Federal Energy Regulatory Commission.
Final rule.
The Federal Energy Regulatory Commission is amending its regulations governing standards for interstate pipeline business operations and communications to require that pipelines permit releasing shippers, as a condition of a capacity release, to recall released capacity and renominate such recalled capacity at each nomination opportunity. Recalls of released capacity will not be permitted to reduce (bump) already scheduled volumes for replacement shippers unless the replacement shippers are provided with at least one opportunity to rescheduled any bumped volumes, which is similar to the protection afforded interruptible shippers. This rule creates greater flexibility for firm capacity holders on interstate pipelines by synchronizing the Commission's regulation of recalled capacity with its standards for intra-day nominations. The rule also will enhance competition by freeing up capacity that otherwise would not be released and creating greater parity between scheduling of capacity release transactions and pipeline interruptible service.
1. The rule becomes effective April 17, 2002.
2. Pipelines must make tariff filings by May 1, 2002, to become effective by July 1, 2002, to provide shippers with the ability to recall scheduled and unscheduled capacity at the Timely and Evening Nomination cycles and to recall unscheduled capacity at the two other standard nomination times.
3. Comments are to be filed by the North American Energy Standards Board and others by October 1, 2002, regarding standards for implementing partial day or flowing day recalls. Reply comments must be filed by October 15, 2002.
Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426.
1. The Federal Energy Regulatory Commission (Commission) is amending § 284.12(c)(1)(ii) of its open access regulations to require that interstate pipelines permit releasing shippers to recall released capacity and renominate that recalled capacity at any of the scheduling opportunities provided by interstate pipelines. Recalls of released capacity will not be permitted to reduce (bump) already scheduled volumes for replacement shippers unless the replacement shippers are provided with at least one opportunity to rescheduled any bumped volumes, which is similar to the protection afforded interruptible shippers. This rule creates greater flexibility for firm capacity holders on interstate pipelines by synchronizing the Commission's regulation of recalled capacity with its standards for intra-day nominations. The rule also will enhance competition by freeing up capacity that otherwise would not be released and creating greater parity between scheduling of capacity release transactions and pipeline interruptible service.
3. In Order No. 636, the Commission adopted regulations permitting shippers (releasing shippers) to release their capacity to other shippers (replacement shippers).
4. In July 1996, in Order No. 587,
5. One aspect of NAESB's standards adopted in Order No. 587 covered capacity release transactions. Of relevance here, two standards, 5.3.6 and 5.3.7, apply to recalls of capacity release transactions.
6. In 1996, when NAESB first adopted these standards, NAESB's standards provided for one nomination, at 11:30 a.m. CCT
7. In Order No. 637, the Commission adopted § 284.12(c)(1)(ii) of its regulations which requires interstate pipelines to “permit shippers acquiring released capacity to submit a nomination at the earliest available nomination opportunity after the acquisition of capacity.”
8. On February 1, 2001, NAESB filed a report with the Commission, in Docket No. RM98–10–000, concerning its development of standards regarding partial day recalls of capacity. According to NAESB, some members believed that partial day recalls fell within the purview of the scheduling equality requirements of Order No. 637, while others did not. Some members, NAESB asserts, believed that partial day recalls are a valid business practice, irrespective of whether this practice is required by Order No. 637. Due to these disagreements, NAESB reports it has been unable to reach consensus on how to proceed.
9. On March 16, 2001, AGA filed a “Reply to February 1, 2001, Gas Industry Standards Board Report and Petition for Clarification and Directive from FERC Regarding Requirement for Capacity Release Scheduling Equality.” AGA argued that the Commission should require pipelines to allow partial day recalls as part of their compliance with § 284.12(c)(1)(ii).
