Skip to Content

Notice

Blackberry Valley Drum Site, Notice of Proposed Settlement

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Environmental Protection Agency.

ACTION:

Notice of proposed settlement.

SUMMARY:

The United States Environmental Protection Agency is proposing to enter into a settlement for the reimbursement of all past response costs with Greenville County pursuant to section 122 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), 42 U.S.C. 9622(h)(1) concerning the Blackberry Valley Drum Superfund Site (Site) located in Greenville, Greenville County, South Carolina. EPA will consider public comments on the proposed settlement for thirty (30) days. EPA may withdraw from or modify the proposed settlement should such comments disclose facts or considerations which indicate the proposed settlement is inappropriate, improper or inadequate. Copies of the proposed settlement are available from: Ms. Paula V. Batchelor, U.S. EPA, Region 4, (WMD-CPSB) 61 Forsyth Street, SW, Atlanta, Georgia 30303, (404) 562-8887.

Written comments may be submitted to Ms. Batchelor within 30 calendar days of the date of this publication.

Start Signature

Dated: March 31, 2000.

James T. Miller,

Acting Chief, CERCLA Program Services Branch, Waste Management Division.

End Signature End Preamble

[FR Doc. 00-9658 Filed 4-17-00; 8:45 am]

BILLING CODE 6560-50-P