Skip to Content

Notice

Glen Canyon Adaptive Management Work Group (AMWG) and Glen Canyon Technical Work Group (TWG); Correction

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Bureau of Reclamation, Interior.

ACTION:

Notice of Public Meetings; Correction.

SUMMARY:

The Bureau of Reclamation published a notice of public meetings in the Federal Register of October 19, 2000 (65 FR 62750), concerning meetings of the Glen Canyon Adaptive Management Work Group (AMWG) and Glen Canyon Technical Work Group (TWG). The document contained incorrect dates.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Randall Peterson, telephone (801) 524-3758; faxogram (801) 524-3858; E-mail at: rpeterson@uc.usbr.gov

Correction

In the Federal Register of October 19, 2000, in the FR Doc. 00-26934, on page 62750, in the first column, correct the “Dates and Location” caption to read:

End Further Info

DATES AND LOCATION:

The AMWG will conduct two public meetings as follows:

Phoenix, Arizona—January 11-12, 2001. The meeting will begin at 9:30 a.m. and conclude at 4:00 p.m. on the first day and begin at 8 a.m. and conclude at 12 noon on the second day. The meeting will be held at the Bureau of Indian Affairs—Western Regional Office, 2 Arizona Center, Conference Rooms A and B (12th Floor), 400 North 5th Street, Phoenix, Arizona.

Start Signature

Dated: November 15, 2000.

Eluid L. Martinez,

Commissioner, Bureau of Reclamation.

End Signature End Preamble

[FR Doc. 00-29657 Filed 11-17-00; 8:45 am]

BILLING CODE 4310-MN-P