Legal Status
Legal Status
Notice
Notice of Extension of Time Limit for Preliminary Results of New-Shipper Antidumping Review: Freshwater Crawfish Tail Meat From the People's Republic of China
A Notice by the International Trade Administration on
Document Details
Information about this document as published in the Federal Register.
- Printed version:
- Publication Date:
- 05/01/2000
- Agencies:
- International Trade Administration
- Dates:
- May 1, 2000.
- Effective Date:
- 05/01/2000
- Document Type:
- Notice
- Document Citation:
- 65 FR 25309
- Page:
- 25309 (1 page)
- Agency/Docket Number:
- A-570-848
- Document Number:
- 00-10807
Document Details
-
Enhanced Content - Table of Contents
This tables of contents is a navigational tool, processed from the headings within the legal text of Federal Register documents. This repetition of headings to form internal navigation links has no substantive legal effect.
Enhanced Content - Table of Contents
-
Enhanced Content - Submit Public Comment
- This feature is not available for this document.
Enhanced Content - Submit Public Comment
-
Enhanced Content - Read Public Comments
- This feature is not available for this document.
Enhanced Content - Read Public Comments
-
Enhanced Content - Sharing
- Shorter Document URL
- https://www.federalregister.gov/d/00-10807 https://www.federalregister.gov/d/00-10807
Enhanced Content - Sharing
-
Enhanced Content - Document Tools
These tools are designed to help you understand the official document better and aid in comparing the online edition to the print edition.
-
These markup elements allow the user to see how the document follows the Document Drafting Handbook that agencies use to create their documents. These can be useful for better understanding how a document is structured but are not part of the published document itself.
Display Non-Printed Markup Elements
Enhanced Content - Document Tools
-
-
Enhanced Content - Developer Tools
This document is available in the following developer friendly formats:
- JSON: Normalized attributes and metadata
- XML: Original full text XML
- MODS: Government Publishing Office metadata
More information and documentation can be found in our developer tools pages.
Enhanced Content - Developer Tools
Published Document
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Import Administration, International Trade Administration, Department of Commerce.
EFFECTIVE DATE:
May 1, 2000.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Sarah Ellerman or Maureen Flannery, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, N.W., Washington, D.C. 20230; telephone: (202) 482-4106 and (202) 482-3020, respectively.
The Applicable Statute
Unless otherwise indicated, all citations to the Tariff Act of 1930, as amended (the Act) are to the provisions effective January 1, 1995, the effective date of the amendments made to the Act by the Uruguay Round Agreements Act. In addition, unless otherwise indicated, all citations to the Department's regulations are to 19 CFR part 351 (1999).
Background
On March 30, 1999,the Department received a request from Yancheng Haiteng Aquatic Products & Foods Co., Ltd. to conduct a new shipper review of the antidumping duty order on freshwater crawfish tail meat from the People's Republic of China. On May 6, 1999, the Department published its initiation of this new shipper review covering the period of September 1, 1998 through February 28, 1999 (64 FR 24328). On March 15, 2000, the Department published the preliminary results of review (65 FR 13939).
Extension of Time Limits for Final Results
Because of the complexities enumerated in the Memorandum from Edward C. Yang to Joseph A. Spetrini, Extension of Time Limit for the Final Results of New Shipper Review of Freshwater Crawfish Tail Meat from the People's Republic of China, dated April 7, 2000, we find this review to be extraordinarily complicated and thus are unable to complete these reviews within the time limits mandated by section 351.214(i)(2) of the Department's regulations.
Therefore, in accordance with section 351.214(i)(2) of the Department's regulations, the Department is extending the time period for issuing the final results of review until June 23, 2000.
Start SignatureDated: April 7, 2000.
Joseph A. Spetrini,
Deputy Assistant Secretary, AD/CVD Enforcement Group III.
[FR Doc. 00-10807 Filed 4-28-00; 8:45 am]
BILLING CODE 3510-DS-P