This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
There is no table of contents available for this document.
Related Documents
Enhanced Content - Related Documents
FederalRegister.gov uses the agency dockets published with the document to display related documents.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
132
as of
10/09/2026 at 2:15 am EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2026-19445 as it appeared on Public Inspection on
09/22/2026 at 8:45 am.
It was viewed
8
times while on Public Inspection.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2026-19445 (91 FR 60370)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared an environmental assessment (EA) for the Texas Access Project (Project), proposed by Kinder Morgan Louisiana Pipeline LLC (KMLP) in the above-referenced docket.[1]
KMLP proposes to construct, install, modify, operate, and maintain an extension of KMLP's interstate natural gas pipeline system and certain related facilities located in Jefferson County, Texas and Cameron and Calcasieu Parishes, Louisiana.
Any person wishing to comment on the EA may do so. To ensure consideration of your comments on the proposal prior to making a decision on the Project, it is important that the Commission receive your comments on or before 5:00 p.m. Eastern Time on October 19, 2026. Instructions for filing comments are provided on pages 2 and 3.
FERC is the lead federal agency for authorizing interstate natural gas transmission facilities under the Natural Gas Act of 1938 (NGA) and the lead federal agency for preparation of the EA. The EA assesses the potential environmental effects of the Project in accordance with the requirements of the National Environmental Policy Act (NEPA) [2]
and the Commission's implementing regulations.[3]
The principal purposes of the EA are to: identify and assess the potential effects on the natural and human environment; describe and evaluate reasonable alternatives; identify and recommend mitigation measures; and facilitate public involvement in the environmental review process. The EA concludes that approval of the proposed Project would not constitute a major federal action significantly affecting the quality of the human environment.
The EA addresses the potential environmental effects of the construction and operation of the following Project facilities:
Installation of 3.05 miles of 48-inch-diameter pipeline from Jefferson County, Texas to Cameron Parish, Louisiana, including a 0.99-mile horizontal directional drill crossing beneath the Sabine-Neches Waterway (Mainline Extension);
Construction of approximately 540 feet of 42-inch-diameter pipeline in Jefferson County for the connection of gas supply from an intrastate pipeline in Texas, the Trident Intrastate Pipeline, to the Mainline Extension;
Construction of approximately 70 feet of 42-inch-diameter pipeline in Jefferson County, Texas for the connection of gas supply from the Texas Header, a new natural gas manifold system located in Jefferson County to be owned and operated by KMLP [4]
to the Mainline Extension;
Construction of approximately 150 feet of 42-inch and 100 feet of 36-inch-diameter pipeline in Cameron Parish for the connection of gas supply from the Mainline Extension to KMLP's existing 42-inch Leg 1 pipeline and 36-inch Leg 2 pipeline, respectively;
Installation of pig [5]
launcher facility and connection at the beginning of the Mainline Extension and the pig receiver facility and tie-in at its terminus;
Modification of KMLP's existing regulator and metering facilities at its existing Sabine Pass Metering Facility in Cameron Parish; and
Installation of a new interconnection with Louisiana LNG Gas Management LLC from KMLP's existing 42-inch-diameter mainline in Calcasieu Parish, Louisiana (Woodside Interconnect).
The Commission mailed a copy of the
Notice of Availability
of the EA to federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American tribes; potentially affected landowners and other interested individuals and groups; and newspapers and libraries in the Project area. The EA is only available in electronic format. It may be viewed and downloaded from the FERC's website (
www.ferc.gov), on the natural gas environmental documents page (
https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents). In addition, the EA may be accessed by using the eLibrary link on the FERC's website. Click on the eLibrary link (
https://elibrary.ferc.gov/eLibrary/search), select “General Search” and enter the docket number in the “Docket Number” field, excluding the last three digits (
i.e.,
CP26-136). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov
or toll free at (866) 208-3676, or for TTY, contact (202) 502-8659.
The EA is not a decision document. It presents Commission staff's independent analysis of the environmental issues for the Commission to consider when addressing the merits of all issues in this proceeding. Under section 7(c) of the NGA, the Commission determines whether interstate natural gas transportation facilities are in the public convenience and necessity and, if so, grants a Certificate of Public Convenience and Necessity to construct and operate them. The Commission bases its decisions on both economic issues, including need, and environmental effects.
Your comments should focus on the EA's disclosure and discussion of potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental effects. The more specific your comments, the more useful they will be. For your convenience, there are three methods you can use to file your comments to the Commission. The Commission
( printed page 60371)
encourages electronic filing of comments and has staff available to assist you at (866) 208-3676 or
FercOnlineSupport@ferc.gov.
Please carefully follow these instructions so that your comments are properly recorded.
(1) You can file your comments electronically using the eComment feature on the Commission's website (
www.ferc.gov) under the link to FERC Online. This is an easy method for submitting brief, text-only comments on a Project;
(2) You can also file your comments electronically using the eFiling feature on the Commission's website (
www.ferc.gov) under the link to FERC Online. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on “
eRegister.”
You must select the type of filing you are making. If you are filing a comment on a particular Project, please select “Comment on a Filing”; or
(3) You can file a paper copy of your comments by mailing them to the Commission. Be sure to reference the Project docket number (CP26-136-000) in your letter. Submissions sent via the U.S. Postal Service must be addressed to: Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852.
Filing environmental comments will not give you intervenor status, but you do not need intervenor status to have your comments considered. Only intervenors have the right to seek rehearing or judicial review of the Commission's decision. At this point in this proceeding, the timeframe for filing timely intervention requests has expired. Any person seeking to become a party to the proceeding must file a motion to intervene out-of-time pursuant to Rule 214(b)(3) and (d) of the Commission's Rules of Practice and Procedures (18 CFR 385.214(b)(3) and (d)) and show good cause why the time limitation should be waived. Motions to intervene are more fully described at
https://www.ferc.gov/how-intervene.
For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, contact the Office of Public Participation at (202) 502-6595 or
OPP@ferc.gov.
Additional information about the Project is available from the FERC website (
www.ferc.gov) using the eLibrary link. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to
https://www.ferc.gov/ferc-online/overview
to register for eSubscription.
1.
For tracking purposes under the National Environmental Policy Act, the unique identification number for documents relating to this environmental review is EAXX-019-20-000-1775471548.
2.
National Environmental Policy Act of 1969, as amended (Public Law [Pub. L.] 91-190. 42 U.S.C. 4321-4347, as amended by Pub. L. 94-52, July 3, 1975; Pub. L. 94-83, August 9, 1975; Pub. L. 97-258, 4(b), September 13, 1982; Pub. L. 118-5, June 3, 2023; Pub. L. 119-21, July 4, 2025).
4.
Separate from the proposed Texas Access Project, KMLP plans to file a proposal to construct a new natural gas manifold system in Jefferson County, Texas on the west side of the Golden Pass LNG terminal: the Texas Header. The Texas Header will be located adjacent to the Golden Pass LNG terminal and will function as a manifold, aggregating supplies from various interconnecting pipelines primarily for delivery to the Golden Pass LNG terminal.
5.
A “pig” is a tool that the pipeline company inserts into and pushes through the pipeline for cleaning the pipeline, conducting internal inspections, or other purposes.