On September 30, 2010, Magnolia Water LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of hydropower at the U.S. Army Corps of Engineers (Corps) Sardis Lake in Latimer County, Oklahoma. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners' express permission.
The proposed pumped storage project would consist of the following: (1) An 120-foot-high, 9,000-foot-long earth embankment dam creating; (2) an upper reservoir with a surface area of 85 acres and an 5,000 acre-foot storage capacity; (3) a 60-foot-high, 7,300-foot-long earth embankment dam creating; (4) a lower reservoir with a surface area of 200 acres and an 5,000 acre-foot storage capacity;
Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site
More information about this project, including a copy of the application, can be viewed or printed on the “eLibrary” link of the Commission's Web site at