On January 3, 2011, Northland Power Mississippi River LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of hydropower on the Mississippi River, near the town of North Vacherie, in St. James Parish, Louisiana. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners' express permission.
The proposed NPI 019 hydrokinetic project would consist of the following: (1) Up to 200 TREK generating units installed in a matrix on the bottom of the river; (2) the total capacity of the installation would be up to 50,000 kilowatts; (3) shielded underwater cables would convey each matrix power
Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site
More information about this project, including a copy of the application, can be viewed or printed on the “eLibrary” link of the Commission's Web site at