10. On October 12, 2001, the Commission issued a Notice of Proposed Rulemaking (NOPR)
12. Twenty-eight comments on the NOPR were filed.
The proposed rules would provide firm capacity holders, including the Xcel Energy utility operating companies, with increased flexibility in structuring capacity release transactions to best fit their business needs. The Xcel Energy utility operating companies could benefit from the potential increase in value of non-recallable capacity release and from the greater flexibility when a recall is necessary.
Comment at 2.
13. Those opposing the proposal
14. A number of comments raise operational issues relating principally to partial or flowing day recalls occurring during the gas day after capacity has begun to flow. These include: the need for advance notice to pipelines and replacement shippers of capacity to be recalled, and whether the pipeline or releasing shipper should provide the notice;
17. The Commission is revising § 284.12(c)(1)(ii) of its regulations to require pipelines to permit recalls of capacity at each nomination opportunity. Specifically, the Commission is requiring pipelines to permit releasing shippers, as a condition of a capacity release, to recall released capacity and renominate such recalled capacity at each nomination opportunity according to the notice and bumping provisions applicable to interruptible shippers.
18. The regulations adopted in this rule will be implemented in two phases. This two-phase approach will ensure an expeditious implementation of partial day recalls for recalls that do not raise the operational details addressed in the comments, while at the same time providing time for NAESB to further consider standards to address the operational issues raised. By May 1, 2002, each pipeline will be required to make a compliance filing, to be effective July 1, 2002, that will permit shippers to recall capacity at both the Timely Nomination cycle and the Evening Nomination Cycle and to recall capacity at any nomination time if the capacity has not been previously scheduled by the replacement shipper. To ease the compliance and review process, the Commission is establishing a standard tariff provision providing a notification schedule for these recalls.
19. Second, the Commission will provide NAESB six months in which to develop standards to apply to the operational details involved in allowing partial or flowing day recalls. NAESB should file a report with the Commission by October 1, 2002, detailing the standards it has adopted (or those it has considered) and all other material relevant to its consideration of such standards. Other industry members can also submit comments by October 1, 2002, and will have an additional 15 days from the filing of the NAESB information to file additional comments on the NAESB report. Upon the receipt of these comments, the Commission will issue a further order regarding implementation of Intra-Day 1 recalls.
21. The regulations adopted in this rule will ensure consistency with the original intent of the Commission's capacity release regulations by providing releasing shippers with the flexibility to structure capacity release transactions that best fit their business needs, by providing greater incentives for releasing shippers to release capacity, and by fostering greater competition for pipeline capacity by creating parity between scheduling of capacity release transactions and pipeline interruptible service. At the same time, the regulations will afford replacement shippers whose capacity is recalled the same advance notice and protection from bumping as provided to interruptible shippers under the Commission's regulations.
22. In Order No. 636, the Commission established the capacity release mechanism to create competition with pipeline firm and interruptible transportation.
23. When NAESB first considered recall standards, it established one notification time for all recalls (8 a.m. CCT) and did not permit partial or flowing day recalls. When NAESB adopted this standard, however, the standards provided for only one nomination a day, at 11:30 a.m. CCT and a single non-standardized intra-day nomination. But the circumstances under which the recall standards were developed have markedly changed as the number of nomination opportunities have now expanded to four nomination opportunities. At the same time, it is apparent from the comments in this rulemaking that the consensus supporting NAESB's existing recall standards no longer exists, and NAESB itself has recognized that it can no longer make progress in resolving this issue. Although the Commission places great reliance on NAESB's development of consensus standards,
24. An examination of both past and current Commission policy supports allowing releasing shippers to recall capacity more frequently than currently permitted under NAESB's standards.
25. The Commission's general policy adopted in Order No. 636 would permit more extensive recall rights than those permitted by the NAESB standards. Section 284.8(b) of the Commission's regulations (adopted in Order No. 636) expressly permits shippers to “release their capacity in whole or in part, on a permanent or short-term basis,
26. Moreover, in Order No. 637, the Commission sought to create greater scheduling parity between capacity release transactions and pipeline services by enabling capacity release transactions to take place on an intra-day basis at each of the four scheduling opportunities.
