[Federal Register Volume 91, Number 147 (Monday, August 3, 2026)]
[Proposed Rules]
[Pages 48823-48840]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2026-15724]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Railroad Administration
49 CFR Part 210
[Docket No. FRA-2025-0786, Notice No. 1]
RIN 2130-AC83
High-Speed Train Noise Emission Standards
AGENCY: Federal Railroad Administration (FRA), U.S. Department of
Transportation (DOT).
ACTION: Notice of proposed rulemaking (NPRM); request for comments.
-----------------------------------------------------------------------
[[Page 48824]]
SUMMARY: This NPRM seeks to amend the noise emission regulations to
address the unique noise emission characteristics of trains operating
at speeds exceeding 160 miles per hour (mph). Specifically, the
proposed regulation would provide an alternative standard for noise
emissions from train operations exceeding 160 mph, up to 220 mph, and
also provide a special approval process for noise emissions from train
operations exceeding 220 mph. This alternative noise emission standard
and compliance process would effectively remove an existing regulatory
barrier to the railroad industry for high-speed rail operations, while
continuing to protect public health and welfare. Existing noise
emission limits for all train operations at speeds up to 160 mph would
continue to apply, and these existing limits would remain available for
demonstrating compliance at higher speeds as well.
DATES: Comments on the proposed rule must be received by October 2,
2026. Comments received after that date will be considered to the
extent practicable.
ADDRESSES:
Comments: Comments related to Docket No. FRA-2025-0786 may be
submitted by going to http://www.regulations.gov and following the
online instructions for submitting comments.
Instructions: All submissions must include the agency name, docket
number (FRA-2025-0786), and Regulatory Identification Number (RIN) for
this rulemaking (2130-AC83). All comments received will be posted
without change to http://www.regulations.gov; this includes any
personal information. Please see the Privacy Act heading in the
SUPPLEMENTARY INFORMATION section of this document for Privacy Act
information related to any submitted comments or materials.
Docket: For access to the docket to read background documents or
comments received, go to http://www.regulations.gov and follow the
online instructions for accessing the docket.
FOR FURTHER INFORMATION CONTACT: Frederick Mottley, Systems Engineer,
Federal Railroad Administration, telephone: 617-494-3160, email:
[email protected]; or Samuel Gilbert, Senior Attorney, Federal
Railroad Administration, telephone: 202-578-5894, email:
[email protected].
SUPPLEMENTARY INFORMATION:
Abbreviations and Terms Used in This Document
CFR--Code of Federal Regulations
dB--decibels
dB(A)--A-weighted decibels
DOT--U.S. Department of Transportation
EPA--U.S. Environmental Protection Agency
EU--European Union
FRA--Federal Railroad Administration
ft--feet
HSR--high-speed rail
HVAC--heating, ventilation, and air conditioning
IEC--International Electrotechnical Commission
IIJA-- Infrastructure Investment and Jobs Act
IRFA--Initial Regulatory Flexibility Analysis
ISO-- International Organization for Standardization
km/h--kilometers per hour
Leq--equivalent sound level
m--meters
mph--miles per hour
NEPA--National Environmental Policy Act
NOI TSI--Noise Technical Specifications for Interoperability
NPRM--notice of proposed rulemaking
OMB--Office of Management and Budget
SBA--U.S. Small Business Administration
Table of Contents for Supplementary Information
I. Executive Summary
II. Legal Authority
III. Technical Background
IV. Section-by-Section Analysis
V. Regulatory Impact and Notices
A. Executive Order (E.O.) 12866 (Regulatory Planning and Review)
and DOT Regulatory Policies and Procedures
B. E.O. 14192 (Unleashing Prosperity Through Deregulation)
C. Regulatory Flexibility Act and E.O. 13272
D. Paperwork Reduction Act
E. Federalism Implications
F. International Trade Impact Assessment
G. Environmental Policy Act Compliance
H. Unfunded Mandates Reform Act of 1995
I. Energy Impact
J. Tribal Consultation
K. Privacy Act Statement
L. Rulemaking Summary, 5 U.S.C. 553(b)(4)
I. Executive Summary
In November 2018, FRA issued a final rule to establish equipment
safety standards for passenger high-speed rail (HSR) operations up to
220 mph,\1\ complementing a March 2013 final rule addressing track
safety standards for train operations at these same speeds.\2\ Because
certain levels of aerodynamic noise are impractical or impossible to
avoid for train operations that exceed 160 mph, existing rail noise
emission regulations would prevent full utilization of such operations
in the United States.\3\ Congress recognized the need to address high-
speed train noise emissions in the Infrastructure Investment and Jobs
Act (IIJA).\4\ Using the authority provided in section 22423 of IIJA,
this NPRM seeks to amend noise emission regulations at 49 CFR part 210
(part 210) to alleviate this regulatory obstacle for HSR operations.
---------------------------------------------------------------------------
\1\ 83 FR 59182 (Nov. 21, 2018).
\2\ 78 FR 16052 (Mar. 13, 2013). While this proposed rule would
also apply to freight train operations exceeding 160 mph, FRA notes
that fn. 1 to 49 CFR 213.307 specifies conditions for freight to be
transported at passenger train speeds and applies independently of
this proposed rule.
\3\ See High Speed Rail Noise Standards and Regulations, DOR/
FRA/ORD 21/03 (Feb. 2021), at 121. The report is available on FRA's
website at https://railroads.dot.gov/elibrary/high-speed-rail-noise-standards-and-regulations.
\4\ Sec. 22423, Public Law 117-58, 135 Stat. 429.
---------------------------------------------------------------------------
The proposed regulation would provide an alternative standard for
noise emissions from train operations exceeding 160 mph, up to 220 mph.
The alternative standard would be optional; a railroad could continue
to demonstrate high-speed train noise emission compliance in accordance
with the existing standards in 40 CFR part 201. The proposal would also
provide a special approval process for train operations exceeding 220
mph that demonstrate a level of protection consistent with these noise
emissions limits. This alternative noise emission standard and
compliance process would effectively remove an existing regulatory
barrier to the railroad industry for high-speed rail operations. The
proposed regulation would also continue to provide for noise emission
restrictions that protect public health and welfare and would be
consistent with international standards.
The cost of the proposed regulation results from railroads and rail
equipment manufacturers testing the high-speed trainsets for compliance
with the alternative noise emission limits under this NPRM. Performing
noise emission compliance testing will require sound level measuring
equipment, calibration of such equipment, and personnel to perform the
test and operate the train. In return, HSR operators would save costs
by potentially not needing to modify their rail equipment to reduce
aerodynamic noise to comply with the existing noise emission standard.
FRA assessed that the benefits in terms of cost-savings will
significantly exceed the costs. The estimated costs and benefits are
summarized in the table below.
[[Page 48825]]
Table ES-1--Costs and Benefits Summary Over a 30-Year Period of Analysis
[2024 Dollars]
----------------------------------------------------------------------------------------------------------------
Present value Present value
Impact 7% 3% Annualized 7% Annualized 3%
----------------------------------------------------------------------------------------------------------------
Costs........................................... $105,462 $178,230 $8,499 $9,093
Benefits........................................ 65,947,718 100,525,866 5,400,150 5,056,374
Net Benefits.................................... 65,842,257 100,347,636 5,391,651 5,047,281
----------------------------------------------------------------------------------------------------------------
II. Legal Authority
U.S. Environmental Protection Agency (EPA) regulations in 40 CFR
part 201 limit the noise emissions resulting from operation of the
equipment and facilities of surface carriers engaged in interstate
commerce by railroad. FRA regulations in 49 CFR part 210 provide for
the enforcement of the 40 CFR part 201 limits. EPA and FRA developed
this existing regulatory scheme pursuant to the Noise Control Act of
1972 (Noise Control Act),\5\ which found that inadequately controlled
noise presented a danger to public health and welfare and that Federal
action was essential.\6\ The Noise Control Act provides EPA with
regulatory authority and FRA, as delegated by the Secretary of
Transportation, with enforcement and inspection authority for noise
emissions covered by part 201 (in addition to FRA's general authority
under the railroad safety statutes).\7\
---------------------------------------------------------------------------
\5\ Public Law 92-574, 86 Stat. 1234; 42 U.S.C. 4901, et seq.
\6\ Id. at 4901(a).
\7\ See 41 FR 49183, 49184 (Nov. 8, 1976).
---------------------------------------------------------------------------
On November 15, 2021, IIJA was signed into law. Section 22423 of
IIJA amended section 17 of the Noise Control Act \8\ to permit DOT, in
consultation with EPA, to prescribe regulations governing railroad-
related noise emission standards for trains operating on the general
railroad system of transportation at speeds exceeding 160 mph,
including noise related to magnetic levitation systems and other new
technologies not traditionally associated with railroads.\9\ IIJA
suggests three factors that DOT may consider when prescribing new
regulations: (1) variances in maximum pass-by noise with respect to the
speed of the equipment; (2) current engineering best practices; and (3)
encouraging the use of noise mitigation techniques, where reasonable,
if the benefits exceed the costs.\10\
---------------------------------------------------------------------------
\8\ 42 U.S.C. 4916.
\9\ Id. at (c)(1).
\10\ Id. at (c)(2).
---------------------------------------------------------------------------
IIJA makes clear that EPA's existing railroad-related noise
standards prescribed under the Noise Control Act shall continue to
govern noise emissions from the operation of trains, including
locomotives and rail cars, at speeds not exceeding 160 mph.\11\ Indeed,
compliance with these existing standards may continue at speeds up to
and exceeding 160 mph. No railroad would be required to avail itself of
the alternatives proposed in this NPRM for noise emission compliance.
The rulemaking seeks only to make that flexibility available.
---------------------------------------------------------------------------
\11\ Id. at 4916(c)(3).
---------------------------------------------------------------------------
III. Technical Background
Currently, no trains operate in the United States at speeds above
160 mph, and the highest-speed trains now operate at a maximum of 150
mph. However, there are plans for HSR operations at speeds above 160
mph in several regions.\12\ The current railroad noise emission
standards established under part 201 are based on empirical data from
EPA studies of locomotives and railcars operating before 1976.\13\ At
the time, the maximum allowable train speed under FRA regulations was
110 mph. EPA observed that locomotive diesel engine noise was dominated
by engine exhaust and set noise emission limits at thresholds based
upon what was viewed as reasonable and achievable to muffle such noise,
specifically 90 dB(A) for locomotives manufactured after Dec. 31,
1979.\14\ EPA also studied railcar noise, finding that the upper range
for noise emissions from railcar movement at 60 mph was approximately
93 dB(A).\15\ This was set as the maximum for all operations.\16\ In
the decades since these standards were issued, FRA has examined more
modern railroad operations and noise impacts, including data on HSR
noise emissions.
---------------------------------------------------------------------------
\12\ Some potential HSR routes are the (1) Amtrak NextGen Acela
II service from Washington, DC to NY (the Northeast Corridor), see
https://amtraknewera.com/nextgen-acela-fleet; (2) Brightline West
service from Rancho Cucamonga, CA to Las Vegas, NV, see https://www.brightlinewest.com/; and (3) Cascadia service between Portland,
OR to Seattle, WA to Vancouver, BC, see https://wsdot.wa.gov/construction-planning/search-studies/cascadia-high-speed-rail. This
list is non-exhaustive and is intended as examples and not as an
endorsement of any project or any guarantee of future Federal
funding.
\13\ See 41 FR 2184 (Jan. 14, 1976).
\14\ 40 CFR 201.12(b).
\15\ See EPA, ``Background Document for Railroad Noise Emission
Standards'' (1975), available at https://nepis.epa.gov/Exe/ZyPURL.cgi?Dockey=9101KI1M.TXT.
