The U.S. Nuclear Regulatory Commission (the Commission) is considering the issuance of an order under 10 CFR 52.28, “Transfer of Early Site Permit,” 10 CFR 50.80, “Transfer of Licenses,” and 10 CFR 50.90, “Application for Amendment of License, Construction Permit, or Early Site Permit,” approving the direct transfer of the North Anna ESP Site Early Site Permit (ESP–003) currently held by Dominion Nuclear North Anna LLC (DNNA) as permit holder of ESP–003. The transfer would be to Virginia Electric and Power Company, doing business as Dominion Virginia Power (DVP), and Old Dominion Electric Cooperative (ODEC). The Commission is also considering amending the permit for administrative purposes to reflect the proposed transfer.
According to an application for approval filed by DNNA, DVP, and ODEC, DVP and ODEC would become the holders of the Early Site Permit following approval of the proposed permit transfer and would assume all rights, duties, and obligations of ESP–003.
The proposed amendment would delete references to DNNA, reflect DVP and ODEC as the permit holders, and delete certain provisions that are no longer applicable because they applied only to DNNA.
Pursuant to 10 CFR 52.28 and 10 CFR 50.80, no Early Site Permit, or any right thereunder, shall be transferred, directly or indirectly, through transfer of control of the ESP to any person, unless the Commission gives its consent in writing. The Commission will approve an application for the direct transfer of an Early Site Permit if the Commission determines that the proposed transferee is qualified to hold the permit and that the transfer is otherwise consistent with applicable provisions of law, regulations and orders issued by the Commission pursuant thereto.
Before issuance of the proposed conforming permit amendment, the Commission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations.
As provided in 10 CFR 2.1315(b), “[w]here administrative license amendments are necessary to reflect an approved transfer, such amendments will be included in the order that approves the transfer. Any challenge to the administrative license amendment is limited to the question of whether the license amendment accurately reflects the approved transfer.” In light of the generic determination reflected in 10 CFR 2.1315(b), only public comments with respect to whether the amendment accurately reflects the approved transfer are being solicited, notwithstanding the general comment procedures contained in 10 CFR 50.91.
Within 20 days from the date of publication of this notice, any person(s) whose interest may be affected by the Commission's action on the application may request a hearing and intervention via electronic submission through the NRC E-filing system. Requests for a hearing and petitions for leave to intervene should be filed in accordance with the Commission's rules of practice set forth in Subpart C “Rules of General Applicability: Hearing Requests, Petitions to Intervene, Availability of Documents, Selection of Specific Hearing Procedures, Presiding Officer Powers, and General Hearing Management for NRC Adjudicatory Hearings,” of 10 CFR Part 2. In particular, such requests and petitions must comply with the requirements set forth in 10 CFR 2.309. Untimely requests and petitions may be denied, as provided in 10 CFR 2.309(c)(1), unless good cause for failure to file on time is established. In addition, an untimely request or petition should address the factors that the Commission will also consider, in reviewing untimely requests or petitions, set forth in 10 CFR 2.309(c)(1)(i)–(viii).
All documents filed in NRC adjudicatory proceedings, including a request for hearing, a petition for leave to intervene, any motion or other document filed in the proceeding prior to the submission of a request for hearing or petition to intervene, and documents filed by interested governmental entities participating under 10 CFR 2.315(c), must be filed in accordance with the NRC E-Filing rule, which was promulgated by the NRC on August 28, 2007, (72 FR 49139). The E-Filing process requires participants to submit and serve all adjudicatory documents over the internet, or in some cases to mail copies on electronic storage media. Participants may not submit paper copies of their filings unless they seek an exemption in accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least five (5) days prior to the filing deadline, the petitioner/requestor must contact the Office of the Secretary by e-mail at
Once a petitioner/requestor has obtained a digital ID certificate, had a docket created, and downloaded the EIE viewer, it can then submit a request for hearing or petition for leave to intervene. Submissions should be in Portable Document Format (PDF) in accordance with NRC guidance available on the NRC public Web site at
A person filing electronically may seek assistance through the “Contact Us” link located on the NRC Web site at
Participants who believe that they have good cause for not submitting documents electronically must file an exemption request, in accordance with 10 CFR 2.302(g), with their initial paper filing requesting authorization to continue to submit documents in paper format. Such filings must be submitted by: (1) First-class mail addressed to the Office of the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001, Attention: Rulemaking and Adjudications Staff; or (2) courier, express mail, or expedited delivery service to the Office of the Secretary, Sixteenth Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852, Attention: Rulemaking and Adjudications Staff. Participants filing a document in this manner are responsible for serving the document on all other participants. Filing is considered complete by first-class mail as of the time of deposit in the mail, or by courier, express mail, or expedited delivery service upon depositing the document with the provider of the service.
Documents submitted in adjudicatory proceedings will appear in NRC's electronic hearing docket which is available to the public at
The Commission will issue a notice or order granting or denying a hearing request or intervention petition, designating the issues for any hearing that will be held and designating the Presiding Officer. A notice granting a hearing will be published in the
Within 30 days from the date of publication of this notice, persons may submit written comments regarding the permit transfer application, as provided for in 10 CFR 2.1305. The Commission will consider and, if appropriate, respond to these comments, but such comments will not otherwise constitute part of the decisional record. Comments are not subject to the E-Filing rule and should be submitted to the Secretary, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001, Attention: Rulemakings and Adjudications Staff, and should cite the publication date and page number of this
For further details with respect to this permit transfer application, see the application dated April 24, 2008, available for public inspection at the Commission's Public Document Room (PDR), located at One White Flint North, Public File Area O1 F21, 11555 Rockville Pike (first floor), Rockville, Maryland.
Publicly available records will be accessible electronically from the Agency wide Documents Access and Management System's (ADAMS) Public Electronic Reading Room on the Internet at the NRC Web site,
For the Nuclear Regulatory Commission.