The U.S. Nuclear Regulatory Commission (NRC or Commission) is considering issuance of a one-time exemption, pursuant to 10 CFR 71.8, from the provisions of 10 CFR 71.73(c)(1) and (3) to the Federal Emergency Management Agency (FEMA). The requested exemption would allow FEMA to transport ten CDV–794 calibrators containing up to 85 curies of cesium-137 in packages that otherwise meet the performance requirements for a Type B transportation package pursuant to 10 CFR part 71 as exempted. Nine calibrators will be shipped to a central location so that disassembly of the calibrators and disposal of the
An NRC categorical exclusion for package approvals in 10 CFR 51.22(c)(13) does not apply to packaging authorized under an exemption. Consequently, an environmental assessment of the proposed exemption was prepared. The Department of Transportation (DOT) has already issued an exemption from DOT regulations for the proposed calibrator shipments.
Each calibrator will contain a radioactive source that is designed to meet the special form requirements of 10 CFR 71.75. The source is contained in a tungsten alloy source holder which is bolted and sealed into the primary depleted uranium (DU) shield. The DU shield is bolted to an aluminum-lined steel calibration chamber. This entire assembly is then bolted in a rectangular steel cabinet mounted on a tubular steel stand. The cabinet has two hinged metal covers that allow the calibrator to be locked to prevent unauthorized access. The calibrator is then placed into a custom-design wooden overpack for shipment.
FEMA plans to dispose of nine cesium-137 sources contained in the CDV–794 calibrators by transfer to another licensee. To accomplish this task, nine CDV–794 calibrators will need to be transported from their present location to FEMA's Mount Weather Emergency Assistance Center in Berryville, Virginia; the tenth CDV–794 calibrator will be transferred for use at a U.S. Army facility in Hawaii. FEMA has contracted with the U.S. Army Communication-Electronic Command (CECOM) radiological specialists to supervise and conduct the required shipments. CECOM will travel to each of the ten sites and conduct contamination surveys and prepare the calibrators for shipment in accordance with FEMA's written procedures. CECOM will ship the calibrators in exclusive-use vehicles and accompany each shipment to its final destination. Upon arrival at FEMA's Mount Weather Emergency Assistance Center, CECOM will conduct physical inspection and contamination surveys. Other properly licensed personnel will then remove the cesium sources, consolidate them into NRC-certified transportation packages and ship them to a contractor's facility in California. Once the cesium sources are removed, CECOM will remove the depleted uranium shields and coordinate final disposition of all remaining calibrator components. FEMA estimates the transport and disposal project will end in 2002, pending the appropriation of sufficient funds for the activity.
Section 71.73(c)(1) and (3) concern tests for hypothetical accident conditions and require: (1) “A free drop of the specimen through a distance of 9 m (30 feet) onto a flat, essentially unyielding, horizontal surface, striking the surface in a position for which maximum damage is expected.”, and (2) “A free drop of the specimen through a distance of 1 m (40 in) in a position for which maximum damage is expected, onto the upper end of a solid, vertical, cylindrical, mild steel bar mounted on an essentially unyielding, horizontal surface. The bar must be 15 cm (6 in) in diameter, with the top horizontal and its edge rounded to a radius of not more than 6 mm (0.25 in), and of a length as to cause maximum damage to the package, but not less than 20 cm (8 in) long. The long axis of the bar must be vertical.” FEMA determined that the calibrator would not survive a 30-foot drop test because the bolts holding the source shield to the calibrator cabinet would fail. FEMA stated that the calibrator could withstand an accidental 10-foot drop. FEMA also stated that the package meets the other tests for hypothetical accident conditions except for the 1 meter puncture test. FEMA further proposed compensatory safety measures to provide an adequate level of safety during the shipments.
By exempting FEMA from the hypothetical accident free drop and puncture tests in 10 CFR 71.73 the NRC will be able to approve the package for the shipment of nine calibrators to a central facility and one calibrator to another licensee under the general license in 10 CFR 71.12(a). The proposed action before the Commission is whether to grant these exemptions under 10 CFR 71.8 and approve the package for the one-time transport of these calibrators.
On December 19, 2000, FEMA submitted a SA/ER to NRC to address the proposed shipment of calibrators that does not meet the performance requirements of 10 CFR part 71. FEMA provided additional information on February 13, and March 9, 2001, in response to the NRC staff's requests. The NRC staff has reviewed the application and has determined that authorizing the one-time shipment of each of the ten calibrators, with compensatory safety measures, would not be inimical to public health and safety.
The calibrators were originally manufactured by Technical Operations Inc. The manufacturer certified the calibrators to meet the requirements of DOT Specification 55 containers, which
The staff concurs with FEMA's safety evaluation of the proposed exemption request and finds that FEMA's planned compensatory measures ensure that use of the package in accordance with the exemption requested does not pose a significant increased risk to public health and safety. Furthermore, the proposed action now under consideration would not change the potential environmental effects assessed in the 10 CFR part 71 rulemaking (40 FR 23768 (1977)).
Therefore, the staff has determined that there will be no significant environmental impacts as a result of approving the exemption for the one-time shipment of the specified calibrators.
The environmental impacts of the proposed action have been reviewed in accordance with the requirements set forth in 10 CFR part 51. Based upon the foregoing EA, the Commission finds that the proposed action of approving a package with an exemption from 10 CFR 71.73(c)(1) and (3) so that FEMA may transport ten calibrators containing cesium-137 will not significantly impact the quality of the human environment. Accordingly, the Commission has determined not to prepare an environmental impact statement for the proposed exemption.
For further details with respect to this exemption request, see the FEMA exemption request dated July 21, 1999, and FEMA's Safety Analysis and Environmental Report dated December 19, 2000, as supplemented February 13, and March 9, 2001, which are docketed under 10 CFR part 30, Docket No. 30–7130.
The exemption request is available for public inspection at the Commission's Public Document Room, One White Flint North, 11555 Rockville, MD 20852, or from the publicly available records component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC web site at