\16\ 40 CFR 201.13.
---------------------------------------------------------------------------
For a conventional train with a maximum speed of up to
approximately 125 mph, propulsion and mechanical noise dominates the
total train noise emitted as the train passes by a wayside location
along a railroad.\17\ Indeed, for steel-wheeled trains, propulsion and
rolling noise combines with limited aerodynamic noise to describe the
total noise up to speeds of approximately 160 mph.\18\ However, at
speeds exceeding 160 mph, the aerodynamic noise resulting from airflow
moving over and around the train begins to become the dominant
contributor to the overall noise emitted.\19\
---------------------------------------------------------------------------
\17\ See High Speed Ground Transportation Noise and Vibration
Impact Assessment, at 2-8, FRA (2012). The report is available on
FRA's website at https://railroads.dot.gov/elibrary/high-speed-ground-transportation-noise-and-vibration-impact-assessment.
\18\ Id. at 2-11.
\19\ See id. The precise speed at which this occurs depends upon
the design of the trainset as well as the level of rolling noise
produced by wheel-rail interaction. See also Technical Report, 2.1.
---------------------------------------------------------------------------
HSR operations are common in numerous countries throughout the
world, including Japan, China, and European Union (EU) member
countries. FRA commissioned a global survey of railroad noise
standards, codes, regulations, and recommended practices, with a focus
on countries that have well-established HSR operations.\20\ FRA
additionally commissioned DOT's Volpe National Transportation Systems
Center to prepare a technical report (Technical Report) that researched
the needs and requirements for noise emission standards for high-speed
trains, considered international and industry standards, and outlined a
recommended approach for noise emission standards based on proven
methodologies.\21\ The proposed rule adopts this technical report's
recommended noise emission standards, and the report is included in the
rulemaking docket (http://
[[Page 48826]]
www.regulations.gov, Docket No. FRA-2025-0786).
---------------------------------------------------------------------------
\20\ See generally High Speed Rail Noise Standards and
Regulations.
\21\ Recommended Noise Standards for High-Speed Rail, DOT-VNTSC-
FRA-20-08, FRA (April 2020).
---------------------------------------------------------------------------
Of the countries with well-established HSR operations and that
regulate train noise, the EU group of countries uses an emission-based
approach for rolling stock in which noise thresholds are based on the
sound emitted at the source, distinguished by equipment and operating
speed. This approach to train noise is consistent with the existing
U.S. noise emission standards framework under the Noise Control Act. In
contrast, China and Japan use an immission- or receiver-based approach
to train noise in which noise thresholds are based on the location
where the sound is received.\22\ The immission-based approach is aimed
at reducing noise levels measured at the receiving location, rather
than limiting noise emitted at the source, and encourages the use of
mitigation measures such as noise barriers to achieve compliance.\23\
---------------------------------------------------------------------------
\22\ The term ``immission'' refers to the impact of pollutants
on humans and on the ecosystem. Every ``emission,'' or environmental
pollutant emitted by a source, causes an ``immission.''
\23\ Because noise is generated at the source and perceived by
the receiver, the path of the noise is a means to attenuate the
noise towards the perception of the receiver. See High Speed Rail
Noise Standards and Regulations at 15, Figure 4.
---------------------------------------------------------------------------
As noted above, under section 22423 of IIJA, regulations developed
for high-speed trains may encourage the use of noise mitigation
techniques to the extent reasonable if the benefits exceed the
costs.\24\ FRA interprets this authorization as allowing FRA to
consider HSR immission or receiver standards in the alternative to
emission standards not only in a rulemaking, but also in a special
approval process (see proposed part 210, subpart D) or other process
pursuant to a rulemaking. While an immission-based approach would allow
an HSR operation to choose noise mitigation measures that are locally
selected, the cost of planning for and implementing such measures will
likely exceed the cost of complying with the alternative noise emission
standard proposed in the NPRM.\25\ Nonetheless, FRA does not consider
an immission-based approach to be appropriate for general applicability
to high-speed train operations in the U.S., especially when an
international, emission-based standard exists in the form of the EU
regulation, as discussed below. An emission-based approach dovetails
with the continued applicability of existing U.S. noise emission
requirements and Congress's finding underlying those requirements that
Federal action is essential to deal with major noise sources in
commerce, the control of which requires national uniformity of
treatment.\26\
---------------------------------------------------------------------------
\24\ 42 U.S.C. 4916(c)(2)(C).
\25\ See High Speed Rail: Cost of Compliance for Noise
Mitigation Procedures, FRA, at 1-2 (2022). The report is available
on FRA's website at https://railroads.dot.gov/sites/fra.dot.gov/files/2022-01/HSR%20Noise%20Mitigation%20Procedures.pdf. The report
presents costs for several noise reduction methods. For methods
employed at the source, costs range from $50 million per track mile
to increase the track curve radii (i.e., reduce the amount of track
curvature) to $18,000 per train for pantograph fairings. For methods
along the noise path costs range from $50 million per track mile for
increasing the distance from the source to the receiver to $133,000
per track mile for adding resilient padding to the track. Finally,
for methods at the receiver, costs range from $1.8 million per track
mile for barriers at the receiver's property boundary to $500 per
dwelling for sealing gaps.
\26\ 42 U.S.C. 4901(a)(3).
---------------------------------------------------------------------------
There are several major benefits to adaptation of the EU
regulation, currently EU Regulation No. 1304/2014, the Noise Technical
Specifications for Interoperability (NOI TSI),\27\ as the U.S. basis
for alternative, high-speed train noise emission standards. In addition
to serving as an established noise emission standard, the NOI TSI
incorporates significant portions of International Organization for
Standardization (ISO) industry standard 3095:2013 (Acoustics--Railway
applications--Measurement of noise emitted by railbound vehicles)
reflecting international consensus for high-speed train noise
emissions. Similar to the 1975 EPA-established rule, and though
adjustments are necessary for normalization, EU noise emissions for
multiple-unit electric trains at speeds up to 250 kilometers per hour
(km/h) (155 mph) are capped at 95 dB(A).\28\
---------------------------------------------------------------------------
\27\ Available at https://eur-lex.europa.eu/legal-content/EN/TXT/PDF/?uri=CELEX:32014R1304.
\28\ As adapted and normalized for this rule from the NOI TSI,
this value is 96 dB(A). See Technical Report, 4.2.2.
---------------------------------------------------------------------------
However, circumstances preclude wholesale adoption of the NOI TSI
(though FRA invites comment on its adoption under proposed section
210.55). For instance, while the NOI TSI standards are inclusive of all
rolling stock, operating conditions, and speeds, IIJA authorizes
adoption of noise standards only for train operations above 160
mph.\29\ Another element of the NOI TSI that FRA proposes not to adopt
is the requirement to conduct testing on reference track as defined in
Section 6.2 of ISO 3095:2013. This requirement is designed to meet an
EU objective to be able to compare high-speed train noise across both
locations and operations in different member Nations, and to separate
noise contributions from the infrastructure versus noise contributions
from train equipment. Reference track is specified in terms of two
parameters: acoustic rail roughness level, related to micro-defects on
the surface of the track; and track vibration decay rate, an indicator
of the vibration damping and noise radiation of the track. The
parameter limits specified by the ISO Standard ensure that noise due to
these effects is minimized. However, measurement of these parameters
requires additional testing prior to each noise emission test, placing
additional burden on testing entities. In addition, FRA research has
indicated that these conditions may be difficult to meet, as there are
only three test tracks that meet these requirements in the EU, and
these tracks are limited in speed to 200 mph.\30\ Compliance testing
implementing the Noise Control Act ensures that measured noise emission
levels are representative of normal operating conditions accounting for
both typical track infrastructure and train contributions and does not
require reference track testing with minimized noise contribution for
comparability.
---------------------------------------------------------------------------
\29\ 42 U.S.C. 4916(c)(3).
\30\ See High Speed Rail Noise Standards and Regulations at 138.
---------------------------------------------------------------------------
A notable aspect of the NOI TSI proposed to be adopted is the
measurement distance specified: 25 feet (ft) (7.5 meters (m)) from the
centerline of the track. To measure noise source emission levels, this
relatively short distance is preferred to minimize variation due to
physical, environmental, and meteorological differences between
locations and repeated measurements. For comparison, existing U.S.
standards specify a greater distance: 100 ft (30 m) from the centerline
of the track. The measurement heights specified by the NOI TSI are 4 ft
(1.2 m) and 12 ft (3.5 m) above top of rail. The 4-ft height is
consistent with existing U.S. standards and is needed to capture noise
sources lower on the body of the vehicle (rolling noise and engine/
exhaust noise), which are prevalent in both lower- and higher-speed
operations. The 12-ft measurement height is required for high-speed
operations to measure noise sources accurately on the upper vehicle
body (e.g., pantograph), where direct line of sight to a 4-ft-high
microphone may be blocked or shielded by the train body. An
illustration of both the microphone heights and distances relative to
the train noise source is provided below.
[[Page 48827]]
[GRAPHIC] [TIFF OMITTED] TP03AU26.053
Sound dissipates (attenuates) with increasing distance as it
travels. As a result, the sound level measured at 100 ft would be seven
to nine dB lower in level than the sound measured at 25 ft. This
difference has been taken into account in normalizing U.S. standards
with those of the EU.\31\
---------------------------------------------------------------------------
\31\ See Technical Report, 4.4.1.
---------------------------------------------------------------------------
IV. Section-by-Section Analysis
Comments are sought on all proposals made in this NPRM.
Amendments to 49 CFR Part 210, Railroad Noise Emission Compliance
Regulations
Subpart A--General Provisions
Section 210.5 Definitions
FRA proposes to establish a definition for ``background noise.''
The proposed definition captures more generally the definition implicit
in 40 CFR 201.23. FRA further proposes additional definitions for
``maximum operating speed'' and ``pass-by time'' to describe key
measurements in the determination of equivalent sound level to
establish alternative compliance. FRA would also define ``mph'' for
clarity.
Subpart C--High-Speed Train Noise Emission Alternative Compliance
Section 210.41 Scope
This subpart would provide an alternative approach available to HSR
train manufacturers and railroads to establish noise emission
compliance for train operations exceeding 160 mph, up to 220 mph. As
authorized by section 22423 of IIJA, FRA is proposing to amend its
noise emission compliance regulations in 49 CFR part 210 to address
noise emissions standards for trains operating at speeds exceeding 160
mph. Consequently, in lieu of the requirements of 40 CFR part 201, FRA
is proposing that the total sound level emitted by operation of both
rail cars and locomotives at speeds exceeding 160 mph may comply with
the requirements in this rulemaking. However, no railroad would be
required to avail itself of the alternative processes for noise
emission compliance proposed in this rulemaking. The alternative
processes would be optional. A railroad may continue to demonstrate
high-speed train noise emission compliance in accordance with the
standards in 40 CFR part 201.
The alternative approach in new subpart C utilizes a compliance
testing process under specified test conditions. It includes a
requirement to notify FRA before conducting the testing and prepare a
detailed report of the test results that documents compliance.
Unlike compliance testing under existing subpart B, subpart C does
not contemplate FRA conducting random testing to ensure compliance at
train speeds exceeding 160 mph. Aerodynamic noise, dominant at high
speeds (as covered under subpart C), should be consistent between
trains of the same model series and independent of location.
Aerodynamic noise is dependent mainly on design features such as
pantograph shrouds or recesses, wheel covers, and train nose shape.\32\
Subpart B will continue to provide for random compliance testing at
``any time'' or ``at any appropriate location'' \33\ for train
operations at or below 160 mph, even when the alternative in subpart C
is selected, as nothing in this rulemaking affects compliance with
existing requirements for train operations at such speeds. Rolling
noise is also dominant at lower speeds and can vary from train to train
and location to location due to factors such as track roughness and
stiffness, as well as wheel roughness.
