This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
Columbia Basin Hydropower; Notice of Intent To File License Application, Filing of Pre-Application Document (Pad), Commencement of Pre-Filing Process, and Scoping; Request for Comments on the Pad and Scoping Document, and Identification of Issues and Associated Study Requests
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Public Comments
Enhanced Content - Public Comments
This feature is not available for this document.
Regulations.gov Data
Enhanced Content - Regulations.gov Data
Additional information is not currently available for this document.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
77
as of
10/13/2026 at 6:15 am EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2026-17946 as it appeared on Public Inspection on
09/01/2026 at 8:45 am.
It was viewed
13
times while on Public Inspection.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2026-17946 (91 FR 56443)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
( printed page 56443)
a.
Type of Filing:
Notice of Intent to File License Application for a New License and Commencing Pre-filing Process.
b.
Project No.:
2849-017.
c.
Dated Filed:
July 1, 2026.
d.
Submitted By:
Columbia Basin Hydropower (CBH).
e.
Name of Project:
Main Canal Headworks Hydroelectric Project.
f.
Location:
The project is located at the south end of the Banks Lake reservoir, which is part of the Bureau of Reclamation's Columbia Basin Project irrigation system, adjacent to the town of Coulee City in Grant County, Washington. The project occupies 5.4 acres of land, managed by Bureau of Reclamation.
g.
Filed Pursuant to:18 CFR part 5 of the Commission's Regulations.
h.
Potential Applicant Contact:
Alan Lackner, Manager, Columbia Basin Hydropower, 107 D Street NW, Ephrata, Washington 98823; phone at (509) 754-2227 or email at
alackner@cbhydropower.org.
j.
Cooperating agencies:
Federal, state, local, and tribal agencies with jurisdiction and/or special expertise with respect to environmental issues that wish to cooperate in the preparation of the environmental document should follow the instructions for filing such requests described in item o below. Cooperating agencies should note the Commission's policy that agencies that cooperate in the preparation of the environmental document cannot also intervene.
See
94 FERC ¶ 61,076 (2001).
k. With this notice, we are initiating informal consultation with the U.S. Fish and Wildlife Service and/or NOAA Fisheries under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR, Part 402; and the State Historic Preservation Officer, as required by section 106, National Historic Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2.
l. With this notice, we are designating CBH as the Commission's non-federal representative for carrying out informal consultation pursuant to section 7 of the Endangered Species Act, and section 106 of the National Historic Preservation Act.
m. CBH filed with the Commission a Pre-Application Document (PAD; including a proposed process plan and schedule), pursuant to 18 CFR 5.6 of the Commission's regulations.
n. A copy of the PAD may be viewed on the Commission's website (
http://www.ferc.gov), using the “eLibrary” link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at
ferconlinesupport@ferc.gov,
(866) 208-3676 (toll free), or (202) 502-8659 (TTY). A copy is also available for inspection and reproduction at the address in paragraph h.
Register online at
http://www.ferc.gov/docs-filing/esubscription.asp
to be notified via email of new filing and issuances related to this or other pending projects. For assistance, contact FERC Online Support.
o. With this notice, we are soliciting comments on the PAD and Commission's staff Scoping Document 1 (SD1), as well as study requests. All comments on the PAD and SD1, and study requests should be sent to the address above in paragraph h. In addition, all comments on the PAD and SD1, study requests, requests for cooperating agency status, and all communications to and from Commission staff related to the merits of the potential application must be filed with the Commission.
The Commission strongly encourages electronic filing. Please file all documents using the Commission's eFiling system at
https://ferconline.ferc.gov/FERCOnline.aspx.
Commenters can submit brief comments up to 10,000 characters, without prior registration, using the eComment system at
https://ferconline.ferc.gov/FERCOnline.aspx.
For assistance, please contact FERC Online Support at
ferconlinesupport@ferc.gov.
In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Debbie Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, MD 20852. All filings must clearly identify the project name and docket number on the first page: Main Canal Headworks Hydroelectric Project (P-2849-017).
All filings with the Commission must bear the appropriate heading: “Comments on Pre-Application Document,” “Study Requests,” “Comments on Scoping Document 1,” “Request for Cooperating Agency Status,” or “Communications to and from Commission Staff.” Any individual or entity interested in submitting study requests, commenting on the PAD or SD1, and any agency requesting cooperating status must do so on or before 5:00 p.m. Eastern Daylight Time on October 29, 2026.
p.
