Legal Status
This site displays a prototype of a “Web 2.0” version of the daily Federal Register. It is not an official legal edition of the Federal Register, and does not replace the official print version or the official electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal Register documents. Each document posted on the site includes a link to the corresponding official PDF file on govinfo.gov. This prototype edition of the daily Federal Register on FederalRegister.gov will remain an unofficial informational resource until the Administrative Committee of the Federal Register (ACFR) issues a regulation granting it official legal status. For complete information about, and access to, our official publications and services, go to About the Federal Register on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable regulatory information on FederalRegister.gov with the objective of establishing the XML-based Federal Register as an ACFR-sanctioned publication in the future. While every effort has been made to ensure that the material on FederalRegister.gov is accurately displayed, consistent with the official SGML-based PDF version on govinfo.gov, those relying on it for legal research should verify their results against an official edition of the Federal Register. Until the ACFR grants it official status, the XML rendition of the daily Federal Register on FederalRegister.gov does not provide legal notice to the public or judicial notice to the courts.
- Documents
- Public Inspection
-
Publication Date
-
Type
-
Section
-
Agency
-
Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area Power Administration Transmission Lines on National Forest System Lands, Colorado, Nebraska, and Utah (DOE/EIS-0442)
The Western Area Power Administration (WAPA) has determined that it will implement the proposed action, or Project, as described in the Reauthorization of Maintenance and Vegetation Management on Western Area Power Administration Transmission Lines on Forest Service Lands, Colorado, Nebraska, and Utah final environmental impact statement (Final...
-
Wildfire Risk Reduction, Reliability, and Asset Protection (WRAP) Project, Trinity County, California (DOE/EIS-0548)
The Western Area Power Administration (WAPA) and Trinity Public Utility District (Trinity PUD) are proposing a proactive Wildfire Risk Reduction, Reliability, and Asset Protection (WRAP) Project to reduce fire risk to the surrounding communities and public lands, as well as to increase electric reliability to maintain critical services in local...
-
Revision to Power Marketing Policy Kerr-Philpott System of Projects
Southeastern Power Administration (Southeastern or SEPA) announces revision to the power marketing policy for the Kerr-Philpott System of Projects (Kerr-Philpott System). The Kerr-Philpott System power marketing policy was published on July 29, 1985, and is reflected in contracts for the sale of system power, which are maintained in...
-
Agency Information Collection Extension
The Department of Energy (DOE) has submitted an information collection request to the OMB for extension under the provisions of the Paperwork Reduction Act of 1995. The information collection requests a three-year extension of Western Area Power Administration's (WAPA) Applicant Profile Data (APD), OMB Control Number 1910-5136. The proposed...
-
Central Arizona Project-Rate Order No. WAPA-193
The extension of existing Central Arizona Project (CAP) transmission service formula rates has been confirmed, approved, and placed into effect on an interim basis. The existing formula rates under Rate Schedules CAP-FT3, CAP-NFT3, and CAP-NITS3 were set to expire on December 31, 2020. This rate extension, which makes no change to the existing...
-
Pacific Northwest-Pacific Southwest Intertie Project-Rate Order No. WAPA-192
The extension of existing Pacific Northwest-Pacific Southwest Intertie Project transmission service rates has been confirmed, approved, and placed into effect on an interim basis. The existing transmission service rates under Rate Schedules INT-FT5 and INT-NFT4 were set to expire on September 30, 2020. This rate extension makes no change to the...
-
Boulder Canyon Project
The Assistant Secretary for Electricity confirms, approves, and places into effect on a final basis the Boulder Canyon Project (BCP) base charge and rates for fiscal year (FY) 2021 under Rate Schedule BCP-F10. The base charge decreased 1.5 percent from $66.4 million in FY 2020 to $65.4 million in FY 2021. The reduction is primarily the result of...
-
Notice of Interim Approval of Rate Schedules for Kerr-Philpott System
The Administrator for the Southeastern Power Administration (Southeastern) has confirmed and approved, on an interim basis, new rate schedules VA-1-D, VA-2-D, VA-3-D, VA-4-D, DEP-1-D, DEP-2-D, DEP-3- D, DEP-4-D, AP-1-D, AP-2-D, AP-3-D, AP-4-D, NC-1-D, and Replacement-2- C. These rate schedules are applicable to Southeastern power sold to...
-
Notice of Interim Approval of Rate Schedules for Cumberland System
The Administrator for the Southeastern Power Administration (Southeastern) has confirmed and approved, on an interim basis, new rate schedules CBR-1-J, CSI-1-J, CEK-1-J, CM-1-J, CC-1-K, CK-1-J, CTV- 1-J, CTVI-1-C, and Replacement-3. The rate schedules are approved on an interim basis through September 30, 2025, and are subject to confirmation...
-
Salt Lake City Area Integrated Projects and Colorado River Storage Project-Rate Order No. WAPA-190
The fixed rate for the Salt Lake City Area Integrated Projects (SLCA/IP) firm power rate, the formula rates for the Colorado River Storage Project (CRSP) transmission and ancillary services, and the new formula rate for CRSP sales of surplus products (collectively, Provisional Rates) have been confirmed, approved, and placed into effect on an...
-
Central Valley Project-Rate Order No. WAPA-194
Western Area Power Administration (WAPA) proposes new formula rates and revisions to the existing Energy Imbalance (EI) and Generator Imbalance (GI) rate schedules for the Central Valley Project (CVP). The new rates are associated with two events: Participation in the California Independent System Operator's (CAISO) Energy Imbalance Market (EIM)...