---------------------------------------------------------------------------
\32\ F. Poisson, Railway Noise Generated by High-Speed Trains,
in 126 Notes on Numerical Fluid Mechanics and Multidisciplinary
Design, at 457-80 (Springer, Berlin, Heidelberg, 2015), available in
the rulemaking docket (http://www.regulations.gov, Docket No. FRA-
2025-0786).
\33\ See 49 CFR 210.23.
---------------------------------------------------------------------------
Section 210.43 Alternative Compliance Standard
As adapted and normalized from the NOI TSI, the proposed
alternative compliance standard establishes a baseline equivalent sound
level of 96 dB(A) for the duration of the train pass-by for a speed of
160 mph. Below this speed, mechanical noise emissions will generally
predominate over aerodynamic noise emissions; above 160 mph,
aerodynamic noise begins to become the dominant contributor to noise.
The equivalent sound level of 96 dB(A), though numerically higher than
the prescribed maximum sound level standard in part 201 of 90 dB(A) for
locomotives and 93 dB(A) for railcars, reflects measurement from 25 ft
rather than the part 201 measurement distance of 100 ft, and
differences in the pass-by metric. The baseline equivalent sound level
metric represents essentially the average sound level of the high-speed
train during its pass-by time at a speed of 160 mph, whereas the
current standard uses the maximum sound level during the locomotive or
railcar pass-by. To reiterate, sound attenuates with increasing
distance, so the measured sound level at 100 ft would be less; factors
such as the trainset type, train speed, and terrain all affect the
sound level. As noted above, this closer measurement distance and the
equivalent sound level noise descriptor are adapted from the NOI TSI,
which provides for measurement from a 7.5 m (25 ft) distance from the
centerline of the track.
There is the possibility for a high-speed train to expose some
locations to noise above the current allowable maximum sound level as
speeds exceed 160 mph; however, such exposure is limited by the shorter
duration of the high-speed pass-by. A short-duration, high-speed train
pass-by nominally exceeding the current maximum sound level standard
can be expected to result in lower total noise exposure than a longer
duration, conventional-speed train pass-by at the current noise
emission standard. This is because prevailing train operating speeds
are significantly slower than 160 mph, at times averaging one-half or
less of this speed even for passenger trains, resulting in the
potential for substantially longer periods of noise exposure at
conventional speeds than that of proposed, high-speed
[[Page 48828]]
operations.\34\ Further, this proposed rule does not relieve carriers
of the requirement to comply with the current noise emission standards
during operations taking place at speeds up to 160 mph.
---------------------------------------------------------------------------
\34\ On a per train basis, FRA expects the NPRM alternative
noise standards to result in noise exposure similar to that under
the existing noise standards in 40 CFR part 201 due to a combination
of factors: (a) the shorter HSR by-pass period, (b) the fact that
HSR operations will likely incorporate larger distance buffers
between communities and rail lines, (c) the use of site-specific
noise mitigations as necessary, and (d) the lack of warning sounds
otherwise emitted for highway-rail grade crossings (i.e., the train
horn), which will not be present in HSR operations that lack grade
crossings.
---------------------------------------------------------------------------
For trains operating at a maximum speed exceeding 160 mph, the
measured noise emission is normalized to the 160-mph baseline speed,
through a formula, before comparison to the 96 dB(A) limit. This
formula is based upon the process set forth in the NOI TSI, and its
incorporated provisions of ISO 3095:2013. Under the proposed
alternative standard, the allowable noise emission limit increases with
increasing speed. At the maximum operating speed under the proposed
standard (220 mph), the limit would be approximately 103 dB(A). FRA is
not proposing to extend use of the adjustment formula beyond 220 mph to
an unlimited speed, and the NOI TSI's speed-adjustment formula is
similarly upper-bounded. Instead, FRA is proposing to provide for
alternative compliance through a special approval process in subpart D.
Under the existing EPA standard, a short-duration exceedance of the
90 dB(A) maximum sound level standard during emissions testing will
result in a test failure, notwithstanding the amount of total noise
energy emitted and related noise exposure of the pass-by. As a result,
some high-speed operations may result in lower overall noise exposure
than operations at slower operating speeds, even though they would not
be permitted under current requirements. In effect, the proposed
alternative standard would permit high-speed operations at a sound
exposure level similar to the current standard at train speeds up to
160 mph when measured over the entire length of the pass-by.
The NOI TSI generally requires additional pass-by testing at
multiple lower speeds, in addition to testing at the maximum operating
speed. FRA considered requiring a test for both at 160 mph and testing
at the maximum operating speed. However, FRA determined the 160-mph
test to be unnecessarily duplicative because operations at speeds of
160 mph or less will continue to require verification procedures in
compliance with the existing EPA standard. The NOI TSI is designed as a
comprehensive test for noise emissions, including noise emissions at
operating speeds of 160 mph or less for individual locomotives and
cars, stationary noise, and startup noise. By contrast, the
authorization granted in IIJA sets the focus on the noise emissions of
train operations at speeds exceeding 160 mph. FRA seeks comment on the
proposal to limit compliance testing under this alternative standard
for operations above 160 mph only to the proposed maximum speed of the
operation, rather than also to require baseline testing under this
alternative standard at 160 mph.
Section 210.45 Measurement Site Conditions
Current U.S. standards for measurement of noise emissions specify a
measurement distance of 100 ft from the centerline of the track, and a
height of 4 ft from the ground.\35\ In contrast, NOI TSI Section 4.2.3
(proposed to be adopted here) specifies a measurement distance of 7.5 m
(25 ft) at two heights: 1.2 m (4 ft) and 3.5 m (12 ft) from the top of
the rail. Sound levels attenuate with distance, even in the absence of
sources of sound absorption. A measurement taken from 25 ft would
generally measure a source at seven to nine dB higher than a
measurement of the same source from 100 ft.\36\ In addition, as
explained above, in most cases the shorter distance of 25 ft provides
less opportunity for the sound level measurement to vary because of
terrain, weather, and other factors at the test site that can cause
sound reflection, absorption, or diffusion.
---------------------------------------------------------------------------
\35\ 40 CFR 201.24.
\36\ See Technical Report, 4.4.1.
---------------------------------------------------------------------------
Usage of the top of the rail provides a common reference point to
measure noise sources on the body of the vehicle. The 4-ft measurement
height is generally consistent with the current standard for capturing
noise on the lower segment of the vehicle body, which is the common
source of mechanical noise. The 12-ft measurement height is required
for accurate measurement of noise sources on the upper vehicle body,
such as a pantograph, by providing a line of sight to those sources.
The lower, 4-ft measurement cannot be expected to make an accurate
measurement of this aerodynamic noise because the train body may
partially block the noise being emitted. Other requirements, including
the requirements for flat terrain within a triangular area from the
microphone to the test site and the requirement for a 75-ft radius free
of large, sound-reflecting objects, are based upon the NOI TSI.
Section 210.47 Measurement Criteria and Procedures
This section establishes the measurement criteria, instrumentation
requirements, calibration requirements, interference-minimizing
equipment requirements, measurement durations, minimum background noise
thresholds, and averaging criteria for demonstrating alternative
compliance.
Paragraph (a) references the sound level meter response specified
in 40 CFR 201.21.
The instrumentation requirements of paragraph (b) are based upon
the specifications of ISO 3095:2013, Sections 4.1 and 4.2. These are,
in turn, specified in International Electrotechnical Commission (IEC)
61672-1:2002, with the requirement that a sound calibrator meeting the
requirements of IEC 60942:2003 be used for calibration before and after
each series of measurements. FRA has elected not to incorporate these
standards by reference, but instead to reference these standards as a
current example of an acceptable industry standard. FRA does not intend
to take a position at this time on the sufficiency of any current,
future, or competing industry standard for sound level meter or sound
calibrator instruments, noting that these example standards have been
``current'' for two decades. FRA seeks comment on this flexible
approach to maintaining accuracy in measurement equipment.
The current regulation prescribes the use of mounting and a
windscreen according to the microphone manufacturer's recommendations.
ISO 3095:2013 provides that a tripod and windscreen must be used during
measurement. This suggests that such requirements have become industry
standard and should no longer be left to the recommendation of the
manufacturer. In addition, sound measurements taken at maximum
operating speed can be expected to be associated with significantly
higher aerodynamic activity, making the use of an effective mounting
and windscreen necessary for a measurement with minimal interference.
Paragraph (c) establishes the pass-by time as the relevant time
period for calculation of Leq. Note that Leq is
an abbreviation for equivalent sound level and, as defined in 40 CFR
201.1(k), is ``the level, in decibels, of the mean-square A-weighted
sound pressure during a stated time period, with reference to the
square of the standard
[[Page 48829]]
reference sound pressure of 20 micropascals.'' \37\
---------------------------------------------------------------------------
\37\ See also 49 CFR 210.5(b) (incorporating definitions in 40
CFR 201.1 for purposes of part 210).
---------------------------------------------------------------------------
Paragraph (d) provides that care shall be taken to ensure that the
noise from other sources does not influence the measurements
significantly.
Consistent with current regulations, this section provides that
background noise immediately before and after the pass-by test shall be
measured. Under paragraph (e), to ensure comparability with the
Leq measurement for the test, the sound level measurement
shall also be calculated based upon a set time period, which is based
upon ISO 3095:2013, Section 6.13. Under these procedures, the sound
level meter would generally record for a continuous period between
approximately 45 seconds to one minute. Following the test, the
measurement duration would be designated based upon the times at which
the 10 dB threshold is met before and after train pass-by. A remaining
period of at least 20 seconds before and 20 seconds after the
measurement duration would constitute the background noise measurement
period and would need to remain below the 10 dB threshold throughout
the period for the test to be valid.
Paragraph (f) provides for averaging three measurements under each
test condition and describes other criteria for determining compliance.
Section 210.49 Operation Standards
This section establishes the operating standards for testing in
compliance with this subpart. Compliance shall be demonstrated under
pass-by testing at the maximum operating speed for the train. This
section allows for variability in the test speed at 5 mph.
The calibration tolerance for any speed measurement device is also set
at 5 mph of the stated measurement. This permits a
hypothetical, though unlikely, allowance for actual test speeds to be
up to 10 mph above or below the required test speed. Some tolerance for
variance must be allowed to account for de minimis errors and a small
degree of acceptable variability both within the testing environment
and among test devices.
FRA proposes a consistent, 5-mph variability allowance primarily
for ease of use. ISO 3095:2013, Section 6.6.2 provides for requirements
that are less stringent: a 5 percent variability in speed,
with a maximum permissible measurement error of three percent. At
speeds from 160 to 220 mph, the individual allowance for measurement
error ranges from slightly smaller to more than 25 percent larger than
the proposed 5-mph allowance, while the five percent variability in
speed provides for a consistently larger variance from eight to 11 mph.
FRA seeks comment on the selection of standards for test speed
variability and speed measurement calibration tolerance.
The requirements for minimum tractive effort and operation of
passenger heating, ventilation, and air conditioning (HVAC) systems
align the test more closely with normal operating conditions. Each
requirement is adapted from ISO 3095:2013, Section 6.3. Minimum
tractive effort at a given speed will generally reflect the least
amount of energy applied to the mechanical components, which is
consistent with safe and efficient operation. Though this is expected
to produce a lower sound level than operation at a higher tractive
effort, it is generally the state in which a high-speed pass-by will
operate. HVAC systems contribute to an overall higher sound level and
should be included during any test to reflect normal operations.
