This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
Pipeline Safety: Pipeline Integrity Management in High Consequence Areas (Natural Gas Pipelines) and Communications (Natural Gas and Hazardous Liquid Pipelines)
The public meeting will be on February 12, 2001, from 9 a.m. to 4 p.m., February 13, 2001, from 9 a.m. to 4 p.m., and February 14, 2001, from 9 a.m. to 12 noon, at the Crystal City Marriott.
Table of Contents
Enhanced Content - Table of Contents
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Notice of public meeting and request for comments.
Pipeline Safety: Pipeline Integrity Management in High Consequence Areas (Natural Gas Pipelines) and Communications (Natural Gas and Hazardous Liquid Pipelines)
Notice of public meeting and request for comments.
Pipeline Safety: Pipeline Integrity Management in High Consequence Areas (Natural Gas Pipelines) and Communications (Natural Gas and Hazardous Liquid Pipelines)
Push the sunroof close switch and position an occupant to create the risk of sunroof entrapment. All of these actions must occur within one 60 second time frame.
Notice of public meeting and request for comments.
Pipeline Safety: Pipeline Integrity Management in High Consequence Areas (Natural Gas Pipelines) and Communications (Natural Gas and Hazardous Liquid Pipelines)
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
55
as of
10/08/2026 at 4:15 pm EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Office of Pipeline Safety, Research and Special Programs Administration, DOT.
ACTION:
Notice of public meeting and request for comments.
SUMMARY:
This notice announces a three-day public meeting. Day 1 will feature reports on the status of industry and government activities on how to improve the integrity of natural gas pipelines. On Day 2, the Integrity Management Communications Work Group will report its status and presentations from members of the public and will further explore communication needs and options. On Day 3, meeting attendees are invited to participate in in-depth discussions on the integrity of natural gas pipelines. This meeting is a continuation of the integrity project begun at a November 18, 1999, public meeting held in Herndon, VA. Since that meeting, OPS has initiated rulemakings requiring hazardous liquid pipeline operators to assess the integrity of pipeline segments that, in the event of a leak or failure, could affect high consequence areas. In anticipation of similar rulemakings applying to natural gas pipelines, OPS has been meeting with representatives of the natural gas pipeline industry, research institutions, and State pipeline safety agencies to understand how integrity management principles can best be applied to improve safety in the gas pipeline industry. OPS has also been exploring communication requirements for all pipeline operators to share information with community and State officials and the public about risks from pipelines, how pipeline risks can be managed and controlled, and how we know the pipelines are being operated safely. This three-day public meeting will present, to the widest possible audience, the results of all analyses and discussions to date, identify issues, and obtain public comment.
DATES:
The public meeting will be on February 12, 2001, from 9 a.m. to 4 p.m., February 13, 2001, from 9 a.m. to 4 p.m., and February 14, 2001, from 9 a.m. to 12 noon, at the Crystal City Marriott.
ADDRESSES:
(1)
Meeting Address:
Crystal City Marriott, 1999 Jefferson Davis Highway, Arlington, VA, 22202, 703-413-5500. Rooms may be reserved within a block identified as “Department of Transportation Integrity Management Meetings”. (2)
Address for Written Comments:
OPS requests that comments relating to the public meeting be submitted on or before January 29, 2001, so they can be considered as the meeting agenda is being developed. Submit written comments by mail or delivery to the Dockets Facility, U.S. Department of Transportation, Room PL-401, 400 Seventh Street, SW., Washington, DC 20590-0001. You also may submit written comments to the docket electronically. To do so, log on to the dms.dot.gov. Click on “Help & Information” for instructions on how to file a document electronically. Written comments should identify the appropriate docket RSPA-00-7666 for integrity management for gas pipelines and RSPA-00-7408 for communications. Anyone desiring confirmation of mailed comments must include a self-addressed stamped postcard. The Dockets Facility is located on the plaza level, Room PL-401, of the US Department of Transportation, 400 Seventh Street, SW., Washington, DC 20590. It is open from 10 a.m. to 5 p.m., Monday through Friday, except federal holidays.