Scoping Sessions:
Commission staff will hold two scoping sessions in the vicinity of the project at the time and place noted below. All interested individuals, organizations, and agencies are invited to attend one or both of the sessions to provide oral comments. The times and locations of these sessions are as follows:
Daytime Scoping Session
Date:
Wednesday, September 23, 2026.
Time:
9:00 a.m.-11:00 a.m. Pacific Daylight Time (PDT).
Location:
Columbia Basin Hydropower.
Address:
107 D Street NW, Ephrata, Washington 98823.
Evening Scoping Session
Date:
Wednesday, September 23, 2026.
Time:
7:00 p.m.-9:00 p.m. PDT.
Location:
Columbia Basin Hydropower.
Address:
107 D Street NW, Ephrata, Washington 98823.
Scoping Document 1 (SD1), which outlines the subject areas to be addressed in the environmental document, was mailed to the individuals and entities on the Commission's mailing list. Copies of SD1 will be available at the scoping sessions, or may be viewed on the web at
http://www.ferc.gov,
using the “eLibrary” link. Follow the directions for accessing information in paragraph n. Based on all oral and written comments, a Scoping Document 2 (SD2) may be issued. SD2 may include a revised process plan and schedule, as well as a list of issues, identified through the scoping process.
Environmental Site Review
The applicant and Commission staff will conduct an environmental site
( printed page 56444)
review of the project. All interested individuals, agencies, tribes, and NGOs are invited to attend. Please RSVP via email to
wiris@cbhhydropower.org
or at (509) 995-3663
on or before September 18, 2026
if you plan to attend the environmental site review. The time and location of the environmental site review is as follows:
Date:
Thursday, September 24, 2026.
Time:
9:00 a.m. PDT.
Place:
Columbia Basin Hydropower.
Address:
107 D Street NW, Ephrata, Washington 98823.
Participants will meet at Columbia Basin Hydropower's office and depart at 9:00 a.m. (PDT) to the project facilities. All participants are responsible for their own transportation to Columbia Basin Hydropower and the project facilities.
All persons attending the environmental site review must wear sturdy, closed-toe shoes or boots. The applicant will provide hearing protection to attendees for entry into noisy areas, if needed; participants who have their own hardhats should bring them.
Scoping Session Objectives
The primary goal of these scoping sessions is to have you identify the specific environmental issues and concerns that should be considered in the environmental document. Commission staff will prepare either an environmental assessment (EA) or an environmental impact statement (EIS) that will present Commission staff's independent analysis of the issues. The Commission's scoping process will help determine the required level of analysis and satisfy the NEPA scoping requirements, irrespective of whether the Commission prepares an EA or an EIS.
Scoping session participants should come prepared to discuss their issues and/or concerns. Please review the PAD and SD1 in preparation for the scoping sessions. Directions on how to obtain a copy of the PAD and SD1 are included in item n. of this document.
Meeting Procedures
The scoping sessions will begin promptly at their respective start times listed above. If you wish to speak, Commission staff will hand out numbers in the order of your arrival. If no additional numbers have been handed out and all individuals who wish to provide comments have had an opportunity to do so, staff may conclude the session a half hour earlier than the scheduled time.
Your oral comments will be recorded by a court reporter (with FERC staff or FERC representative present) and become part of the public record for this proceeding. Transcripts will be publicly available on FERC's eLibrary system (see paragraph (n) of this notice for instructions on using eLibrary). If a significant number of people are interested in providing oral comments in the one-on-one settings, a time limit of 5 minutes may be implemented for each commentor. Although there will not be a formal presentation, Commission staff will be available throughout the scoping session to answer your questions about the environmental review process. Representatives from CBH will also be present to answer project-specific questions. Proper conduct will help the sessions maintain a respectful atmosphere for attendees to provide comments effectively. Loudspeakers, lighting, oversized visual aids, other visual or audible disturbances, and disruptive video and photographic equipment are not permitted. Recorded interviews are also not permitted within the session space. FERC reserves the right to end the session if disruptions interfere with the opportunity for individuals to provide oral comments or if there is a safety or security risk.
It is important to note that the Commission provides equal consideration to all comments received, whether filed in written form or provided orally at a scoping session.
q. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, contact the Office of Public Participation at (202) 502-6595 or
OPP@ferc.gov.