ISO 3095:2013, Section 6.3 additionally includes wheel tread
conditioning standards, to the effect that the wheels used on the test
train should have been run at least 1,000 km (~600 miles). The
Technical Report found that this standard was likely included for the
portion of the testing protocol at lower speeds (80 km/h) as a means of
defining normal operating conditions.\38\ Based on this determination,
FRA has not included a proposal for wheel tread conditioning standards.
It is expected that most tests will likely include wheel sets that have
met such criteria. FRA invites comment on the inclusion of such a
requirement.
---------------------------------------------------------------------------
\38\ See Technical Report, 4.5.1.
---------------------------------------------------------------------------
Section 210.51 Track Conditions
This section specifies the conditions for track necessary to
conduct a noise emission test in accordance with normal operating
conditions. Paragraph (a) is derived from the current standards in 40
CFR 201.24, which provide for taking noise measurements on ``reasonably
well-maintained tracks.'' Though the standards do not specify greater
detail with respect to track maintenance, in its 1975 Background
Document for Railroad Noise Emission Standards, EPA noted that FRA's
standards for track safety allowed for either repair of the track or
reduced speeds in certain circumstances to address track
conditions.\39\ EPA further noted that noise level from the impact
between the train wheels and rail increases arithmetically with
velocity.\40\
---------------------------------------------------------------------------
\39\ See ``Background Document for Railroad Noise Emission
Standards,'' EPA, 509, 513-15 (1975).
\40\ See id. at 62, 512-13.
---------------------------------------------------------------------------
As poorly maintained track contributes to an increase in the noise
level of wheel/rail interactions, and higher velocity tends to
exacerbate the noise resulting from such interactions, FRA expects that
the proposed noise emission standard will serve as the primary factor
for concluding appropriate quality of track maintenance under this
section. Track that is maintained in accordance with the applicable FRA
Track Safety Standards (49 CFR part 213) should meet this requirement.
A limitation on track curvature is provided for in 40 CFR 201.23,
with limits to tie-and-ballast track. Paragraph (b) would maintain
limits on these elements, based on the standards set forth in ISO
3095:2013 applicable to HSR operations. ISO 3095:2013 also sets forth a
standard for track gradient. FRA notes that a consistent track gradient
allows the train to more effectively maintain the tractive effort that
is most consistent with normal operations. An incline grade would
generally result in excessive tractive effort and increased sound
level, while a decline grade would result in less effort and a
decreased sound level. Similarly, as an excessively narrow radius of
curvature reflects an uncommonly curved segment of track in HSR
operations, a limitation on the degree of curvature is necessary to
maintain testing under normal operating conditions. FRA has accordingly
proposed to adopt the international standard.
FRA recognizes that some HSR operations may adopt a track
superstructure other than the standard track with ballast bed. For
example, the track superstructure may be specially engineered for the
tonnage, speed, and other characteristics of the HSR operation, and be
integral to the operational, safety, and noise emission performance of
the HSR system. In recognition of this, FRA proposes to permit carriers
to substitute a different track superstructure, such as slab track, to
demonstrate compliance with the proposed standard. In order to
facilitate noise mitigation, the alternative superstructure may include
rail or track shielding (e.g., low barriers). However, the different
track superstructure and any rail or track shielding must be
consistently applied throughout the entire HSR system.
[[Page 48830]]
Section 210.53 Test Notification and Compliance Reporting
This section specifies the process for notifying FRA of equipment
testing for compliance with this subpart and information to be
collected and stored for inspection by FRA. Part 210 authorizes FRA
inspectors to examine or inspect railroad equipment for compliance with
the noise emission standards, or to request in writing that a railroad
carrier do so.\41\ The proposed pass-by testing standards, while
affording greater flexibility to HSR operations, may tend to increase
the time, cost, and complexity of such testing. To aid in the
inspection process while reducing the need for such cumulative testing,
FRA proposes to require that carriers maintain a detailed record of
testing for distribution to FRA inspectors upon request.
---------------------------------------------------------------------------
\41\ See 49 CFR 210.23.
---------------------------------------------------------------------------
In addition, this section would require that FRA be notified 30
days before conducting the testing, to permit the agency to witness the
testing. This notification requirement is consistent with existing FRA
requirements to provide the agency sufficient time to arrange for
observing the conduct of compliance testing in person, such as for
passenger rail equipment that has not previously been used in the
United States.\42\ Notification may be submitted electronically. FRA
seeks comment on these proposed requirements.
---------------------------------------------------------------------------
\42\ See 49 CFR 238.111(b)(2).
---------------------------------------------------------------------------
Section 210.55 Previously Tested Operations
This section provides that results from a previously tested
operation may be used to demonstrate compliance for a proposed
operation at any operating speed between 160 mph and the maximum
operating speed for which the previously tested operation demonstrated
compliance, up to 220 mph. This section also describes the conditions
required for use of the results. FRA invites comment on the specifics
of this proposal.
In addition, FRA invites comment on whether the rule should more
expressly allow reliance on use of alternate, EU operational testing
standards and results. Specifically, FRA invites comment on whether
testing that meets the requirements of EU Regulation No. 1304/2014, NOI
TSI, may be used for purposes of demonstrating compliance with this
subpart, either for a proposed operation or as the record of a
previously tested operation, and, if so, whether equipment used in such
testing must be listed in the European Register of Authorized Types of
Vehicles,\43\ or a comparable list of approved equipment maintained by
the European Union Agency for Railways or its successor agency.
---------------------------------------------------------------------------
\43\ Available at https://www.era.europa.eu/domains/registers/eratv_en.
---------------------------------------------------------------------------
Subpart D--Special Approvals
Section 210.61 Scope of Subpart
This section provides a special approval process for train
operations exceeding 220 mph to demonstrate a level of noise emission
protection consistent with the requirements of subpart C of this part.
The process would include publication of the petition for special
approval in the Federal Register and an opportunity for comment. The
special approval process would likely benefit unique high-speed train
operations, such as magnetic levitation train systems or systems wholly
operating in an enclosed right-of-way, for which noise emission limits
of particular, rather than general, application may be necessary or
appropriate, or both. In this regard, the special approval process
would be able to consider use of noise mitigation techniques, to the
extent reasonable if the benefits exceed the costs, to provide
protection against train noise emission, as provided under 42 U.S.C.
4916(c)(2)(C). FRA would encourage HSR operators and manufacturers to
approach FRA should they have any questions or concerns about
demonstrating compliance with the requirements for special approval
under this subpart. FRA invites comment on this proposed subpart D.
Section 210.63 Petition for Special Approval
This section describes the special approval process. This section
would require a petition to include a detailed description of the
proposed noise emission standard, including any alternative testing
methodologies or procedures, as well as measurement criteria. This
section would also require a petition to include a description of the
operating environment and its features, as relevant to the petition.
The petition must also include, to the extent practical, all testing
and analysis information required by section 210.53 showing that the
proposed standard provides a level of protection consistent with the
noise emission limits under subpart C of this part. FRA would accept
alternate analysis that explains the lack of information required by
section 210.53, such as identification of variances with the proposed
testing conditions under subpart C. Consistent with special approval
petition processes in other FRA regulations, FRA would publish notice
of the petition in the Federal Register summarizing the information
provided in the petition.
Note that, unlike the emission standard proposed in subpart C, a
testing method utilizing an immission- or receiver-based approach,
including the use of cost-effective noise mitigation techniques, could
be proposed as part of a special approval petition under subpart D. FRA
would consider whether such a petition demonstrated that the
alternative approach provides a level of noise emission protection
consistent with the requirements of subpart C.
Section 210.65 Disposition
This section describes the process for determining whether to grant
a petition for special approval and related procedures. FRA invites
comments on whether an expected timeline for a decision on a petition
should be specified in the rule.
V. Regulatory Impact and Notices
A. Executive Order 12866 (Regulatory Planning and Review) and DOT
Regulatory Policies and Procedures
E.O. 12866, Regulatory Planning and Review,\44\ as implemented by
DOT Order 2100.6B, Policies and Procedures for Rulemaking,\45\ requires
agencies to regulate in the ``most cost-effective manner,'' to make a
``reasoned determination that the benefits of the intended regulation
justify its costs,'' and to develop regulations that ``impose the least
burden on society.'' DOT Order 2100.6B specifies that regulations
generally should ``not be issued unless their benefits are expected to
exceed their costs.'' In arriving at those conclusions, E.O. 12866
requires that agencies should consider ``both quantifiable measures . .
. and qualitative measures of costs and benefits that are difficult to
quantify'' and ``maximize net benefits . . . unless a statute requires
another regulatory approach.'' E.O. 12866 also requires that ``agencies
should assess all costs and benefits of available regulatory
alternatives, including the alternative of not regulating.'' DOT Order
2100.6B directs FRA and other Operating Administrations generally to
choose the ``least costly regulatory alternative that achieves the
relevant objectives'' unless
[[Page 48831]]
required by law or compelling safety need.
---------------------------------------------------------------------------
\44\ 58 FR 51735 (Oct. 4, 1993).
\45\ DOT-2100.6B--Policies and Procedures for Rulemakings,
available at https://www.transportation.gov/regulations/dot-order-21006b-rulemaking-and-guidance-procedures.
---------------------------------------------------------------------------
E.O. 12866 and DOT Order 2100.6B also require that FRA submit
``significant regulatory actions'' to the Office of Information and
Regulatory Affairs (OIRA) within the Executive Office of the
President's Office of Management and Budget (OMB) for review. This rule
is a significant regulatory action pursuant to E.O. 12866; however, it
has not been designated as a ``major rule'' as defined by the
Congressional Review Act (5 U.S.C. 801, et seq.).
FRA analyzed the potential costs and benefits of this proposed
rule. In this analysis, FRA expects the most likely scenario for HSR
operations will be HSR trainset service operating on shared track in
urban environments at conventional speeds (up to about 125 mph), and on
dedicated track outside of urban areas at high speeds (i.e., over 160
mph). This scenario is consistent with the earlier FRA rulemakings on
safety standards for track \46\ and passenger equipment \47\ at
operating speeds up to 220 mph. When operating at conventional speeds,
HSR trainsets will continue to fall under the existing noise emission
standards in 40 CFR part 201. FRA assessed that this proposed rule
would result in cost savings for the industry over a 30-year period,
while protecting public health and safety. The proposed rulemaking
would alleviate a regulatory obstacle to high-speed train operations,
making these operations more implementable, while promoting greater
harmonization with global markets for high-speed train technology and
equipment. Also see the assessment under section F, International Trade
Impact Assessment, below.
---------------------------------------------------------------------------
\46\ 78 FR 16052 (Mar. 13, 2013).
\47\ 83 FR 59182 (Nov. 21, 2018).
---------------------------------------------------------------------------
Costs
FRA estimated the marginal costs and benefits likely to occur over
the first 30 years of this proposed rule. Without this NPRM, both
conventional-speed and high-speed trains would fall under the existing
noise standards in 40 CFR part 201 and incur costs for noise emission
testing. Under this NPRM, high-speed trains could instead be tested
using an alternative standard. While the sound level measurement
equipment and test procedures are generally similar for conducting
noise emission testing either under the existing noise standard or
under the NPRM, some additional equipment (i.e., another sound level
meter) and labor time may be needed for testing high-speed trainsets
under the NPRM. For example, it may take additional time to arrange
testing of the high-speed trainset, find a suitable test site for high-
speed trains, and set up another sound level meter to conduct a test at
a 12-ft height (whereas the existing regulation requires a test at only
a 4-ft height). In addition, under the NPRM, the economic analysis
accounted for purchase of an additional sound level meter, reasoning
that a risk-averse entity would not want to delay noise emission
testing because of a faulty sound level meter when the high-speed train
and testing personnel are gathered and ready at the test site. Because
these changes are incremental for noise emission testing under the
NPRM, the cost estimates are small in scale. The estimated annualized
costs are about $8,500 using a seven percent discount rate. In present
value terms, the estimated costs are $105,462 (in 2024 dollars,
discounted at seven percent). In terms of public health and safety, FRA
expects no increase in noise impacts because of the shorter duration of
a high-speed trainset pass-by of a wayside location at 160 mph.