27. Policy considerations further support enhanced recall rights. Permitting enhanced recall rights will provide firm shippers with added flexibility and will better enable releasing shippers to offer released capacity that competes with the pipelines' interruptible service. The current NAESB standards inhibit the ability of shippers to release capacity because releasing shippers cannot quickly reclaim capacity when they require it for their own use. For example, under the current NAESB standards, in order to recall capacity for the next gas day, a shipper must notify the pipeline by 8 a.m. the day before the recall can take effect and cannot use partial or flowing day recalls. By establishing an 8 a.m. deadline for recall notifications, the standard effectively precludes a releasing shipper from recalling capacity at the Evening Nomination cycle. In fact, a shipper that misses the 8:00 a.m. CCT recall notification time will miss four nomination opportunities and will be unable to have its volume flow until 48 hours after it submits the recall notification.
28. As a result of such lengthy delays, releasing shippers may not be able to use their recall rights as effectively as possible to ensure that they can retain adequate peak day capacity for their own needs. The delay in rescheduling recalled capacity also can have an adverse competitive impact on the market by reducing the amount of capacity available for release. As AGA points out, if an LDC is a provider of last resort under a state unbundling initiative and is given notice that insufficient supply is being delivered to its city-gate, the LDC will need to recall released capacity for later in the same day or, at least, for the next day. Without the ability to recall capacity more frequently, a releasing shipper with supplier-of-last-resort obligations will be reluctant to release capacity at all since it will not be able to recall that capacity when it is needed. In that event, replacement shippers will have less capacity from which to choose and will have fewer alternatives to purchasing pipeline interruptible service.
29. Replacement shippers benefit from having a more open and competitive capacity market, with more capacity available to compete with pipeline interruptible transportation. As APS/PWEC states, “as a captive shipper on a fully subscribed pipeline, APS/PWEC supports any initiative that would free up excess capacity (even in the short run).”
30. Under the regulations adopted in this rule, the releasing shipper will be able to recall unscheduled capacity at any of the four nomination cycles and can recall scheduled capacity so long as the replacement shipper has an opportunity to reschedule its gas. The replacement shipper will receive protection against loss of service similar to that interruptible shippers currently receive.
31. In Order No. 587–G, the Commission adopted a regulation stating that when an interruptible shipper's volumes are to be reduced as a result of a nomination by a firm shipper, the interruptible shipper must be provided with advanced notice of such reduction and must be notified whether penalties will apply on the day its volumes are reduced.
32. This rationale applies equally to replacement shippers, which, under the regulations adopted in this rule, must be given advance notification of any recall and cannot have scheduled volumes reduced unless they have been given an opportunity to reschedule their gas. In addition, the Commission required pipelines to waive certain non-critical penalties for bumped interruptible shippers, and the same penalty waiver will be applied to bumped replacement shippers.
33. The Commission recognizes that implementation of recalls at the Intra-Day 1 and 2 cycles can affect flowing gas and, as the comments point out, result in the need to allocate daily nominations (and potentially penalties) between releasing and replacement shippers. But these issues are not insurmountable and should not prevent implementation of partial day recalls. Some pipelines already have implemented partial day recalls on their systems.
34. The Commission, however, sees no reason for delaying implementation of partial day recalls for the Evening Cycle and for recalls of unscheduled capacity. Recalls in these situations will not present allocation or other operational difficulties for the pipelines. Such recalls do not affect flowing volumes and, therefore, do not result in the need to allocate daily gas supplies
36. The NOPR proposed that no advance notice of recalls would be provided, so that the recall and a renomination of the releasing shipper would be provided at each of the standard nomination cycles. For example, under the proposal in the NOPR, the releasing shipper would notify the pipeline at 6 p.m. CCT (Evening Nomination) that capacity is being recalled and would simultaneously submit a nomination at the same time. The replacement shipper would not be notified of the bump, under this proposal, until the deadline for reporting of scheduled volumes (10 p.m. CCT).
