Skip to Content

Notice

Circular Welded Non-Alloy Steel Pipe From Mexico: Extension of Time Limit for Preliminary Results of Antidumping Duty Administrative Review

Document Details

Information about this document as published in the Federal Register.

Document Statistics
Document page views are updated periodically throughout the day and are cumulative counts for this document including its time on Public Inspection. Counts are subject to sampling, reprocessing and revision (up or down) throughout the day.
Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

EFFECTIVE DATE:

August 11, 2000.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

John Drury at (202) 482-0195 or Linda Ludwig at (202) 482-3833, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Ave, NW, Washington, DC 20230.

Time Limits

Statutory Time Limits

Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (the Act), requires the Department to make a preliminary determination within 245 days after the last day of the anniversary month of an order/finding for which a review is requested and a final determination within 120 days after the date on which the preliminary determination is published. However, if it is not practicable to complete the review within these time periods, section 751(a)(3)(A) of the Act allows the Department to extend the time limit for the preliminary determination to a maximum of 365 days and for the final determination to 180 days (or 300 days if the Department does not extend the time limit for the preliminary determination) from the date of publication of the preliminary determination.

Background

On December 28, 1999, the Department published a notice of initiation of administrative review of the antidumping duty order on Circular Welded Non-Alloy Steel Pipe from Mexico, covering the period November 1, 1998 through October 31, 1999 (64 FR 72644). The preliminary results are currently due no later than August 1, 2000.

Extension of Time Limit for Preliminary Results of Review

We determine that it is not practicable to complete the preliminary results of this review within the original time limit. Therefore the Department is extending the time limit for completion of the preliminary results until no later than November 29, 2000. See Decision Memorandum from Richard O. Weible to Joseph A. Spetrini, dated August 1, 2000, which is on file in the Central Records Unit, Room B-099 of the main Commerce building. We intend to issue the final results no later than 120 days after the publication of the preliminary results notice.

This extension is in accordance with section 751(a)(3)(A) of the Act.

Start Signature

Dated: August 1, 2000.

Richard O. Weible,

Acting Deputy Assistant Secretary, AD/CVD Enforcement Group III.

End Signature End Further Info End Preamble

[FR Doc. 00-20442 Filed 8-10-00; 8:45 am]

BILLING CODE 3510-DS-P