This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
Interested persons are invited to submit comments on or before October 13, 2026.
Table of Contents
Enhanced Content - Table of Contents
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Comments are no longer being accepted.
See DATES for details.
2 comments have
been received at Regulations.gov.
Agencies review all submissions and may choose to redact, or withhold,
certain submissions (or portions thereof). Submitted comments may not be
available to be read until the agency has approved them.
FederalRegister.gov retrieves relevant information about this document
from Regulations.gov to provide users with additional context. This
information is not part of the official Federal Register document.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
102
as of
10/15/2026 at 12:15 pm EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2026-16592 as it appeared on Public Inspection on
08/13/2026 at 8:45 am.
It was viewed
13
times while on Public Inspection.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2026-16592 (91 FR 52776)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Federal Railroad Administration (FRA), Department of Transportation (DOT).
ACTION:
Notice of information collection; request for comment.
SUMMARY:
Under the Paperwork Reduction Act of 1995 (PRA) and its implementing regulations, FRA seeks approval of the Information Collection Request (ICR) summarized below. Before submitting this ICR to the Office of Management and Budget (OMB) for approval, FRA is soliciting public comment on specific aspects of the activities identified in the ICR.
DATES:
Interested persons are invited to submit comments on or before October 13, 2026.
ADDRESSES:
Written comments and recommendations for the proposed ICR should be submitted on
https://www.regulations.gov
to Docket No. FRA-2026-0039. All comments received will be posted without change to the docket, including any personal information provided. Please refer to the assigned OMB control number (2130-0599) in any correspondence submitted. FRA will summarize comments received in response to this notice in a subsequent notice, made available to the public, and include them in its information collection submission to OMB for approval.
FOR FURTHER INFORMATION CONTACT:
Ms. Joanne Swafford, Information Collection Clearance Officer, at email:
joanne.swafford@dot.gov
or telephone: (757) 897-9908.
SUPPLEMENTARY INFORMATION:
The PRA, 44 U.S.C. 3501-3520, and its implementing regulations, 5 CFR part 1320, require Federal agencies to provide 60 days' notice to the public to allow comment on information collection activities before seeking OMB approval of the activities.
See44 U.S.C. 3506, 3507; 5 CFR 1320.8 through 1320.12. Specifically, FRA invites interested parties to comment on the following ICR regarding: (1) whether the information collection activities are necessary for FRA to properly execute its functions, including whether the activities will have practical utility; (2) the accuracy of FRA's estimates of the burden of the information collection activities, including the validity of the methodology and assumptions used to determine the estimates; (3) ways for FRA to enhance the quality, utility, and clarity of the information being collected; and (4) ways for FRA to minimize the burden of information collection activities on the public, including the use of automated collection techniques or other forms of information technology.
See44 U.S.C. 3506(c)(2)(A); 5 CFR 1320.8(d)(1).
FRA believes that soliciting public comment may reduce the administrative and paperwork burdens associated with the collection of information that Federal regulations mandate. In summary, comments received will advance three objectives: (1) reduce reporting burdens; (2) organize information collection requirements in a “user-friendly” format to improve the use of such information; and (3) accurately assess the resources expended to retrieve and produce information requested.
See44 U.S.C. 3501.
The summary below describes the ICR that FRA will submit for OMB clearance as the PRA requires:
Title:
System Safety Program.
OMB Control Number:
2130-0599.
Abstract:
In 2020, FRA issued a final rule [1]
that requires each passenger rail operation to develop and implement a System Safety Program (SSP) to improve the safety of its operations. Each passenger rail operation must use its SSP to proactively identify and mitigate or eliminate railroad safety hazards and the resulting risk on its system to reduce the number of railroad accidents, incidents, and associated injuries, fatalities, and property damage. An SSP must also include a Fatigue Risk Management Program (FRMP) component, as required by a final rule FRA issued in 2022.[2]
The purpose of an FRMP is to improve railroad safety through structured, systematic, and proactive processes and procedures that a railroad develops and implements to identify and mitigate the effects of fatigue on its employees.[3]
A passenger rail operation has the flexibility to tailor an SSP to its specific operations. An SSP must be fully implemented within 36 months of FRA's approval of a submitted SSP plan. Under the SSP regulation, FRA will audit a passenger rail operation's compliance with its SSP plan and will use the information collected to ensure compliance with the regulation.
FRA uses the information collected to help ensure that passenger rail operations establish and implement SSPs to improve the safety of their operations and to confirm compliance with the rule.
In this 60-day notice, FRA made multiple adjustments to the previously approved burden hours. While some reported burden hours have increased, the overall burden hours have decreased from the previously approved 1,891 hours to 1,781 hours. In general, the revised estimates reflect that the number of total passenger rail operations decreased from 33 to 32 and that FRA lowered its estimate of new passenger rail operations from 1 annually to 1 over the next 3-year period of this information collection.
To more effectively manage its ICRs, FRA is also incorporating into this ICR the burden hours under 49 CFR 270.409,
Requirements for an FRMP Plan,
currently reported under Control No. 2130-0633, Fatigue Risk Management Program. The table below details the specific paperwork requirements and associated burden hours added for section 270.409.
Type of Request:
Revision of a currently approved collection.
