Skip to Content
Notice

Circular Welded Non-Alloy Steel Pipe from the Republic of Korea: Extension of Time Limit for Preliminary Results of the Antidumping Duty Administrative Review

 

Table of Contents Back to Top

FOR FURTHER INFORMATION CONTACT: Back to Top

Joseph Shuler at (202) 482-1293 or Shane Subler at (202) 482-0189; AD/CVD Operations, Office 1, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW., Washington, DC 20230.

SUPPLEMENTARY INFORMATION: Back to Top

Background Back to Top

On December 24, 2008, the Department published a notice of initiation of administrative review of the antidumping duty order on circular welded non-alloy steel pipe from the Republic of Korea, covering the period November 1, 2007 through October 31, 2008. See Initiation of Antidumping and Countervailing Duty Administrative Reviews and Request for Revocation in Part, 73 FR 79055 (December 24, 2008). The current deadline for the preliminary results of this administrative review is August 2, 2009.

Statutory Time Limits Back to Top

Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (“the Act”), requires the Department of Commerce (“the Department”) to issue the preliminary results of an administrative review within 245 days after the last day of the anniversary month of an order for which a review is requested and the final results of review within 120 days after the date on which the preliminary results are published. If it is not practicable to complete the review within the time period, section 751(a)(3)(A) of the Act allows the Department to extend these deadlines to a maximum of 365 days and 180 days, respectively.

Extension of Time Limit for Preliminary Results Back to Top

The Department requires additional time to review and analyze the sales and cost responses in this administrative review. In particular, one of the respondents in this case has never participated in an antidumping case with the Department, and we need additional time to review its sales and cost methodologies. Thus, it is not practicable to complete this review within the originally anticipated time limit (i.e., by August 2, 2009). Therefore, the Department is extending the time limit for completion of the preliminary results by 120 days to not later than November 30, 2009, in accordance with section 751(a)(3)(A) of the Act.

We are issuing and publishing this notice in accordance with sections 751(a)(3)(A) of the Act.

Dated: July 14, 2009.

John M. Andersen,

Acting Deputy Assistant Secretary for Antidumping and Countervailing Duty Operations.

[FR Doc. E9-17423 Filed 7-21-09; 8:45 am]

BILLING CODE 3510-DS-P

Site Feedback