37. A number of comments, however, maintain that recall notices and nominations should not be simultaneous and that pipelines and replacement shippers need advance notice of recalls. Whether to establish an advance notification requirement for recalls, and how that notice should be provided, are issues NAESB needs to consider during its deliberations. The treatment of advance notification can determine whether recalls at the Intra-Day 2 cycle can bump scheduled volumes. If NAESB provides for advance notice of recalls to pipelines and replacement shippers, releasing shippers could be permitted to bump scheduled gas at the Intra-Day 2 cycle, since replacement shippers will have sufficient advance notice to reschedule bumped gas at the Intra-Day 2 cycle.
38. Since the Commission is implementing recalls of scheduled gas at the Evening Nomination cycle and recalls of unscheduled gas at the Intra-Day 1 and Intra-Day 2 cycles, pipelines will need to implement an interim schedule for implementing recalls for these cycles. In order to assure expeditious compliance with these requirements, the Commission is establishing, as discussed below, an interim timeline for recalls and will require each pipeline to include standard tariff language in its tariff providing for such recalls.
39. The fundamental precept of the interim schedule being adopted by the Commission is that releasing shippers must be provided with sufficient time after receipt of scheduled quantities to inform the pipeline of a recall. Releasing shippers, such as LDCs, need to be aware of the scheduled volumes for their systems prior to determining whether they will need to recall capacity. Thus, the advance notification period should give releasing shippers the time to evaluate the scheduled quantities information before having to submit the recall notice.
40. Based on these precepts, the Commission is establishing the following interim schedule for notification to pipelines and replacement shippers of recalls of capacity at the Evening Nomination cycle and for recalls of unscheduled capacity.
41. To ease the compliance and review burden on both pipelines and shippers, each pipeline is required to file standard tariff language to implement such recalls stating the following:
Releasing shippers may, to the extent permitted as a condition of the capacity release, recall released capacity (scheduled or unscheduled) at the Timely Nomination cycle and the Evening Nomination cycle, and recall unscheduled released capacity at the Intra-Day 1 and Intra-Day 2 Nomination cycles by providing notice to the Transporter by the following times for each cycle: 8 a.m. CCT for the Timely Nomination cycle; 5:00 p.m. CCT for the Evening Nomination Cycle; 8 a.m. CCT for the Intra-Day 1 Nomination cycle, and 3:00 p.m. for the Intra-Day 2 Nomination cycle. Notification to replacement shippers provided by Transporter within one hour of receipt of recall notification.
42. The Commission will address below those comments opposing or suggesting changes in the regulation or requesting clarification. Comments addressing procedural issues will not be addressed since NAESB will be considering those issues.
44. Those opposing adoption of a regulation permitting partial day recalls contend that permitting any partial day recalls will operate to diminish the attractiveness of released capacity, and will, therefore, result in limiting competition between pipeline firm and released capacity. They further maintain that allowing partial day recalls will be harmful to replacement shippers, because replacement shippers will be unable to reschedule gas bumped by the partial day recall. DETM contends that, for better or worse, all gas transactions occur for a full gas day, and that this will create difficulties for replacement shippers trying to reschedule gas subject to partial day recalls. DETM further maintains that no data supports the proposition that the availability of partial day recalls will have any measurable impact on the availability of released capacity.
45. Since Order No. 636, the Commission's regulation of released capacity has proceeded from the presumption that the best way to improve access to capacity is to provide both releasing and replacement shippers as much flexibility as possible in structuring their capacity release transactions. In Order No. 637, for instance, the Commission required pipelines to permit releasing and replacement shippers to consummate capacity release transactions at each of the four intra-day nomination opportunities to ensure that replacement shippers could obtain capacity when they need it.
