l. With this notice, we are designating Black Canyon as the Commission's non-federal representative for carrying out informal consultation pursuant to section 7 of the Endangered Species Act, section 305(b) of the Magnuson-Stevens Fishery Conservation and Management Act, and section 106 of the National Historic Preservation Act.
m. Black Canyon filed with the Commission a Pre-Application Document (PAD; including a proposed process plan and schedule), pursuant to 18 CFR 5.6 of the Commission's regulations.
n. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's Web site (
Register online at
o. With this notice, we are soliciting comments on the PAD and Commission staff's Scoping Document 1 (SD1), as well as study requests. All comments on the PAD and SD1, and study requests should be sent to the address above in paragraph h. In addition, all comments on the PAD and SD1, study requests, requests for cooperating agency status, and all communications to and from Commission staff related to the merits of the potential application must be filed with the Commission. Documents may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site
All filings with the Commission must include on the first page, the project name (Black Canyon Hydroelectric Project) and number (P–14110–001), and bear the appropriate heading: “Comments on Pre-Application Document,” “Study Requests,” “Comments on Scoping Document 1,” “Request for Cooperating Agency Status,” or “Communications to and from Commission Staff.” Any individual or entity interested in submitting study requests, commenting on the PAD or SD1, and any agency requesting cooperating status must do so by July 24, 2012.
p. We intend to prepare an environmental assessment (EA) for this project. The scoping meetings identified below satisfy the NEPA scoping requirements.
Commission staff will hold two scoping meetings in the vicinity of the project at the time and place noted below. The daytime meeting will focus on resource agency, Indian tribes, and non-governmental organization concerns, while the evening meeting is primarily for receiving input from the public. We invite all interested individuals, organizations, and agencies to attend one or both of the meetings, and to assist staff in identifying particular study needs, as well as the scope of environmental issues to be addressed in the environmental document. The times and locations of these meetings are as follows:
Scoping Document 1 (SD1), which outlines the subject areas to be addressed in the environmental document, was mailed to the individuals and entities on the Commission's mailing list. Copies of SD1 will be available at the scoping meetings, or may be viewed on the Web at
Black Canyon will conduct a virtual site review meeting for the proposed project on Tuesday, June 19, 2012, starting at 2:00 p.m. The virtual site review meeting will provide an overview of the proposed project area, including video, photos, and maps. The meeting will be held at the Cedar River Watershed Education Center Auditorium, 19901 Cedar Falls Road SE., North Bend, WA 98045. Anyone with questions about the virtual site review should contact Mr. Chris Spens (Black Canyon) at (360) 738–9999 or Brandon Cherry (FERC) at (202) 502–8328.
At the scoping meetings, staff will: (1) Initiate scoping of the issues; (2) review and discuss existing conditions and resource management objectives; (3) review and discuss existing information and identify preliminary information and study needs; (4) review and discuss the process plan and schedule for pre-filing activity that incorporates the time frames provided for in Part 5 of the Commission's regulations and, to the extent possible, maximizes coordination of federal, state, and tribal permitting and certification processes; and (5) discuss the appropriateness of any federal or state agency or Indian tribe acting as a cooperating agency for development of an environmental document.
Meeting participants should come prepared to discuss their issues and/or concerns. Please review the PAD in preparation for the scoping meetings. Directions on how to obtain a copy of the PAD and SD1 are included in item n. of this document.
The meetings will be recorded by a stenographer and will be placed in the public records of the project.