—(a) through (p) Comprehensive written SSP plan that meets this section's requirements and in part 270, subpart E
1 new passenger rail operation
0.33 plan
40 hours
13.20 hours
$121.22
$1,600.10
—(q) Risk-based hazard analysis
(1) analysis to identify and analyze hazards on the rail system and to determine the resulting risks
32 passenger rail operations + 1 new passenger rail operation
32.33 analyses results
20 hours
646.60 hours
90.19
58,316.85
(2) Identification of specific actions that will be implemented to mitigate or eliminate the hazards and resulting risks identified by paragraph (q)(1)
32 passenger rail operations + 1 new passenger rail operation
32.33 identifications of mitigation actions
10 hours
323.30 hours
90.19
29,158.43
(3) Risk-based hazard analysis when there are significant operational changes or modifications that have a direct impact on railroad safety
32 passenger rail operations
3 analyses
10 hours
30 hours
90.19
2,705.70
—(r) Technology analysis and implementation plan
—Development and periodic update as necessary, of a technology analysis and implementation plan to be included in the SSP
32 passenger rail operations + 1 new passenger rail operation
32.33 technology analysis
10 hours
323.30 hours
90.19
29,158.43
270.107 Consultation requirements
—(a) Consultation with directly affected employees on new or amended SSP plan (This section includes the burden for consulting on an FRMP plan, which must be included in an SSP plan)
32 passenger rail operations + 1 new passenger rail operation
5.33 consults
1 hour
5.33 hours
90.19
480.71
—(a)(3)(ii) Notification to directly affected employees of preliminary meeting at least 60 days before being held
32 passenger rail operations + 1 new passenger rail operation
5.33 notices
30 minutes
2.67 hours
90.19
240.36
—(b)(1) through (b)(3) Consultation statements submitted with new or amended SSP plans, and statement copies to service list individuals
32 passenger rail operations + 1 new passenger rail operation
5.33 statements
1 hour
5.33 hours
90.19
480.71
—(c) Statements from directly affected employees
FRA anticipates zero railroad submissions during this 3-year ICR period.
—(d) Consultation requirements for SSP plan amendments to be included in written SSP plan
The estimated paperwork burden for this regulatory requirement is covered under § 270.103.
270.201 Filing and approval
—(a) and (b) Initial SSP plan submission
1 new passenger rail operation
0.33 plans
30 hours
9.90 hours
90.19
892.88
—(c) Submission of amended SSP plan previously approved
32 passenger rail operations
5 amended plans
20 hours
100 hours
90.19
9,019.00
270.203 Retention of system safety program plan
—Retained copies of SSP plans
32 passenger rail operations + 1 new passenger rail operation
32.33 copies
10 minutes
5.39 hours
90.19
486.12
270.303 Internal system safety program assessment
—Annual internal SSP assessments
32 passenger rail operations
32 evaluations/reports
2 hours
64 hours
90.19
5,772.16
—(c) Certification of results of internal assessment by chief safety official
32 passenger rail operations
32 certification statements
2 hours
64 hours
121.22
7,758.08
270.305 External safety audit
—(b)(1) Submission of improvement plans in response to results of FRA audit
32 passenger rail operations
4 plans
12 hours
48 hours
121.22
5,818.56
—(b)(2) Improvement plans found deficient by FRA and requiring revision/correction
32 passenger rail operations
2 revised/ corrected plans
10 hours
20 hours
90.19
1,803.80
( printed page 52778)
—(b)(3) Status report to FRA of implementation of improvements in the improvement plan
32 passenger rail operations
2 reports
4 hours
8 hours
90.19
721.52
270.409 Requirements for an FRMP plan (Previously reported under 2130-0633)
1 new passenger rail operation
0.33 plans
78 hours
25.74 hours
90.19
2,321.49
—(a) through (d)— New FRMP plan as part of an SSP containing the following elements:
• Analysis of fatigue risk • Mitigation strategies
• Evaluation—processes to monitor the overall effectiveness of the FRMP
• FRMP implementation plan
—Initial meeting with FRA to review FRMP plan
1 new passenger rail operation
0.33 meetings
16 hours
5.28 hours
90.19
476.20
—Amendments to FRMP plans already approved (§ 270.405(c)(2))
32 passenger rail operations
2 amended plans
40 hours
80 hours
90.19
7,215.20
Appendix B to 270
—Additional documents provided to FRA upon request
32 passenger rail operations + 1 new passenger rail operation
4 documents
15 minutes
1 hour
90.19
90.19
Totals 5
33 Passenger rail operations
233 responses
1,781 hours
164,516.50
Total Estimated
Annual Responses:
233.
Total Estimated Annual Burden:
1,781 hours.
Total Estimated Annual Burden Hour Dollar Cost Equivalent:
$164,516.50.
FRA informs all interested parties that it may not conduct or sponsor, and a respondent is not required to respond to, a collection of information that does not display a currently valid OMB control number.
4.
The dollar equivalent cost is derived from the 2024 Surface Transportation Board Full Year Wage A&B data series using employee group 200 (Professional & Administrative) hourly wage rate of $51.54 and employee group 100 (Executives, Officials, & Staff Assistants) hourly wage rate of $69.27. The total burden wage rate (straight time plus 75%) used in the table is $90.19 ($51.54 × 1.75 = $90.19) and $121.22 ($69.27 × 1.75 = $121.22).
2 comments have been received at Regulations.gov.
Agencies review all submissions and may choose to redact, or withhold, certain submissions (or portions thereof). Submitted comments may not be available to be read until the agency has approved them.