46. Moreover, it is not clear that prohibiting partial day recalls would benefit replacement shippers in the long run. DETM and Dynegy appear to be assuming that without partial day recalls, firm shippers will release the same amount of capacity on a full day's basis as they would if partial day recalls are available. However, many of the comments point out that firm shippers that need capacity on short notice are reluctant to release their capacity at all if they are unable to recall that capacity in the event of changed circumstances, such as dropping temperatures or the failure of a marketer to deliver gas.
47. Dynegy, DETM, and EPSA further assert that allowing partial day recalls may make capacity releases subject to such recalls less valuable to replacement shippers. In the first place, as noted above, the commenters are assuming such capacity will be available for release if partial day recall rights were not available to the releasing shipper, an assumption that other comments show is not necessarily correct. Released capacity available subject to partial day recall is certainly more valuable to replacement shippers than not having that capacity available at all.
48. Moreover, if replacement shippers find that released capacity with partial day recalls is too unreliable, they need not purchase that released capacity and can negotiate with the releasing shippers for conditions providing more reliable service. Under the regulations adopted here, releasing shippers are not required to include partial day recalls in their releases. Releasing shippers can release capacity on a full day basis (not subject to partial day recalls) and will have an incentive to do so, because a full day release will be more valuable (and higher priced) than a partial day recall release. The replacement shippers will know the terms of releases upfront and can determine whether to purchase that capacity, negotiate other terms with the releasing shipper, or seek more reliable capacity, and can take the recall conditions into account in determining how much the capacity is worth. In a fully functioning market, buyers and sellers negotiate over the terms of their deals so that the price and other components reflect terms that are mutually agreeable to both parties. Imposing artificial regulatory limits on the negotiating position of one party to the transaction, as proposed by those opposing partial day recalls, is the antithesis of fully functioning markets, and can only create a less efficient marketplace.
49. DETM and Dynegy also contend that permitting partial day recalls will reduce the reliability of the pipeline grid because replacement shippers are subject to losing their capacity and may be unable to reschedule capacity. These arguments are reminiscent of the arguments made in 1998 against allowing firm intra-day nominations to bump interruptible transportation on the grounds that interruptible shippers would have difficulty rescheduling their gas.
Firm shippers are paying reservation charges for priority rights and those rights should include the right to have a nomination become effective as early as possible on the gas day following the nomination. Interruptible shippers voluntarily take the risk that their service will be interrupted and while they are entitled to advance notice of such interruption, they should not be able to prevent firm shippers from having their nominations take effect at the earliest possible time. Gas flows on the interstate grid 24-hours a day, and is consumed throughout the day, so interruptible shippers need to be prepared to adjust gas volumes even during non-business hours.
50. In this instance, firm shippers paying reservation charges should similarly have the ability to control the use of their capacity by employing partial day recalls. Shippers purchasing released capacity subject to partial day recalls, like those purchasing interruptible transportation, are taking the risk that their scheduled quantities may be disrupted. As gas markets continue to develop, such adjustments will be increasingly necessary to provide those shippers holding firm
51. Moreover, like interruptible shippers, replacement shippers are protected, because bumping of scheduled volumes is only permitted if the replacement shipper has at least one opportunity to reschedule its gas. Replacement shippers also have tools available, such as pooling, gas package identifiers, and ranking, that they can use to manage their gas supplies in the event of a bump.
52. WDG maintains that the Commission should not exempt the Intra-Day 2 nomination from a partial day recall. It argues that the replacement shippers have fair notice that their capacity is recallable, and therefore are not prejudiced by having a recall at the Intra-Day 2 cycle.
53. The regulation adopted in this rule does not prohibit all recalls at the Intra-Day 2 cycle. Recalls of unscheduled capacity can be made at the Intra-Day 2 cycle. As discussed earlier, NAESB is to consider establishing a notification schedule by which pipelines and replacement shippers are to be notified of recalls. Bumping at the Intra-Day 2 cycle may be permitted depending on whether the replacement shipper is given sufficient time to renominate any bumped gas at the Intra-Day 2 cycle.
