NRC in reviewing that application. The NRC was not able to quantify these potential savings in a useful way at this time. These savings would depend on the applicability of the DOE/DOW reviews to NRC requirements and the ability of applicants to demonstrate that applicability, the number of applications that may reference a previous DOE/DOW authorization, as well as how any potential differences (
e.g.,
changes to the design or site-specific factors) from the previously authorized design also meet NRC requirements.
VI. Backfitting and Issue Finality
The proposed changes to 10 CFR 50.43(e) and 53.440(a)(1) would not impose new or revised requirements on existing licensees or approval holders because they include an option that would apply only to future applicants. Therefore, the proposed changes would not constitute backfitting as defined in §§ 50.109(a)(1) or 53.1590(a)(1) or affect the issue finality of an existing approval issued under 10 CFR part 52, “Licenses, Certifications, and Approvals for Nuclear Power Plants.”
VII. Cumulative Effects of Regulation
The NRC seeks to minimize potential negative consequences resulting from the cumulative effects of regulation (CER). The NRC believes that any de-regulatory impacts of this rulemaking activity would be unlikely to cause implementation challenges for stakeholders. In addition, during the pendency of this rulemaking, the NRC is deprioritizing issuance of regulatory actions (
e.g.,
orders, generic communications, license amendment requests, and inspection findings of a generic nature) that might influence the implementation date for the new rule, should the proposed rule be finalized.
To fully understand any potential CER implications that could result from this rulemaking, the NRC is asking the following questions. Response to these questions is voluntary and any input would be considered during development of the final rule.
1. Are there unintended consequences related to this rulemaking and how should they be addressed? Please provide a rationale for your response.
2. Please comment on the NRC's cost and benefit analysis in the regulatory analysis that supports this proposed rule.
VIII. Plain Writing
The Plain Writing Act of 2010 (Pub. L. 111-274) requires Federal agencies to write documents in a clear, concise, and well-organized manner. The NRC has written this document to be consistent with the Plain Writing Act as well as the Presidential Memorandum, “Plain Language in Government Writing,” published June 10, 1998 (63 FR 31885). The NRC requests comment on this document with respect to the clarity and effectiveness of the language used.
IX. National Environmental Policy Act
The NRC has determined that this proposed rule is the type of action eligible for categorical exclusion because it meets the criterion described in 10 CFR 51.22(c)(3). This provision includes amendments to parts 50 and 53 related to procedures for filing and reviewing applications for licenses or construction permits or early site permits or other forms of permission or for amendments to or renewals of licenses or construction permits or early site permits or other forms of permission. The action belongs to a category of actions which the Commission, by rule or regulation, has declared to be a categorical exclusion, after first finding that the category of actions does not individually or cumulatively have a significant effect on the human environment. Therefore, neither an environmental impact statement nor environmental assessment has been prepared for this proposed rule. For any particular licensing action that would use the pathways proposed by this rule, the NRC will comply with its obligations under the National
( printed page 16587)
Environmental Policy Act, including by developing or using an environmental impact statement, environmental assessment, or categorical exclusion, as applicable.
X. Paperwork Reduction Act
This proposed rule does not contain any new or amended collections of information subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501et seq.). Existing collections of information were approved by the Office of Management and Budget (OMB), approval number 3150-0011.
Public Protection Notification
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless the document requesting or requiring the collection displays a currently valid OMB control number.
XI. Executive Orders
The following are Executive Orders that are related to this proposed rule:
The Office of Information and Regulatory Affairs (OIRA) has determined that this proposed rule is a significant regulatory action. Accordingly, the NRC submitted this proposed rule to OIRA for review. The NRC is required to conduct an economic analysis in accordance with section 6(a)(3)(B) of E.O. 12866. More can be found in Section V of this document, “Regulatory Analysis.”
This action is tentatively determined to be a deregulatory action as defined by E.O. 14192. Details on the estimated costs of this proposed rule can be found in Section V of this document, “Regulatory Analysis.”
D. Executive Order 14270: Zero-Based Regulatory Budgeting To Unleash American Energy
E.O. 14270, “Zero-Based Regulatory Budgeting to Unleash American Energy,” requires the NRC to insert a conditional sunset date into all new or amended NRC regulations provided the regulations are (1) promulgated under the Atomic Energy Act of 1954, as amended (AEA), the Energy Reorganization Act of 1974, as amended (ERA), or the Nuclear Waste Policy Act of 1982, as amended (NWPA); (2) not statutorily required; and (3) not part of the NRC's permitting regime. The NRC determined that the regulatory changes proposed in this rule are part of the NRC's regulatory permitting scheme authorized by the AEA, ERA, or NWPA. Therefore, the NRC views this rulemaking to be outside the scope of E.O. 14270 and did not insert conditional sunset dates for the regulatory changes in this proposed rule.
