Coast Guard, DHS.
Notice of deviation from drawbridge regulation.
The Coast Guard is issuing a temporary deviation from the regulation governing the operation of the Southport SR27 Bridge across Townsend Gut, mile 0.7, between Boothbay Harbor and Southport, Maine. The bridge owner, Maine Department of Transportation, will be performing structural repairs at the bridge. This deviation allows the bridge to operate on a temporary schedule for eight weeks to facilitate scheduled bridge maintenance.
This deviation is effective from April 27, 2013 through June 28, 2013.
Documents mentioned in this preamble as being available in the docket are part of docket USCG–2013–0223 and are available online at
If you have questions on this deviation, call or email Mr. John McDonald, Project Officer, First Coast Guard District, telephone (617) 223–8364,
The Southport SR27 Bridge, across Townsend Gut, mile 0.7, between Boothbay Harbor and Southport, Maine,
The waterway is transited by recreational and commercial fishing boats. There is an alternate route for navigation around Southport.
The bridge owner, Maine Department of Transportation, requested a temporary deviation from the normal operating schedule to facilitate deck repairs at the bridge.
Under this temporary deviation, the Southport SR27 Bridge shall operate as follows: From April 27, 2013, through May 27, 2013, between 6 a.m. and 6 p.m., Monday through Friday, except holidays, the draw shall open on signal, every two hours, at 6 a.m., 8 a.m., 10 a.m., 12 p.m., 2 p.m., 4 p.m., and 6 p.m.
From May 28, 2013, through June 28, 2013, between 6 p.m. and 6 a.m., Monday through Friday, except holidays, the draw shall open on signal at 6 p.m., 8 p.m., 10 p.m., 2 a.m., and 6 a.m.
In accordance with 33 CFR 117.35(e), the bridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35.