54. DETM maintains that the partial day recall issue is not a policy dispute, but a business issue that should be left to NAESB to resolve. It argues that the Commission has historically deferred to the determinations of NAESB on business issues and, therefore, should not overturn the business decision by NAESB to prohibit partial day recalls.
55. The dispute here is not simply a question of business practices, but a question of regulatory policy regarding the relative rights of releasing and replacement shippers under the Commission's capacity release mechanism. Here, the Commission has determined that, under its regulations, releasing shippers should be given full rights to use their capacity flexibly by recalling that capacity on an intra-day basis, and that the contrary NAESB standards should no longer be incorporated by reference.
56. It is true that the Commission gives great weight to the standards adopted by NAESB, because these standards represent a consensus of the industry. In fact, the Commission initially adopted NAESB's consensus standards limiting capacity release recalls, even though the Commission's regulations (§ 284.8 (b)) would have permitted partial day recalls. Now, however, it is clear from the record of deliberations at NAESB, and the comments filed in this proceeding, that the existing NAESB standards on partial day recalls no longer command a consensus of the industry.
58. A number of the comments ask for clarification of aspects of the regulations and the way in which partial day recalls will operate.
60. NiSource maintains the Commission's regulation is vague and seems to imply that all released capacity is subject to partial day recalls. Williams and ENA similarly seek clarification that parties retain the flexibility to decide whether capacity is recallable on an intra-day basis. Williams further seeks clarification that the proposed rule is prospective only and does not affect previous capacity release contracts.
61. The Commission has revised its proposed regulation to make clear that pipelines need only provide releasing shippers with the opportunity to include partial day recalls as a condition in capacity release offers. Whether a partial day recall applies to a capacity release will depend upon the terms of the agreement between the releasing and replacement shipper. Because the terms of the agreement govern, the Commission agrees with Williams that implementation of this regulation is prospective only and will not change the terms of already negotiated capacity release transactions.
63. The Industrials maintain that the Commission should not eliminate NAESB standard 5.3.6 which establishes 8 a.m. CCT as the deadline for notification of a recall applicable to the Timely Nomination cycle (11:30 a.m.). The Industrials are concerned that the elimination of this provision will force all recalls into the intra-day cycles or will mean that recall timing will be left either to the contract between the releasing and replacement shipper or to individual tariff provisions. The Industrials further request that the Commission consider a timeline for notification of reputs (in which recalled capacity reverts to the replacement shipper after a recall ends), or request NAESB to consider this issue.
64. The Commission recognizes that a standard timeline for recall notification is needed and is referring this issue to NAESB for consideration of a new standard. In the interim while NAESB is considering a new standard, the Commission is permitting pipelines to continue to use the notification period in current standard 5.3.6 for the Timely Nomination cycle, and, as described earlier, has established an interim notification schedule for the other nomination cycles. NAESB also should consider whether a schedule or timeline for reput notification is necessary.
66. Dynegy and NGSA maintain that partial day recalls should not result in greater penalty exposure for shippers whose capacity has been recalled. As discussed earlier, the Commission in Order No. 587–G required pipelines to waive non-critical penalties for bumped interruptible shippers. Pipelines should apply the same waivers for gas bumped through partial day recalls.
68. NiSource seeks clarification that partial day recalls will not permit the releasing shipper recalling capacity to change to an alternate point and bump firm capacity that is already scheduled (by a third party) at that point. The recall only permits the releasing shipper to displace gas scheduled by the replacement shipper. The Commission agrees that partial day recalls will not give the recalling shipper any greater scheduling rights vis a vis third parties.
70. Dominion requests clarification that pipelines offering more nomination opportunities than the four standard
71. Pipelines are certainly free to provide for recalls at non-standard nomination periods. However, in implementing recalls during the interim period in which NAESB is considering standards, the Commission will require recalls to be processed only at the standard nomination periods; pipelines need not permit recalls at any non-standard nomination times. In considering standards for partial day recalls, NAESB should consider whether standards should be developed to permit recalls at certain non-standard nomination opportunities.