This analysis estimated a range of four to six HSR operations, or
an average of five HSR operations would be affected by this rulemaking
over a 30-year period. For railroads that follow the proposed rule,
noise testing would be required initially and when there are material
differences in train equipment that would affect the level of emitted
noise (approximately every 15 years).
Benefits
At the present time there are no high-speed rail operations between
160 mph and 220 mph in the U.S. which could have yielded data to
estimate benefits. In an attempt to quantify benefits, FRA used as a
proxy the final rule on Passenger Equipment Safety Standards; Standards
for Alternative Compliance and High-Speed Trainsets \48\ (Tier III
rule). Similar to that rulemaking, FRA reasoned high-speed rail
equipment in international operation would require modification to
comply with the existing baseline noise emission standards--a cost that
could then be saved by complying with the alternative standard in the
NPRM. FRA ``borrowed'' these benefits from the Tier III rule as a
general estimation method and not a specific benefit estimate of a
specific project or projects. FRA estimated annualized benefits (in
terms of avoided costs) at about $5 million using a seven percent
discount rate, or about $66 million in present value terms (in 2024
dollars, discounted at seven percent).
---------------------------------------------------------------------------
\48\ Id.
---------------------------------------------------------------------------
With low costs, the estimated net benefits are about the same at
about $5 million in annualized terms or $66 million in present value
terms, both using a seven percent discount rate. The costs and benefits
are presented in the table below.
Table V-1--Costs and Benefits Over a 30-Year Period of Analysis
[2024 Dollars]
----------------------------------------------------------------------------------------------------------------
Cost impact Present value 7% Present value 3% Annualized 7% Annualized 3%
----------------------------------------------------------------------------------------------------------------
Equipment (under section $62,091............ $98,195........... $5,004............ $5,010
210.47, Measurements and
Criteria & Procedures).
Factory Calibration (under 5,916.............. 9,356............. 476............... 477
section 210.47).
Labor (under section 210.43, 16,745............. 26,482............ 1,350............. 1,351
Alternative Compliance Std.,
section 210.47, section
210.53, Test Notification and
Compliance Reporting).
Petition for Special Approval 20,709............. 44,196............ 1,669............. 2,255
(under section 210.63).
----------------------------------------------------------------------------------------------------------------
Qualitative Cost, Public Health and Safety: No expected increase in noise impacts because of the shorter
duration of a high-speed trainset's pass-by at 160 mph. Also, no contributing impacts associated with warning
sounds otherwise emitted for highway-rail grade crossings (not present in HSR operations)..
----------------------------------------------------------------------------------------------------------------
Total NPRM Costs............... 105,462............ 178,230........... 8,499............. 9,093
Total NPRM Benefits............ 65,947,718......... 100,525,866....... 5,400,150......... 5,056,374
Disposition of Special de minimis......... de minimis........ de minimis........ de minimis
Approval, Government Cost
(under section 210.65).
[[Page 48832]]
Net Benefits................... 65,842,257......... 100,347,636....... 5,391,651......... 5,047,281
----------------------------------------------------------------------------------------------------------------
* Proxy benefit adapted from November 2018 Tier III rule.
Note: Figures may not sum due to rounding.
Alternatives
One of the alternatives to a regulatory action is not to regulate
at all. As mentioned above, E.O. 12866 directs agencies to consider the
costs and benefits of a scenario without the regulation, which in this
case would consist of a scenario without the proposed alternative noise
emission standards for HSR operations.\49\ Given the existing 1970s-era
noise emission standard did not account for the noise emission
characteristics of HSR, and there are several potential HSR routes
planned, FRA reasons HSR operations would still need an updated noise
standard to enable most trainsets to operate at high speed.\50\ Absent
this proposed regulation, railroads may operate their trainsets at
conventional speeds only (below 160 mph) to comply feasibly with the
existing noise standard.
---------------------------------------------------------------------------
\49\ This analysis does not consider a scenario without the
Noise Control Act, which would require Congressional action to
repeal.
\50\ High Speed Ground Transportation Noise and Vibration Impact
Assessment, FRA (2012), see especially Appendix D.
---------------------------------------------------------------------------
When developing this NPRM, FRA considered two broad approaches to
regulating HSR noise emissions: an immission-based approach and an
emission-based approach. As described above in the Technical Background
section, an immission-based approach is sensitive to noise mitigation
where the noise is received, whereas the emission-based approach is
sensitive to noise mitigation at the source.
In terms of benefits and costs, the immissions approach offers the
possibility of tailoring an HSR trainset and related infrastructure to
its local environment, which potentially could offer greater utility.
That is, the HSR operation would be site-specific and, in theory,
better able to match the needs of the local population in terms of
mitigating noise.\51\ The immissions approach would likely encourage
noise mitigation measures such as sound barriers, acoustic windows, and
larger buffer zones between the trainset and impacted areas. Local land
use planning would decide the appropriate mix of mitigations. As the
mitigations would vary by site, it is difficult to estimate a precise
overall cost for this approach, but FRA expects the mitigation (and
associated planning) could be costly and time-consuming. As noted
earlier, a study of several types of mitigations applied at the source,
along the pathway to the receiver, or at the receiver (of which the two
latter categories would represent an immission-based approach) found
costs greater than those estimated in this analysis for the emission-
based approach.\52\ These costs are per mile or per dwelling; costs
would rise depending on the length of the HSR route and affected
structures. To highlight one potential mitigation measure, FRA presents
the cost of noise barriers. The same study found the most effective
noise barriers are those located at the edge of the railroad right-of-
way, designed proportional to the length of the train, and constructed
at least 6.6 feet high (or 2 meters). The cost to construct such a
barrier is about $1.84 million per mile of track, or about $3.7 million
per mile for both sides of the track.\53\ Other mitigations may be
needed or desired by the local population.
---------------------------------------------------------------------------
\51\ Charles M. Tiebout, ``A Pure Theory of Local Expenditures''
(Oct. 1956), available at https://fbaum.unc.edu/teaching/PLSC541_Fall08/tiebout_1956.pdf. The concept of HSR operations
reflecting the preferences of the local population draws generally
on Tiebout's paper.
\52\ High Speed Rail: Cost of Compliance for Noise Mitigation
Procedures (2022). See especially Tables 53 to 55. The authors note
that the costs are not estimates of the true cost of applying noise
mitigation measures to existing or planned HSR operations, but
estimate costs for two potential operations at a macro level (p.
77).
\53\ Id. at 95, 111, and 147.
---------------------------------------------------------------------------
In contrast, the emission-based approach sets a uniform standard
for noise emissions. Under this approach, similar trainsets could be
used in different locations and still meet the standard. (Any potential
intercity corridor considering HSR operations would still assess its
noise impact and consider appropriate mitigations through other
processes before starting operations.) By using trainsets that all meet
the same noise standard, they may be similar in design and operation
(given technology at this point in time). The overall national costs
for maintenance, repair, and training could be reduced as there would
be fewer types of equipment to manage. There also may be economies of
scale if multiple HSR corridors order the same or similar equipment.
(Unique HSR operations could always file for approval under the
proposed Special Approval process.) From a policy perspective, the
emissions approach provides for an interoperable system, while the
immissions approach would likely not.
As an alternative to testing HSR trainsets in the U.S., FRA is
considering allowing compliance tests performed under EU regulations to
demonstrate compliance with the NPRM's alternative noise emission
standard. (See proposed section 210.55, Previously Tested Operations,
and corresponding discussion in the Section-by-Section Analysis.) Thus,
if a manufacturer is adapting a trainset from Europe for use in a U.S.
HSR operation, the manufacturer may already have similar compliance
test results from Europe to draw upon. If the final rule allows EU
compliance testing to be used to demonstrate U.S. compliance, that
would represent another, less strict alternative, and costs would
decrease. However, some of the cost savings would be offset by the
administrative cost to prepare data and analysis demonstrating that the
EU compliance test offers the same level of protection against noise as
the NPRM.
Conclusion
Overall, this is an enabling rule. Under the proposed rule,
stakeholders can avoid the costs of meeting the current noise
standards. The costs of meeting the current standards will be very
high, or even infeasible given the different nature of noise at high
speeds, where aerodynamic noise predominates over mechanical and
propulsion noises. Stakeholders may need to make significant changes to
the equipment under current noise standards.
B. Executive Order 14192 (Unleashing Prosperity Through Deregulation)
E.O. 14192, Unleashing Prosperity Through Deregulation, requires
that for ``each new [E.O. 14192 regulatory action] issued, at least ten
prior
[[Page 48833]]
regulations be identified for elimination.'' \54\ Implementation
guidance for E.O. 14192 issued by OMB (Memorandum M-25-20, Mar. 26,
2025) defines two different types of E.O. 14192 actions: an E.O. 14192
deregulatory action, and an E.O. 14192 regulatory action.\55\
---------------------------------------------------------------------------
\54\ Executive Office of the President. Executive Order 14192 of
January 31, 2025. Unleashing Prosperity Through Deregulation. 90 FR
9065-9067 (Feb. 6, 2025).
\55\ Executive Office of the President. Office of Management and
Budget. Guidance Implementing Section 3 of Executive Order 14192,
Titled ``Unleashing Prosperity Through Deregulation.'' Memorandum M-
25-20. Mar. 26, 2025.
---------------------------------------------------------------------------
An E.O. 14192 deregulatory action is defined as ``an action that
has been finalized and has total costs less than zero.'' This proposed
rulemaking is expected to have total costs less than zero, and
therefore it would be considered an E.O. 14192 deregulatory action upon
issuance of a final rule. FRA estimates the alternative standard for
noise emissions offered in the NPRM could result in about $5 million in
annualized cost savings at a seven percent discount rate over a 30-year
time period.
C. Regulatory Flexibility Act and Executive Order 13272
The Regulatory Flexibility Act of 1980 \56\ and E.O. 13272, Proper
Consideration of Small Entities in Agency Rulemaking,\57\ require
agency review of proposed and final rules to assess their impacts on
small entities. An agency must prepare an Initial Regulatory
Flexibility Analysis (IRFA) unless it determines and certifies that a
rule, if promulgated, would not have a significant economic impact on a
substantial number of small entities. FRA has not determined whether
this proposed rule would have a significant economic impact on a
substantial number of small entities and has therefore prepared this
IRFA. FRA seeks public comment from small entities on the economic
impacts of this proposed rule.
---------------------------------------------------------------------------
\56\ 5 U.S.C. 601, et seq.
\57\ 67 FR 53461 (Aug. 16, 2002).
---------------------------------------------------------------------------
1. Reasons for Considering Agency Action
FRA seeks to amend long-standing noise emission regulations to
address the needs of HSR train operators while protecting public health
and safety and promoting greater harmonization with international
practice. Currently, regulations in part 201 and part 210 effectively
limit train speeds to 160 mph and act as a regulatory obstacle to HSR
implementation. This NPRM proposes both an alternative noise emission
standard to help enable trains to operate at speeds exceeding 160 mph,
up to 220 mph, and also a special approval process for noise emissions
from train operations at speeds greater than 220 mph. FRA expects the
proposed regulatory framework to result in similar, total noise
exposure to people living along HSR rights-of-way as from the existing
noise emission requirements. Were this proposed approach not pursued,
the existing requirements would continue to act to prevent the benefits
of interoperable HSR service from being fully realized in the United
States.
