Skip to Content


Extension of Time for Notice of Transfer of Licenses and Soliciting Comments, Motions To Intervene, and Protests

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble November 9, 2000.

In light of requests in recent filings for an extension of time to comment regarding the above-captioned proceeding, the Commission hereby extends the comment date 45 days.

Take notice that the following application has been filed with the Commission and is available for public inspection:

a. Application Type: Transfer of Licenses.

b. Project Nos: 2894-005, 9184-006, and 9185-005.

c. Date Filed: August 16, 2000.

d. Applicants: Northwestern Wisconsin Electric Company (transferor) and Flambeau Hydro, LLC (transferee).

e. Name and Location of Projects: The Black Brook Dam Project is on the Apple River in Polk County, Wisconsin. The Danbury Dam Project is on the Yellow River and the Clam River Dam Project is on the Clam River, both in Burnett County, Wisconsin. The projects do not occupy federal or tribal lands.

f. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).

g. Applicant Contacts: Mr. Mark F. Dahlberg, Northwestern Wisconsin Electric Company, P.O. Box 9, Grantsburg, WI 54840-0009, (715) 463-Start Printed Page 693035371 and Mr. Donald H. Clarke, Wilkinson Barker Knauer, LLP, 2300 N Street NW, No. 700, Washington, DC 20037, (202) 783-4141.

h. FERC Contact: Any questions on this notice should be addressed to James Hunter at (202) 219-2839.

i. Deadline for filing comments and or motions: November 27, 2000.

All documents (original and eight copies) should be filed with: David P. Boergers, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE, Washington DC 20426. Comments and protests may be filed electronically via the internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's web site at​efi/​doorbell.htm.

Please include the noted project numbers on any comments or motions filed.

j. Description of Proposal: The applicants state that the transfer will assure the continued operation of these hydroelectric projects and will effect the desired change of ownership of the generating facilities consistent with the restructuring plans of these members of the electric industry.

k. Locations of the application: A copy of the application is available for inspection and reproduction at the Commission's Public Reference Room, located at 888 First Street, NE, Room 2A, Washington, DC 20426, or by calling (202) 208-1371. The application may be viewed on the web at​online/​rims.htm (Call (202) 208-2222 for assistance). A copy is also available for inspection and reproduction at the addresses in item g above.

l. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission.

Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.

Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title “COMMENTS”, “RECOMMENDATIONS FOR TERMS AND CONDITIONS”, “PROTEST”, or “MOTION TO INTERVENE” as applicable, and the Project Number of the particular application to which the filing refers. Any of the above-named documents must be filed by providing the original and the number of copies provided by the Commission's regulations to: The Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application.

Agency Comments—Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency's comments must also be sent to the Applicant's representatives.

Start Signature

Linwood A. Watson, Jr.,

Acting Secretary.

End Signature End Preamble

[FR Doc. 00-29351 Filed 11-15-00; 8:45 am]