73. Dominion requests clarification that the final rule does not affect Dominion's settlement in its Order No. 637 proceeding in which it provides partial day recalls at certain nomination opportunities. For example, Dominion states that it currently does not permit recalls at the Intra-Day 1 cycle, although it does not object to permitting such recalls if required by the Commission.
74. All pipelines will be required to conform to the requirements of the Commission regulation, regardless of the terms of previous approved tariffs. The Commission is acting under section 5 of the Natural Gas Act in requiring pipelines to permit releasing shippers to use partial day recalls and is seeking to establish standards to apply to such recalls across the interstate grid. Accordingly, all pipelines with tariffs inconsistent with the Commission's regulation must comply with that regulation. Dominion, for instance, is required, as are the other pipelines, to permit recalls at the Intra-Day 1 cycle (to which it has no objection). Similarly, Dominion is required to permit recalls under the schedule established by the Commission in this rule for the interim period while NAESB is considering standards for partial day recalls, and will be required to comply with subsequent timeline NAESB develops and the Commission adopts.
76. EIP is concerned that partial day recalls are at odds with the NAESB standards requiring that all nominations be for daily quantities. EIP maintains that if partial day recalls are permitted for released capacity, pipelines should be permitted to sell their capacity for less than a full day as well.
77. EIP appears to be suggesting that a partial day recall refers to a sale of capacity for a time period of less than one day, whereas pipelines under the NAESB standards can only sell capacity for a full day's quantity. The Commission is not establishing different standards for pipeline capacity as compared to released capacity. As Gulf South explains in its comments, a partial day recall should not be viewed as a recall for a specific portion (number of hours) of a gas day. Rather, the recall is for a proportionate share of the total contract quantity. For example, if a capacity release is for a contract quantity of 2400 Dth, and the replacement shipper flowed 800 Dth during the first eight hours prior to recall, the releasing shipper would still have a contract quantity of 1600 Dth remaining on the contract for the remainder of the gas day. In the same way, pipelines can sell capacity at each of the intra-day nomination opportunities whenever capacity is available.
Office of Management and Budget Circular A–119 (§ 11) (February 10, 1998) provides that when a federal agency issues or revises a regulation containing a standard, the agency should publish a statement in the final rule identifying whether a voluntary consensus standard or a government-unique standard is being adopted. In this rulemaking, the Commission is issuing its own regulation and rescinding the incorporation by reference of NAESB standard 5.3.6 and part of 5.3.7, because the existing NAESB standard has not been revised to take into account changed circumstances, there is no longer consensus supporting this standard, and the existing standard fails to reflect Commission policy.
80. The Office of Management and Budget's (OMB) regulations in 5 CFR 1320.11 require that it approve certain reporting and recordkeeping requirements (collections of information) imposed by an agency. Upon approval of a collection of information, OMB will assign an OMB control number and an expiration date. Respondents subject to the filing requirements of this Rule will not be penalized for failing to respond to these collections of information unless the collections of information display a valid OMB control number.
81. The final rule will affect one existing data collection, FERC–545 “Gas Pipeline Rates: Rate Change (Non-Formal)” (OMB Control No. 1902–0154). The following burden estimates are related only to this rule and include the costs of complying with the tariff filing requirement. Since this final rule will be implemented in two phases, the number of responses per respondent has been increased from one, as proposed in the NOPR, to two because each respondent will need to make two tariff filings, one for phase one and one for phase two.
The cost per respondent is $4,276.00 (rounded off).
82. The Commission sought comments to comply with these requirements. Comments were received from twenty-eight entities. No comments addressed the reporting burden imposed by these requirements. The substantive issues raised by the commenters are addressed within the rule.