2. A Succinct Statement of the Objectives of, and Legal Basis for, the
Proposed Rule
As authorized by section 22423 of IIJA, this proposed rule would
amend the noise emission regulations to address the unique noise
emission characteristics of trains operating at speeds exceeding 160
mph, up to 220 mph. A special approval process would be required for
HSR operations at speeds greater than 220 mph. The NPRM seeks to remove
a regulatory barrier to HSR operations and protect public health and
safety by limiting noise exposure to levels consistent with current law
while promoting greater harmonization with international practice.
3. A Description and, Where Feasible, an Estimate of the Number of
Small Entities to Which the Proposed Rule Would Apply
The Regulatory Flexibility Act of 1980 requires a review of
proposed and final rules to assess their impact on small entities,
unless the Secretary certifies that the rule would not have a
significant economic impact on a substantial number of small entities.
``Small entity'' is defined in 5 U.S.C. 601 as a small business concern
that is independently owned and operated and is not dominant in its
field of operation. The U.S. Small Business Administration (SBA) has
authority to regulate issues related to small businesses and stipulates
in its size standards that a ``small entity'' in the railroad industry
includes a for-profit ``line-haul railroad'' that has fewer than 1,500
employees and a ``short line railroad'' with fewer than 1,500
employees.\58\
---------------------------------------------------------------------------
\58\ ``Size Eligibility Provisions and Standards,'' 13 CFR part
121, subpart A. NAICS Codes 482111 and 482112 indicate ``Line Haul''
and ``Short Line'' railroads respectively. Per SBA, any firm under
NAICS Code 482112 that employs more than 1,500 employees cannot
qualify as a small business. See U.S. Small Business Size Standards
by NAICS Industry, available at https://www.ecfr.gov/current/title-13/chapter-I/part-121#121.201.
---------------------------------------------------------------------------
Federal agencies may adopt their own size standards for small
entities in consultation with SBA and in conjunction with public
comment. Under that authority, FRA has published a final statement of
agency policy that formally establishes ``small entities'' or ``small
businesses'' as railroads, contractors, and hazardous materials
shippers that meet the revenue requirements of a Class III railroad as
set forth in 49 CFR 1201.1-1, which is $40.4 million or less after
applying the revenue deflator to adjust annual revenues for inflation;
\59\ and commuter railroads or small governmental jurisdictions that
serve populations of 50,000 or less.\60\ FRA is using this definition
for the NPRM.
---------------------------------------------------------------------------
\59\ 49 CFR 1201.1-1 (10-1-2024 edition). Available at https://www.ecfr.gov/current/title-49/subtitle-B/chapter-X/subchapter-C/part-1201.
\60\ 68 FR 24891 (May 9, 2003) (codified at appendix C to 49 CFR
part 209).
---------------------------------------------------------------------------
Class III Railroads: HSR operators that can avail themselves of the
NPRM's alternative noise emission standard are likely to operate Tier
III \61\ passenger equipment on shared track when in urban areas with
high population densities, at speeds not exceeding 125 mph. All
trainsets operating on shared track are governed by the maximum
operating speed for that segment of track, which ranges from 15 mph to
125 mph for passenger trains on track Classes 1 through 7.\62\ Most
Class III railroads own and operate track supporting Class 3 speeds or
lower, and the maximum operating speed for passenger trains on Class 3
is 60 mph.\63\ Accordingly, even if a Class III railroad invested in
the highest class of track feasible to support shared operations, HSR
trainset operations over such track would still be subject to the
existing baseline noise emission requirements. Further, under FRA's
Tier III standards, HSR trainsets traveling at speeds exceeding 125 mph
up to 220 mph would be required to operate in an exclusive right-of-
way, most likely in rural areas with low population density. Given
Class III railroads do not own and operate track that could support HSR
trains operating between 160 mph to 220 mph, no HSR operations would
likely be conducted on Class III railroad tracks and Class III
railroads would not be impacted by this NPRM.
---------------------------------------------------------------------------
\61\ Tier III operations are passenger train operations ``in a
shared right-of-way at speeds not exceeding 125 mph and in an
exclusive right-of-way without grade crossings at speeds exceeding
125 mph but not exceeding 220 mph.'' See 49 CFR 238.5.
\62\ 49 CFR 213.9(a), 213.307(a).
\63\ 49 CFR 213.9(a).
---------------------------------------------------------------------------
Small Governmental Jurisdictions: Likewise, the NPRM's proposed
[[Page 48834]]
alternative noise emission standard should result in no more total
noise exposure to small governmental jurisdictions with a population of
50,000 or less, on a per train basis, than the existing noise emission
standard in 40 CFR part 201.
FRA reviewed potential HSR operations in regions throughout the
United States. These potential HSR operations are expected to comply
with the NPRM's alternative noise emission standard when providing HSR
service to connect large urban areas. Further, while the HSR operators
would go through rural areas and small governmental jurisdictions such
as cities or towns with a population of 50,000 or less (as well as
large urban areas), FRA expects that the overall noise exposure under
the proposed standard for operations at high speed would be similar to
that experienced under current requirements. In addition, operation
through small governmental jurisdictions would be considered in any
noise analysis (e.g., under NEPA) to evaluate a specific proposed
project's potential effects and apply mitigation as appropriate to
avoid negative impacts, when the proposed project is a major Federal
action taken by a Federal agency, such as providing financial
assistance.\64\ See discussion under Section V.G (National
Environmental Policy Act Compliance) below. Therefore, FRA assesses
these small governmental jurisdictions would not be negatively impacted
by the rule.
---------------------------------------------------------------------------
\64\ See 42 U.S.C. ch. 55.
---------------------------------------------------------------------------
Manufacturers: FRA has identified six HSR trainset manufacturers
\65\ that would be positively affected by the proposed rule from the
increased demand for specialized high-speed equipment.\66\ All six
firms employ more than the 1,500 employees required to exceed the SBA
size standards requirements and therefore are not considered small
entities. FRA has confirmed there are no small businesses manufacturing
HSR trainsets as the prime contractors. FRA expects the impact of the
proposed rule would be to benefit passenger railroad operators and HSR
trainset manufacturers by providing the opportunity to cost-effectively
advance interoperable HSR service.
---------------------------------------------------------------------------
\65\ At the present time, these are Alstom SA, Hitachi Rail,
Kawasaki Railcar Manufacturing Co., Siemens Mobility GmbH, Stadler
Rail AG, and Talgo SA.
\66\ North American Industry Classification System (NAICS) Code
336510 signifies the Railroad Rolling Stock Manufacturing firms that
would be affected by this proposed rule. Per SBA, any firm under
NAICS code 336510 that employs more than 1,500 employees cannot
qualify as a small business. U.S. SBA, Table of Small Business Size
Standards Matched to North American Industry Classification System
Codes (Jan. 2022). Available: https://www.sba.gov/document/support-table-size-standards.
---------------------------------------------------------------------------
Either the HSR trainset manufacturers or passenger HSR operators
would perform the noise emission test to comply with the alternative
noise emission standard under the NPRM. As mentioned, none of the HSR
trainset manufacturers are small entities. FRA is also not aware of any
small potential passenger HSR operators.
4. A Description of the Projected Reporting, Recordkeeping, and Other
Compliance Requirements of the Rule, Including an Estimate of the Class
of Small Entities That Will Be Subject to the Requirements and the Type
of Professional Skill Necessary for Preparation of the Report or Record
FRA expects all projected reporting, recordkeeping, and other costs
of compliance with this NPRM would fall solely on large entities: HSR
trainset manufacturers and HSR operators that provide the service.
These entities would bear the short-term costs required for
demonstrating compliance with the alternative noise emission standard
and the long-term costs associated with ensuring such compliance for
future HSR equipment design changes. These large entities would bear
the cost of certifying the HSR trainset meets the NPRM alternative
noise emission standard. See Table V-1 in Section V.A, above. The
procedure to measure the noise emitted from the HSR trainset requires
equipment to measure the sound level of emitted noise, personnel to
perform the measurements, and process the data, and employees to
operate the HSR trainset.
HSR trainset manufacturers and/or the railroads that operate the
HSR service would be required to perform the noise compliance tests.
Tests would be repeated whenever there are material differences in the
HSR equipment that would affect the level of emitted noise, such as
exterior design changes. FRA estimates such changes occur about every
15 years on average. FRA estimates that long-term costs of the proposed
rule would be approximately $8,000, annualized at seven percent
discount rate over a 30-year period of analysis, and that about $5
million in annualized benefits would accrue, using the same rate and
analysis period. The estimated benefits, in terms of costs savings, are
much greater than costs because using the alternative noise emission
standard could avoid costly modifications to HSR trainsets. See Table
V-1, above and in the regulatory analysis supporting this rulemaking,
for more information on the estimated costs and benefits.
Small entities that fall below the SBA size standards, including
Class III railroads, equipment manufacturers, and small governmental
jurisdictions with a population of 50,000 or less, would not bear any
short- or long-term costs.
5. Identification, to the Extent Practicable, of All Relevant Federal
Rules That May Duplicate, Overlap, or Conflict With the Proposed Rule
FRA is not aware of any relevant Federal rule that duplicates,
overlaps with, or conflicts with the proposed rule, other than the
existing noise emission standards, which would continue to apply. The
proposed rule provides an alternative, noise emissions framework for
HSR operations at speeds exceeding 160 mph.
6. A Description of Significant Alternatives to the Rule
FRA is proposing this rulemaking to relieve a regulatory obstacle
for HSR operations by amending current noise emission requirements to
help enable HSR trainsets to operate at speeds greater than 160 mph on
the U.S. general railroad system of transportation. The proposed
rulemaking would maintain public health and safety by continuing to
limit overall public noise exposure while facilitating HSR service.
In the absence of this proposed rule, passenger rail operators may
not be able to provide cost-effective, interoperable HSR service to
compete with other modes of transportation. HSR manufacturers would
have limited ability to deploy their technology in the United States.
If this proposed rule were not promulgated, the potential benefits of
HSR may not be fully realized in the United States.
D. Paperwork Reduction Act
The information collection requirements in this proposed rule are
being submitted to OMB for review and approval in accordance with the
Paperwork Reduction Act of 1995 (PRA).\67\ The sections that contain
the new information and current information collection requirements and
the estimated time to fulfill each requirement are as follows:
---------------------------------------------------------------------------
\67\ 44 U.S.C. 3501, et seq.
[[Page 48835]]
--------------------------------------------------------------------------------------------------------------------------------------------------------
Total annual Average time per Total annual Wage rate (D) Total cost
CFR section Respondent universe responses response burden hours \68\ equivalent
..................... (A).................. (B).................. (C) = A * B .............. (E) = C * D
--------------------------------------------------------------------------------------------------------------------------------------------------------
210.11 Waivers:
--------------------------------------------------------------------------------------------------------------------
--Petition to Administrator for FRA anticipates zero waivers over the three-year collection period.
waiver of compliance.
--------------------------------------------------------------------------------------------------------------------
210.27 New locomotive
certification:
--------------------------------------------------------------------------------------------------------------------
--(a) and (b) Request to 6 locomotive 5 requests........... 30 minutes........... 2.50 $90.19 $225.48
manufacturer for certification. manufacturers.
--------------------------------------------------------------------------------------------------------------------
210.31 Operation standards
(stationary locomotives at 30
meters):
--------------------------------------------------------------------------------------------------------------------
--(b) Recorded locomotive noise The estimated paperwork burden for this regulatory requirement is covered under OMB control number 2130-0004. In
emission test under the addition, FRA found the associated burdens related to train equipment inspection and testing were addressed when
``Remarks'' section on the FRA calculated the economic costs of the regulatory requirements arising from the rulemaking and, therefore, have
reverse side of Form F 6180.49. not been included as burdens under the PRA.
