Legal Status
Legal Status
Notice
Hot-Rolled Lead and Bismuth Carbon Steel Products From Germany: Extension of Time Limit for Preliminary Results of Countervailing Duty Administrative Review
A Notice by the International Trade Administration on
Document Details
Information about this document as published in the Federal Register.
- Printed version:
- Publication Date:
- 11/19/1998
- Agencies:
- International Trade Administration
- Dates:
- November 19, 1998.
- Effective Date:
- 11/19/1998
- Document Type:
- Notice
- Document Citation:
- 63 FR 64235
- Page:
- 64235-64236 (2 pages)
- Agency/Docket Number:
- C-428-812
- Document Number:
- 98-30986
Document Details
-
Enhanced Content - Submit Public Comment
- This feature is not available for this document.
Enhanced Content - Submit Public Comment
-
Enhanced Content - Read Public Comments
- This feature is not available for this document.
Enhanced Content - Read Public Comments
-
Enhanced Content - Sharing
- Shorter Document URL
- https://www.federalregister.gov/d/98-30986 https://www.federalregister.gov/d/98-30986
Enhanced Content - Sharing
-
Enhanced Content - Developer Tools
This document is available in the following developer friendly formats:
More information and documentation can be found in our developer tools pages.
Enhanced Content - Developer Tools
Published Document
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
The full text of this document is currently available in PDF format.
The full text of this document is also available in a basic text format.