83. The Commission's regulations adopted in this rule are necessary to further the process begun in Order No. 587 of creating a more efficient and integrated pipeline grid by standardizing the business practices and electronic communication of interstate pipelines. Adoption of these regulations will update the Commission's regulations relating to business practices and provide greater flexibility for capacity holders on interstate pipelines by synchronizing the Commission's regulation of recalled capacity with its standards for intra-day nominations. The public also benefits by having greater competition across the pipeline grid as a result of firm capacity holders having increased flexibility in structuring their capacity release transactions.
84. The Commission has assured itself, by means of its internal review, that there is specific, objective support for the burden estimates associated with the information requirements. The information required in the Final Rule will help the Commission carry out its responsibilities under the Natural Gas Act and conforms to the Commission's plan for efficient information collection, communication, and management within the natural gas industry.
85. Interested persons may obtain information on the reporting requirements by contacting the following: Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426 [Attention: Michael Miller, Office of the Chief Information Officer, CI–1, (202) 208–1415, or mike.miller@ferc.fed.gov] or the Office of Management and Budget, Office of Information and Regulatory Affairs, Attention: Desk Officer for the Federal Energy Regulatory Commission, 725 17th Street, NW., Washington, DC 20503. The Desk Officer can also be reached at (202) 395–7318, or fax: (202) 395–7285.
87. The Commission is required to prepare an Environmental Assessment or an Environmental Impact Statement for any action that may have a significant adverse effect on the human environment.
89. The Regulatory Flexibility Act of 1980 (RFA)
91. In addition to publishing the full text of this document in the
92. From FERC's Home Page on the Internet, this information is available in both the Commission Issuance Posting System (CIPS) and the Records and Information Management System (RIMS).
93. User assistance is available for RIMS, CIPS, and the Website during normal business hours from our Help line at (202) 208–2222 (E-Mail to WebMaster@ferc.fed.us) or the Public Reference at (202) 208–1371 (E-Mail to
94. During normal business hours, documents can also be viewed and/or printed in FERC's Public Reference Room, where RIMS, CIPS, and the FERC Website are available. User assistance is also available.
96. As discussed herein, interstate pipelines are required, by May 1, 2002, to make tariff filings, to become effective by July 1, 2002, to comply with the requirement to implement recalls of scheduled and unscheduled capacity for the Timely and Evening Nomination cycles and for recalls of unscheduled capacity. Each tariff filing must include the tariff language set forth at P. 41.
97. By October 1, 2002, NAESB should file comments with the Commission detailing the standards NAESB has adopted relating to partial day recalls or, if none has been adopted, those that were considered, as well as all other material relevant to NAESB's consideration of the standards. Other industry members also can submit comments by October 1, 2002, and will have until October 15, 2002 to file additional comments on the NAESB report.
99. These regulations are effective April 17, 2002. The Commission has determined, with the concurrence of the Administrator of the Office of Information and Regulatory Affairs of OMB, that this rule is not a “major rule” as defined in section 351 of the Small Business Regulatory Enforcement Fairness Act of 1996.
Continental shelf, Incorporation by reference, Natural gas, Reporting and recordkeeping requirements.
By the Commission.
15 U.S.C. 717–717w, 3301–3432; 42 U.S.C. 7101–7532; 43 U.S.C. 1331–1356.
The revised and added text reads as follows:
(b) * * *
(1) * * *
(v) Capacity Release Related Standards (Version 1.4, August 31, 1999), with the exception of Standard 5.3.6 and the first sentence of Standard 5.3.7.
(c) * * *
(1) * * *
(ii) Capacity release scheduling.
(A) * * *
(B) A pipeline must permit releasing shippers, as a condition of a capacity release, to recall released capacity and renominate such recalled capacity at each nomination opportunity. Each replacement shipper must be provided with advance notice of such recall and must be notified whether penalties will apply on the day its volumes are reduced.
The following appendix will not appear in the Code of Federal Regulations.