Skip to Content

Rule

Drawbridge Operation Regulations; Brorein Street Bridge, across the Hillsborough River, Tampa, FL

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Coast Guard, DOT.

ACTION:

Notice of temporary deviation from regulations.

SUMMARY:

The Commander, Seventh Coast Guard District, has approved a temporary deviation from the regulations governing the operation of the Brorein Street Bridge across the Hillsborough River, mile 0.16, Tampa, Florida. This deviation allows the drawbridge to remain closed to navigation for five days. This temporary deviation is required to allow the bridge owner to safely complete repairs to the bridge.

DATES:

This deviation is effective from April 30, 2001 to May 4, 2001.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Mr. Barry Dragon, Chief, Operations Section, Seventh Coast Guard District, Bridge Section at (305) 415-6743.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

The Brorein Street Bridge across the Hillsborough River at Tampa, has a vertical clearance of 15 feet above mean high water (MHW) measured at the fenders in the closed position with a horizontal clearance of 80 feet. On March 23, 2001, Acutec, Inc., acting as an agent for the drawbridge owner, requested a deviation from the current operating regulation in 33 CFR 117.291(a) which requires the drawbridge to open on signal if at least two hours notice is given. This temporary deviation was requested to allow the bridge owner to safely disassemble the span lock system in a critical time sensitive manner.

The District Commander has granted a temporary deviation from the operating requirements listed in 33 CFR 117.291(a) for the purpose of repair completion of the drawbridge. Under this deviation, the Brorein Street Bridge need not open from 7 a.m. April 30, 2001 until 12 p.m. May 4, 2001.

Start Signature

Dated: April 4, 2001.

Greg E. Shapley,

Chief, Bridge Administration, Seventh Coast Guard District.

End Signature End Supplemental Information

[FR Doc. 01-9711 Filed 4-18-01; 8:45 am]

BILLING CODE 4910-15-P