--------------------------------------------------------------------------------------------------------------------
210.53 Test notification
compliance:
--------------------------------------------------------------------------------------------------------------------
--Notification to FRA 30 days 6 railroads.......... 0.67 reports......... 88 hours............. 59 90.19 5,321.21
before pass-by testing and
copy of compliance report to
be made available to FRA upon
request (New requirement).
--------------------------------------------------------------------------------------------------------------------
210.55 Previously tested
operations:
--------------------------------------------------------------------------------------------------------------------
--(d) A report of the The proposed paperwork burden for this requirement is covered under section 210.53.
previously tested operation to
be maintained in compliance
with 49 CFR 210.53 (New
requirement).
--------------------------------------------------------------------------------------------------------------------
--(e) Report of previously FRA anticipates zero previously tested reports over the three-year-collection period.
tested operations to include
certification and analysis to
demonstrate no material
differences (New requirement).
--------------------------------------------------------------------------------------------------------------------
210.63 Petition for special
approval:
--------------------------------------------------------------------------------------------------------------------
--Procedures for obtaining FRA anticipates zero petitions over the three-year collection period.
special approval for
operations exceeding 220 mph
(New requirement).
--------------------------------------------------------------------------------------------------------------------
Total \69\................. 6 railroads; 6 6 responses.......... N/A.................. 62 N/A 5,546.69
locomotive
manufacturers.
--------------------------------------------------------------------------------------------------------------------------------------------------------
All estimates include the time for reviewing instructions;
searching existing data sources; gathering or maintaining the needed
data; and reviewing the information. Pursuant to 44 U.S.C.
3506(c)(2)(B), FRA solicits comments concerning: whether these
information collection requirements are necessary for the proper
performance of the functions of FRA, including whether the information
has practical utility; the accuracy of FRA's estimates of the burden of
the information collection requirements; the quality, utility, and
clarity of the information to be collected; and whether the burden of
collection of information on those who are to respond, including
through the use of automated collection techniques or other forms of
information technology, may be minimized. For information on, or a copy
of, the paperwork package submitted to OMB, contact Ms. Joanne
Swafford, Information Collection Clearance Officer, at 757-897-9908.
Organizations and individuals desiring to submit comments on the
collection of information requirements should direct them via email to
Ms. Swafford at [email protected].
---------------------------------------------------------------------------
\68\ Throughout the table, the dollar equivalent cost is derived
from the 2024 STB's Full Year Wage A & B data series using the
appropriate employee group to calculate the average hourly rate that
includes 75 percent overhead.
\69\ Totals may not add due to rounding.
---------------------------------------------------------------------------
OMB is required to decide concerning the collection of information
requirements contained in this rule between 30 and 60 days after
publication of this document in the Federal Register. Therefore, a
comment to OMB is best assured of having its full effect if OMB
receives it within 30 days of publication. FRA is not authorized to
impose a penalty on persons for violating information collection
requirements that do not display a current OMB control number, if
required. FRA intends to use the existing 2130-0527 OMB control number
for any new information collection requirements resulting from this
rulemaking action prior to the effective date of the final rule.
E. Federalism Implications
E.O. 13132, Federalism,\70\ requires FRA to develop an accountable
process to ensure ``meaningful and timely input by State and local
officials in the development of regulatory policies that have
federalism implications.'' ``Policies that have federalism
implications'' are defined in E.O. 13132 to include regulations that
have ``substantial direct effects on the States, on the relationship
between the national government and the States, or on the distribution
of
[[Page 48836]]
power and responsibilities among the various levels of government.''
Under E.O. 13132, the agency may not issue a regulation with federalism
implications that imposes substantial direct compliance costs and that
is not required by statute, unless the Federal Government provides the
funds necessary to pay the direct compliance costs incurred by State
and local governments, the agency consults with State and local
governments, or the agency consults with State and local government
officials early in the process of developing the regulation. Where a
regulation has federalism implications and preempts State law, the
agency seeks to consult with State and local officials in the process
of developing the regulation.
---------------------------------------------------------------------------
\70\ 64 FR 43255 (Aug. 10, 1999).
---------------------------------------------------------------------------
FRA has analyzed this proposed rule in accordance with the
principles and criteria contained in E.O. 13132. FRA has determined
that this proposed rule has no federalism implications, other than the
possible preemption under 49 U.S.C. 20106 of State laws addressing HSR
noise emissions. FRA is not aware of any current such State laws, and
therefore concludes that this proposed rule will not have a substantial
effect on the States, on the relationship between the national
government and the States, or on the distribution of power and
responsibilities among the various levels of government. Accordingly,
the consultation and funding requirements of E.O. 13132 do not apply,
and preparation of a federalism summary impact statement for the
proposed rule is not required.
F. International Trade Impact Assessment
The Trade Agreements Act of 1979 \71\ prohibits Federal agencies
from engaging in any standards or related activities that create
unnecessary obstacles to the foreign commerce of the United States.
Legitimate domestic objectives, such as the protection of ``health or
safety,'' \72\ are not considered unnecessary obstacles. The statute
also requires consideration of international standards and, where
appropriate, that they be the basis for U.S. standards.
---------------------------------------------------------------------------
\71\ 19 U.S.C. ch. 13.
\72\ 19 U.S.C. 2531(b).
---------------------------------------------------------------------------
FRA has assessed the potential effect of this rulemaking on foreign
commerce and determined that its proposed requirements are consistent
with the Trade Agreements Act. The proposed requirements are standards
intended to protect ``health or safety,'' which, as noted, are not
considered unnecessary obstacles to trade. Moreover, FRA has sought, to
the extent practicable, to state the proposed requirements in terms of
the performance desired, rather than in terms restricted to a
particular design or system.
FRA also notes that the NPRM proposal to adapt an international
standard--the EU's NOI TSI--is consistent with the Act's encouragement
to consider international standards. Indeed, this adaptation may
increase trade opportunities for U.S. firms doing business in foreign
countries and make it easier for foreign firms doing business in the
U.S., by further harmonizing the global market for high-speed train
technology and equipment. It would permit any domestic manufacturers to
market their HSR trainsets to global markets because they would meet a
similar standard. Note that there are not many domestic manufacturers
of HSR equipment at this time (most of the domestic market consists of
freight equipment). The domestic HSR market consists of international
companies that have or will set up plants in the U.S. and partner with
U.S. rail operators and suppliers.
G. National Environmental Policy Act Compliance
FRA has evaluated this proposed rule consistent with NEPA and FRA's
NEPA implementing regulations.\73\ FRA has determined that this
proposed rule is categorically excluded from environmental review and
therefore does not require the preparation of an environmental
assessment (EA) or environmental impact statement (EIS). Categorical
exclusions (CEs) are actions identified in an agency's NEPA
implementing regulations that do not normally have a significant impact
on the environment and therefore do not require either an EA or
EIS.\74\ Specifically, FRA has determined that this proposed rule
issued under section 17 of the Noise Control Act, 42 U.S.C. 4916, as
amended by section 22423 of IIJA, falls within the description of FRA's
categorical exclusion at 23 CFR 771.116(c)(6) and is categorically
excluded from detailed environmental review.\75\
---------------------------------------------------------------------------
\73\ 23 CFR part 771.
\74\ 40 CFR 1508.1.
\75\ See 23 CFR 771.116(c)(6) (categorically excluding
``[r]ulemakings issued under section 17 of the Noise Control Act of
1972, 42 U.S.C. 4916'').
---------------------------------------------------------------------------
The main purpose of this rulemaking is to establish an alternative
standard for noise emissions from train operations exceeding 160 mph,
up to 220 mph. It would also provide a special approval process for
noise emissions from train operations exceeding 220 mph. FRA has
concluded that no unusual circumstances exist with respect to this
proposed rule that would warrant a more detailed environmental
review.\76\ This determination applies only to the proposed rule
itself. This determination does not exempt individual HSR projects from
the requirements under NEPA to evaluate and disclose the proposed
project's potential environmental effects, including the requirement to
conduct appropriate noise impact analyses and to consider incorporating
appropriate noise mitigation.
---------------------------------------------------------------------------
\76\ See 23 CFR 771.116(b).
---------------------------------------------------------------------------
Pursuant to section 106 of the National Historic Preservation Act
and its implementing regulations, FRA has determined this undertaking
has no potential to affect historic properties.\77\ FRA has also
determined that this rulemaking does not approve a project resulting in
a use of a resource protected by section 4(f).\78\
---------------------------------------------------------------------------
\77\ See 16 U.S.C. 470.
\78\ See Department of Transportation Act of 1966, as amended
(Pub. L. 89-670, 80 Stat. 931); 49 U.S.C. 303.
---------------------------------------------------------------------------
H. Unfunded Mandates Reform Act of 1995
Under section 201 of the Unfunded Mandates Reform Act of 1995,\79\
each Federal agency ``shall, unless otherwise prohibited by law, assess
the effects of Federal regulatory actions on State, local, and Tribal
governments, and the private sector (other than to the extent that such
regulations incorporate requirements specifically set forth in law).''
Section 202 of the Act \80\ further requires that ``before promulgating
any general notice of proposed rulemaking that is likely to result in
promulgation of any rule that includes any Federal mandate that may
result in the expenditure by State, local, and Tribal governments, in
the aggregate, or by the private sector, of $100,000,000 or more
(adjusted annually for inflation) in any one year, and before
promulgating any final rule for which a general notice of proposed
rulemaking was published, the agency shall prepare a written
statement'' detailing the effect on State, local, and Tribal
governments and the private sector. This proposed rule would not result
in the expenditure, in the aggregate, of $100,000,000 or more (as
adjusted annually for inflation) in any one year, and thus preparation
of such a statement is not required.
---------------------------------------------------------------------------
\79\ Public Law 104-4, 2 U.S.C. 1531.
\80\ 2 U.S.C. 1532.
---------------------------------------------------------------------------
I. Energy Impact
E.O. 13211, Actions Concerning Regulations That Significantly
Affect Energy Supply, Distribution, or Use,
[[Page 48837]]
requires Federal agencies to prepare a Statement of Energy Effects for
any ``significant energy action.'' \81\ FRA evaluated this proposed
rule under E.O. 13211 and determined that this regulatory action is not
a ``significant energy action'' within the meaning of E.O. 13211.
---------------------------------------------------------------------------
\81\ 66 FR 28355 (May 22, 2001).
---------------------------------------------------------------------------
J. Tribal Consultation
FRA has evaluated this NPRM in accordance with the principles and
criteria contained in E.O. 13175, Consultation and Coordination with
Indian Tribal Governments.\82\ The proposed rule would not have a
substantial direct effect on one or more Indian tribes, would not
impose substantial direct compliance costs on Indian Tribal
Governments, and would not preempt Tribal laws. Therefore, the funding
and consultation requirements of E.O. 13175 do not apply, and a Tribal
summary impact statement is not required.
---------------------------------------------------------------------------
\82\ 65 FR 67249 (Nov. 9, 2000).
---------------------------------------------------------------------------
K. Privacy Act Statement
In accordance with 5 U.S.C. 553(c), DOT solicits comments from the
public to inform better its rulemaking process. DOT posts these
comments, without edit, to http://www.regulations.gov, as described in
the system of records notice, DOT/ALL-14 FDMS, accessible through
http://www.dot.gov/privacy. To facilitate comment tracking and
response, we encourage commenters to provide their name, or the name of
their organization; however, submission of names is completely
optional. Whether or not commenters identify themselves, all timely
comments will be fully considered. If you wish to provide comments
containing proprietary or confidential information, please contact the
agency for alternate submission instructions.
