Skip to Content

Riverbank Hydro No. 22, LLC; FFP Project 93, LLC; Notice Announcing Preliminary Permit Drawing


The Commission has received two preliminary permit applications deemed filed on September 1, 2011, at 8:30 a.m., [1] for proposed projects to be located at the U.S. Army Corps of Engineers' Green River Lock and Dam No. 5, on the Green River in Butler and Warren Counties, Kentucky. The applications were filed by Riverbank Hydro No. 22, LLC for Project No. 14269-000, and FFP Project 93, LLC for Project No. 14270-000.

On February 28, 2012, at 9 a.m. (eastern time), the Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants identified in this notice. The Commission will select among competing permit applications as provided in section 4.37 of its regulations. [2] The priority established by this drawing will be used to determine which applicant, among those with identical filing times, will be considered to have the first-filed application.

The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St. NE., Washington, DC 20426. A subsequent notice will be issued by the Secretary announcing the results of the drawing.

Dated: February 16, 2012.

Nathaniel J. Davis, Sr.,

Deputy Secretary.

[FR Doc. 2012-4191 Filed 2-22-12; 8:45 am]


Footnotes Back to Top

1. Under the Commission's Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2011).

Back to Context
Site Feedback