XII. Voluntary Consensus Standards
The National Technology Transfer and Advancement Act of 1995, Public Law 104-113, requires that Federal agencies use technical standards that are developed or adopted by voluntary consensus standards bodies unless the use of such a standard is inconsistent with applicable law or otherwise impractical. In this proposed rule, the NRC will revise its regulations to facilitate direct leveraging of prior DOE or DOW authorizations of demonstration reactors into the NRC's licensing reviews of commercial reactor facility applications that utilize those designs. This action does not constitute the establishment of a standard that contains generally applicable requirements.
XIII. Availability of Guidance
The NRC will be issuing new guidance for the implementation of the proposed amendments in this rulemaking. The NRC will publish
Federal Register
notices announcing the availability of the new guidance documents. The documents will be available at
https://www.regulations.gov
by searching on Docket ID NRC-2025-1503.
XIV. Availability of Documents
The documents identified in the following table are available to interested persons through one or more of the following methods, as indicated.
Document
ADAMS
accession No./web link/
Federal Register
citation
Proposed Rule Documents
Unofficial Redline Rule Language for the Proposed Rule—NRC Reviews of Reactor Designs Previously Authorized by U.S. Department of Energy or Department of War, March 31, 2026
The NRC may post materials related to this document, including public comments, on the Federal rulemaking website at
https://www.regulations.gov
under Docket ID NRC-2025-1503. In addition, the Federal rulemaking website allows members of the public to receive alerts when changes or additions occur in a docket folder. To subscribe:
( printed page 16588)
(1) navigate to the docket folder (NRC-2025-1503); (2) click the “Subscribe” button; and (3) enter an email address and click on the “Subscribe” button.
For the reasons set out in the preamble and under the authority of the Atomic Energy Act of 1954, as amended; the Energy Reorganization Act of 1974, as amended; and 5 U.S.C. 552 and 553, the NRC is proposing to amend 10 CFR parts 50 and 53:
PART 50—DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES
1. The authority citation for part 50 continues to read as follows:
Additional standards and provisions affecting class 103 licenses and certifications for commercial power.
* * * * *
(e) * * *
(3) The application includes consideration of relevant information gathered from a design that has been previously authorized by the Department of Energy or the Department of Defense as a utilization facility and that has been tested and has demonstrated the ability to function safely. Any reference to such a design must identify how attributes of the authorization satisfy NRC regulations.
PART 53—RISK-INFORMED, TECHNOLOGY-INCLUSIVE REGULATORY FRAMEWORK FOR COMMERCIAL NUCLEAR PLANTS
3. The authority citation for part 53 continues to read as follows, as amended at 91 FR 15696 (March 30, 2026; effective April 29, 2026):
(a)(1) Analysis, appropriate test programs, prototype testing, operating experience, or a combination thereof must demonstrate that each design feature required by § 53.400 meets the defined functional design criteria required by §§ 53.410 and 53.420. This demonstration must consider interdependent effects throughout the commercial nuclear plant and the range of conditions under which the design features required by § 53.400 must function throughout the plant's lifetime. The bases for this demonstration may include consideration of relevant information gathered from a utilization facility that has been previously authorized by the Department of Energy or the Department of Defense and which has been tested and has demonstrated the ability to function safely. Any reference to such a design must identify how attributes of the authorization satisfy NRC regulations.
* * * * *
Dated: March 31, 2026.
For the Nuclear Regulatory Commission.
Carrie Safford,
Secretary of the Commission.
Footnotes
1.
Consistent with E.O. 14347, “Restoring the United States Department of War,” this
Federal Register
notice refers to the “Department of War” and “Department of Defense” interchangeably. Per section 2(d) of E.O. 14347, the proposed regulatory text for this limited scope rulemaking would continue to use the title, “Department of Defense,” to avoid creating inconsistencies with or causing confusion in the NRC's existing regulations in title 10 of the
Code of Federal Regulations.
736 comments have been received at Regulations.gov.
Agencies review all submissions and may choose to redact, or withhold, certain submissions (or portions thereof). Submitted comments may not be available to be read until the agency has approved them.