Union Pacific Railroad Company (UP) has agreed to grant temporary overhead trackage rights to The Burlington Northern and Santa Fe Railway Company (BNSF) over UP's Dallas Subdivision lines between UP milepost 245.3 at Fort Worth, TX (East Tower 55), and UP milepost 214.6 at Dallas, TX (Terminal Junction), a distance of approximately 30.7 miles.
The transaction was scheduled to become effective on January 13, 2004, and the trackage rights are scheduled to expire on January 22, 2004. The purpose of the temporary trackage rights is to allow BNSF to bridge its train service while its main lines are out of service due to certain programmed track, roadbed, and structural maintenance.
As a condition to this exemption, any employees affected by the trackage rights will be protected by the conditions imposed in
This notice is filed under 49 CFR 1180.2(d)(8). If the notice contains false or misleading information, the exemption is void
An original and 10 copies of all pleadings, referring to STB Finance Docket No. 34456, must be filed with the Surface Transportation Board, 1925 K Street, NW., Washington, DC 20423–0001. In addition, a copy of each pleading must be served on Sarah W. Bailiff, 2500 Lou Menk Drive, P.O. Box 961039, Fort Worth, TX 76161–0039.
Board decisions and notices are available on our Web site at
By the Board, David M. Konschnik, Director, Office of Proceedings.