This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
Thank you for taking the time to create a comment. Your input is important.
Once you have filled in the required fields below you can preview and/or submit your comment to the Energy Department for review. All comments are considered public and will be posted online once the Energy Department has reviewed them.
Comments on the collections of information are due October 26, 2026.
Table of Contents
Enhanced Content - Table of Contents
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
70
as of
10/13/2026 at 8:15 pm EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2026-17318 as it appeared on Public Inspection on
08/24/2026 at 8:45 am.
It was viewed
10
times while on Public Inspection.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2026-17318 (91 FR 54869)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Federal Energy Regulatory Commission.
ACTION:
Notice of information collection and request for comments.
SUMMARY:
In compliance with the requirements of the Paperwork Reduction Act of 1995, 44 U.S.C. 3506(c)(2)(A), the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection, FERC-725S (OMB Control No. 1902-0270), Emergency Preparedness and Operations (EOP) Reliability Standards.
DATES:
Comments on the collections of information are due October 26, 2026.
ADDRESSES:
Please submit comments via email to
DataClearance@FERC.gov. You must specify Docket No. (RD26-8-000) and the FERC Information Collection number (FERC-725S) in your email. If you are unable to file electronically, comments may be filed by USPS mail or by hand (including courier) delivery:
Mail via U.S. Postal Service only, addressed to:
Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street NE, Washington, DC 20426.
Hand (including courier) delivery to:
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, MD 20852.
SUPPLEMENTARY INFORMATION:
Title:
FERC-725S, Emergency Preparedness and Operations (EOP) Reliability Standards.
OMB Control No.:
1902-0270.
Type of Request:
Approval of the FERC-725S information collection requirements with changes to the current reporting requirements.
Type of Respondents:
Draft Reliability Standard EOP-004-5 improves upon the existing Reliability Standard EOP-004-4 by ensuring timely reporting by industry to the North America Electric Reliability Corporation (NERC) through the reporting of events involving Inverter Based-Resources (IBRs). Changes were made to Attachment 1 for an unexpected loss of generation within a Balancing Authority Area from IBR(s) in a period of 30 seconds or less following a disturbance. Additionally, a new classification for generator owner category 2 and generator operator category 2 will now be applicable to potential reporting of events and will be included in estimates for EOP-004 going forward.
For providing accurate reporting of events to NERC's event analysis group to review the impact on the reliability of the bulk electric system, staff estimates that for EOP-004-5, fifty percent of the applicable entities will have an annual reporting burden, and this is captured in the associated table below.
Estimate of Annual Burden[1] and cost
:[2]
The Commission estimates the annual public reporting burden for the information collection as:
( printed page 54870)
FERC-725S
[EOP-004-5 Event Reporting]
Reliability standard and associated
requirement
Number of
respondents 345
Annual
number of
responses per
respondent
Total
number of
responses
Average burden
& cost per
response
Total annual burden & total
annual cost
Cost per
respondent
($)
(1)
(2)
(1) * (2) = (3)
(4)
(3) * (4) = (5) rounded
(5) ÷ (1)
Annual review and record retention for EOP-004-5
49 (BA)
170 (GO)
1
1
49
170
4 hrs. $333.56
8 hrs. $667.12
196 hrs. $16,344
1,360 hrs. $113,410
$333.56
667.12
89 (GOP)
1
89
8 hrs. $667.12
712 hrs. $59,374
667.12
Total EOP-004-5
308
2,268 hrs.; $189,128
Comments:
Comments are invited on: (1) whether
the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency's estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology.
Dated: August 20, 2026.
Carlos D. Clay,
Deputy Secretary.
Footnotes
1.
The Commission defines burden as the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. For further explanation of what is included in the information collection burden, refer to 5 Code of Federal Regulations 1320.3.
2.
The estimated hourly cost (salary plus benefits) is a combination of the following categories from the BLS website,
Occupational Employment and Wage Statistics—source for hourly wages:
75% of the average of an Electrical Engineer (17-2071) $92.32/hr., × .75 = $69.24 ($69.24/hour); and 25% of an Information and Record Clerk (43-4199) $56.60/hr., $56.60 × .25 = $14.15 ($14.15/hour), for a total ($69.24/hour + $14.15/hour = $83.39/hour).
3.
The number of respondents is based on NERC compliance registration information as of July 21, 2026.
4.
The number of respondents for GOs and GOP has increased with registration of applicable Category 2 resources which came into effect May 2026.
5.
For EOP-004-5 it is estimated that fifty percent of applicable entities will have an annual reporting burden and values in the table reflect that consideration (rounded up).
This document has a comment period that ends in 13 days. (10/26/2026) View Comment Instructions