L. Rulemaking Summary, 5 U.S.C. 553(b)(4)
As required by 5 U.S.C. 553(b)(4), a summary of this rule can be
found at regulations.gov, Docket No. FRA-2025-0786, in the SUMMARY
section of this proposed rule.
List of Subjects in 49 CFR Part 210
Noise control, Railroads.
The Proposed Rule
For the reasons discussed in the preamble, the Federal Railroad
Administration proposes to amend 49 CFR part 210 as follows:
PART 210--RAILROAD NOISE EMISSION COMPLIANCE REGULATIONS
0
1. Revise the authority for 49 CFR Part 210 to read as follows:
Authority: 42 U.S.C. 4916; Pub. L. 117-58, 135 Stat. 752; 49
CFR 1.89.
Subpart A--General Provisions
0
2. Section 210.5 is amended by republishing paragraph (c) introductory
text and adding in alphabetical order the definitions of ``background
noise,'' ``maximum operating speed,'' ``mph,'' and ``pass-by time'' in
paragraph (c) to read as follows:
Sec. 210.5 Definitions.
* * * * *
(c) Additional definitions. As used in this part--
* * * * *
Background noise means the total acoustical and electrical noise,
from all sources in a measurement system, that may interfere with the
production, transmission, time averaging, measurement, or recording of
an acoustical signal.
* * * * *
Maximum operating speed means the maximum speed at which the train
will operate under this rule. It is abbreviated Vmax.
Mph means miles per hour.
* * * * *
Pass-by time means the time, in seconds, it takes the entire length
of the train (from nose to tail) to pass by the measurement position.
It is abbreviated Tp.
* * * * *
0
3. Add subpart C to read as follows:
Subpart C--High-Speed Train Noise Emission Alternative Compliance
Sec.
210.41 Scope of subpart.
210.43 Alternative compliance standard.
210.45 Measurement site conditions.
210.47 Measurement criteria and procedures.
210.49 Operation standards.
210.51 Track conditions.
210.53 Test notification and compliance reporting.
210.55 Previously tested operations.
Subpart C--High-Speed Train Noise Emission Alternative Compliance
Sec. 210.41 Scope of subpart.
This subpart provides compliance standard and testing criteria for
noise emissions from train operations exceeding 160 mph, up to 220 mph,
in the alternative to those in the Standards (40 CFR part 201) and
subpart B of this part.
Sec. 210.43 Alternative compliance standard.
In accordance with this subpart C, the total sound emitted by
moving rail cars and locomotives for all operations exceeding 160 mph,
but not more than 220 mph, may comply with the limits specified in this
section.
(a) Leq during pass-by at the maximum operating speed,
when measured in accordance with the criteria specified in this subpart
and normalized to 160 mph according to the equation in paragraph (b) of
this section, shall not exceed 96 dB(A).
(b) Leq(160 mph) = Leq(Vmax)- 50*log(Vmax/160
mph).
Where--
Leq(Vmax) is the A-weighted equivalent sound level at
speed Vmax.
Sec. 210.45 Measurement site conditions.
Measurement shall take place 25 feet (ft) from the centerline of
the track, at heights of both 4 ft and 12 ft above top of rail. To
ensure minimal interference with measurements, a circular area around
the microphones having a radius of at least 75 ft shall be free of
large reflecting objects like barriers, hills, rocks, bridges, or
buildings. The test site shall be such that free sound propagation
exists in the triangular area between the track and the microphone
extending along the track 50 ft to either side. See Figure 1 to this
subpart. To achieve this result:
(a) The level of the ground surface over this area shall be within
0 ft to -10 ft, relative to the top of rail.
(b) This area shall be free of other tracks, of sound-absorbing
matter such as snow or tall vegetation, and free of reflective covering
such as water, ice, or pavement. No absorptive material shall be added
to the area for the purpose of the test.
(c) No person shall be present in this area.
[[Page 48838]]
Figure 1 to Subpart C of Part 210--Test Site Conditions
[GRAPHIC] [TIFF OMITTED] TP03AU26.054
Sec. 210.47 Measurement criteria and procedures.
(a) Quantities measured are defined in 40 CFR 201.21.
(b)
(1) A sound level meter or alternate system that meets industry
standards, such as the requirements for a class 1 instrument specified
in International Electrotechnical Commission (IEC) 61672-1:2002, must
be used. Before and after each series of measurements, the measurement
system shall be calibrated appropriately. The sound calibrator also
must meet industry standards, such as the requirements for a class 1
instrument according to IEC 60942:2003. If the difference between the
two consecutive calibrations is more than 0.5 dB, the measurement
results in between shall be rejected.
(2) The compliance of the calibrator with industry standards shall
have been verified within one year of use for calibration of the
instrumentation system used for the measurement. The compliance of the
instrumentation system with industry standards shall have been verified
within two years of use for the measurement. The date of the last
verification of compliance with the relevant standards shall be
recorded in the test report.
(3) The manufacturer's instructions pertaining to mounting and
orienting the microphone; positioning of the observer; and periodic
factory re-calibration shall be followed.
(4) A suitable microphone windscreen shall be used, and there shall
be no winds in excess of 12 mph during the test.
(5) A tripod or similar microphone mounting shall be used to
minimize interference with the sound being measured.
(c) The measurement duration shall be such that the entirety of the
train pass-by is recorded. Specifically, starting when the A-weighted
sound pressure level is at least 10 dB lower than found when the front
of the train is opposite the microphone position, and ending after the
A-weighted sound pressure level is at least 10 dB lower than found when
the rear of the train is opposite the microphone position, see Figure 2
to this subpart.
[[Page 48839]]
Figure 2 to Subpart C of Part 210--Measurement Duration
[GRAPHIC] [TIFF OMITTED] TP03AU26.055
(d) Care shall be taken to ensure that the noise from other sources
does not influence the measurements significantly.
(e) Leq for the background noise shall be measured for a
time period of at least 20 seconds both before and after each set of
measurements. The equivalent sound level of the background noise during
this period shall be at least 10 dB below the measured Leq
of the train.
(f) The arithmetic average of three measurements under each test
condition shall be used to determine compliance. The spread of the
measurement samples at a single speed and measurement height must be
less than 3 dB for the measurement to be considered valid. Compliance
must be met for each test condition specified at the maximum operating
speed pass-by for a microphone height of:
(1) 4 ft above top of rail; and
(2) 12 ft above top of rail.
Sec. 210.49 Operation standards.
(a) Compliance with this subpart shall be demonstrated under pass-
by at the maximum operating speed.
(b) During the test, the speed of the train shall be stabilized to
within 5 mph of the test speed. The speed shall be measured
by a device with a maximum permissible measurement error of 5 mph. The
speedometer of the train may be used, provided a calibration with a
target measurement uncertainty of no more than 5 mph.
(c) During the test, the train shall be operating at a minimum
tractive effort to maintain a constant speed. To ensure a steady
operating condition, it may be necessary to operate the train for a
period of time in advance of the test.
(d) During the test, the HVAC systems conditioning passenger areas
and working places shall be operating at settings consistent with
customary passenger service.
Sec. 210.51 Track conditions.
(a) Measurements shall be taken on reasonably well-maintained
tracks.
(b) The track shall have a consistent superstructure over a minimum
distance of 50 ft to each side of the measurement location. The level
gradient at the track shall be 5:1,000 at the most. The radius of
curvature of the track should be greater than 16,400 ft.
(c)
(1) The standard superstructure for the test is a track with
ballast bed and shall not include any type of rail or track shielding
(e.g., low barriers or berms). The ballast shall be loose, i.e., not
bound together by ice or glue and not blocked by debris.
(2) If a different track superstructure than that specified in
paragraph (c)(1) of this section is used under normal operating
conditions and consistently applied throughout the system, that track
superstructure may be used for the test to demonstrate compliance with
this subpart. The different track superstructure shall be described in
the test report.
Sec. 210.53 Test notification and compliance reporting.
(a) FRA shall be notified in writing 30 days before pass-by testing
of equipment for compliance with this subpart. The notification shall
include the time(s), date(s), and place(s) of such testing to permit
FRA observation of the testing and be submitted to FRA's Associate
Administrator for Railroad Safety and Chief Safety Officer either by
hard copy or electronically.
(b) A report of the pass-by testing required for compliance with
this subpart shall--
(1) Be maintained electronically or in paper; be certified or
signed by the person who performs the test; be retained by the carrier
at a location of its choice; and be made available to FRA for review
and copying in a readily usable format upon request; and
(2) Include the train type and description; the date, place, and
operating speeds tested; all required sound level measurements
(including background noise); wind speed; track superstructure; and
sound level meter, microphone, and calibrator and instrumentation
calibration dates.
Sec. 210.55 Previously tested operations.
(a) Results from a previously tested operation may be used to
demonstrate compliance with this subpart for a
[[Page 48840]]
proposed operation at any operating speed between 160 mph and the
maximum operating speed for which the previously tested operation
demonstrated compliance, up to 220 mph.
(b) A proposed operation using the results from a previously tested
operation must be shown to have no material differences affecting noise
emission between the equipment used in the proposed operation and the
equipment used in the tested operation.
(c) If the previous operation was tested in accordance with 49 CFR
210.51(c)(2), then the track superstructure of the proposed operation
must be the same as that described for the previously tested operation.
(d) A report of the previously tested operation will be maintained
for the proposed operation in compliance with 49 CFR 210.53.
(e) A report for the proposed operation must additionally include:
(1) A certification that the equipment used in the proposed
operation demonstrates no material differences affecting noise emission
when compared with the tested equipment and that the proposed operation
utilizes the same track superstructure as the previously tested
operation.
(2) The basis for the certification in this paragraph (e)(1),
including an analysis of any changes to systems, designs, or components
that may contribute to additional noise emission.
0
4. Add subpart D to read as follows:
Subpart D--Special Approvals
Sec.
Sec. 210.61 Scope of subpart.
Sec. 210.63 Petition for special approval.
Sec. 210.65 Disposition.
Subpart D--Special Approvals
Sec. 210.61 Scope of subpart.
This subpart prescribes the procedures for obtaining special
approval for operations exceeding 220 mph that demonstrate a level of
noise emission protection consistent with the requirements of subpart C
of this part.
Sec. 210.63 Petition for special approval.
(a) Each petition for special approval shall contain--
(1) The proposed noise emission standard, in detail, including:
(i) Any alternative testing methodologies or procedures and
measurement criteria; and
(ii) A description of the operating environment and its features,
as relevant to the petition, including the use of any cost-effective
noise mitigation techniques;
(2) Appropriate data and analysis establishing that the proposed
standard will provide a level of protection consistent with the
requirements of subpart C of this part, including to the extent
practical all testing information and analysis required by Sec.
210.53; and
(3) The name, title, address, and telephone number of the primary
person to be contacted with regard to review of the petition.
(b) FRA will publish a notice in the Federal Register concerning
each petition for special approval under this section.
Sec. 210.65 Disposition.
(a) If the Administrator finds it necessary or desirable, FRA will
conduct a hearing on a petition in accordance with the procedures
provided in 49 CFR part 211.
(b) If FRA finds that a petition complies with the requirements of
Sec. 210.63 and demonstrates a level of noise emission protection
consistent with the requirements of subpart C of this part, the
petition will be granted. Otherwise, the petition will be denied. FRA
may attach conditions to the approval of the petition.
(c) FRA may reopen consideration of the petition for cause stated.
(d) FRA will provide written notice to the petitioner and other
interested parties when the petition is granted, denied, or reopened
for consideration.
Issued in Washington, DC, under authority provided by 42 U.S.C.
4916 and delegated in 49 CFR 1.89.
David A. Fink,
Administrator.
[FR Doc. 2026-15724 Filed 7-31-26; 8:45 am]
BILLING CODE 4910-06-P