If you want to make an oral presentation at the meeting, please notify Jenny Donohue no later than January 29, 2001, by phone (202-366-4046) or by Internet e-mail (jenny.donohue@rspa.dot.gov).
OPS's integrity management and communication initiatives are the culmination of experience gained from pipeline inspections, accident investigations and risk management and system integrity initiatives. These initiatives are intended to improve safety and environmental protection and to provide better assurance to the public about the safety of pipelines. They are also intended to comprehensively address National Transportation Safety Board (NTSB) recommendations, Congressional mandates and pipeline safety and environmental issues raised over the years.
( printed page 849)
OPS is issuing integrity management program requirements in several steps. Because natural gas and hazardous liquids have different physical properties, pose different risks, and the configuration of the systems differ, and because OPS already possessed sufficient information about integrity management practices on hazardous liquid pipelines, OPS began the series of rules by issuing requirements pertaining to hazardous liquid operators. A final rule applying to hazardous liquid operators with 500 or more miles of pipeline was issued November 3, 2000, (65 FR 75378). This rule applies to pipelines that can affect high consequence areas (HCAs), which include populated areas defined by the Census Bureau as urbanized areas or places, unusually sensitive environmental areas, and commercially navigable waterways. A notice of proposed rulemaking applying to hazardous liquid operators with fewer than 500 miles of pipeline will be issued soon.
Day 1: Integrity Management Concepts for Gas Pipelines
OPS has been meeting with representatives of the gas pipeline industry, research institutions, and State pipeline safety agencies to gather the information needed for rulemakings pertaining to gas operators. Since January 2000, there have been nine meetings with State agencies, representatives of the Interstate Natural Gas Association of America (INGAA), the American Gas Association (AGA), Battelle Memorial Institute, the Gas Technology Institute (GTI), Hartford Steam Boiler Inspection and Insurance Company, and operators covered under 49 CFR part 192. (See DOT Docket #7666 for summaries of the meetings.) The purpose of these meetings was to develop integrity management concepts that could most effectively be applied to gas transmission pipelines. At the meetings, industry representatives presented their perspectives on a number of issues relating to integrity management. Presentations on each of these subject areas will be included in the public meeting agenda. They include:
Considerations for defining HCAs affected by gas pipelines
Evaluation of design factors currently used for gas transmission pipelines
Evaluation of performance history and experience with the impact zone in gas transmission failures
Integrity management best practices and relationship between incident causes and industry practices
Options for various forms of direct assessment of the integrity of gas pipelines; their costs and effectiveness
Basis for establishing test intervals
Appropriateness of distinguishing between pipelines on basis of pressure
Status of research activities
Status of development of new national consensus standards
Day 2: Communications With the Public
Because communications with the public is an important part of a pipeline integrity management program, OPS is examining the need for standards for how operators are to communicate with State and local officials and the public about results of risk assessment processes and measures to prevent and mitigate damage to pipelines in case of a failure. OPS seeks comment on how State and local officials and the public could use and benefit from risk assessment information, how the consequences of potential pipeline failures should be characterized, how risk control actions should be described, and what operational information would be meaningful. To provide OPS input on both the content and optimal delivery of pipeline information, OPS formed the Integrity Management Communications Work Group. This nine-member group includes balanced representation of government, industry, and public interest stakeholders. At the public meeting, the Work Group will report the status of its discussions on the following topics:
Proposed information to be communicated
Expected utility of that information to the end user
Feasibility of collecting/reporting that information
Summary of any issues or debates concerning public access to that information
Presentations from members of the public will further explore communication needs and options.
Day 3: In-Depth Integrity Management Discussions
To ensure full consideration of all issues relating to gas pipeline integrity, attendees are invited to participate in a more in-depth and interactive treatment of topics raised on Day 1. These unstructured discussions will utilize an informal roundtable format.
Issued in Washington, DC, on December 28, 2000.
John Hess,
Acting Associate Administrator for Pipeline Safety.