Skip to Content

Uncategorized Document

Tennessee Gas Pipeline Co.; Request Under Blanket Authorization March 2, 1994. Take notice that on February 25, 1994, Tennessee Gas Pipeline Company (Tennessee), P.O. Box 2511, Houston, Texas 77252, filed in Docket No. CP94-253-000 a request pursuant to Sections 157.205 and 157.212 of the Commission's Regulations under the Natural Gas Act (18 CFR 157.205) for authorization to replace an existing 3'' meter tube with a 4'' tube in order to more accurately measure the volumes received for the account of the City of Parsons, Tennessee, all as more fully set forth in the request that is on file with the Commission and open to public inspection. Tennessee states that it currently transports natural gas on a firm basis to the City of Parsons pursuant to a firm gas transportation agreement and that the current capacity being delivered exceeds the flow rate that can be accurately measured by the existing 3'' meter facility. Additionally, Tennessee states that in order to improve the measurement accuracy of this facility, it proposes to replace the existing meter tube with a 4'' meter tube at Meter No. 2-0055-1, the Parsons Sales station located in Decatur County, Tennessee. Tennessee states that the replacement of these facilities will not increase the contracted delivery quantity under this contract, that the facility will be located on an existing right-of-way that the cost of renovating this facility is estimated to be $9,000 which cost will be borne by Tennessee. Tennessee also states that it does not propose to increase or decrease the total daily and/or annual quantities it is authorized to deliver to the City of Parsons. Tennessee further states that the replacement of this existing meter is not prohibited by its currently effective tariff and that it has sufficient capacity to accomplish the deliveries without detriment or disadvantage to any of Tennessee's customers. Any person or the Commission's staff may, within 45 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to Section 157.205 of the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to the request. If no protest is filed within the time allowed therefor, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to Section 7 of the Natural Gas Act. Linwood A. Watson, Jr., Acting Secretary. [FR Doc. 94-5219 Filed 3-7-94; 8:45 am] BILLING CODE 6717-01-M

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Visit www.gpo.gov/fdsys or use the printed Federal Register if you need an official format.

The full text of this document is currently only available in a basic text format.