Skip to Content

Notice

Silicon Metal From Brazil: Extension of Time Limit for Final Results of Antidumping Duty Administrative Review

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

EFFECTIVE DATE:

November 2, 2000.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Nova Daly or Ron Trentham, AD/CVD Enforcement, Office 4, Group II, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW., Washington, DC 20230; (202) 482-0989 and (202) 482-6320, respectively.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

Statutory Time Limits

Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (the Act), requires the Department of Commerce (the Department) to make a preliminary determination within 245 days after the last day of the anniversary month of an order/finding for which a review is requested and a final determination within 120 days after the date on which the preliminary determination is published. However, if it is not practicable to complete the review within the time period, section 751(a)(3)(A) of the Act allows the Department to extend the time limit for the preliminary determination to a maximum of 365 days and for the final determination to 180 days (or 300 days Start Printed Page 65835if the Department does not extend the time limit for the preliminary determination) from the date of publication of the preliminary determination.

Background

On August 30, 1999, the Department published a notice of initiation of administrative review of the antidumping duty order on Silicon Metal from Brazil covering the period July 1, 1998, through June 30, 1999, (64 FR 47167). On August 4, 2000, (65 FR 47960), we published the preliminary results of review. In our notice of preliminary results, we stated our intention to issue the final results of this review no later than 120 days after the date of publication of the preliminary results, December 2, 2000.

Extension of Final Results of Review

We determine that it is not practicable to complete the final results of this review within the original time limit. Therefore, the Department is extending the time limit for completion of the final results until no later than January 31, 2000. See Decision Memorandum from Thomas F. Futtner to Holly A. Kuga, dated concurrently with this notice, which is on file in the Central Records Unit, Room B-099 of the main Commerce Building.

This extension is in accordance with section 751(a)(3)(A) of the Act.

Start Signature

Dated: October 20, 2000.

Holly A. Kuga,

Acting Deputy Assistant Secretary for Import Administration, Group II.

End Signature End Supplemental Information

[FR Doc. 00-28191 Filed 11-1-00; 8:45 am]

BILLING CODE 3510-DS-P