Skip to Content

Rule

Drawbridge Operation Regulations; Mullica River

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Coast Guard, DOT.

ACTION:

Notice of temporary deviation from regulations.

SUMMARY:

The Commander, Fifth Coast Guard District has approved a temporary deviation from the regulations governing the operation of the Green Bank Drawbridge across the Mullica River, mile 18.0, Green Bank, New Jersey. The bridge owner may close the draw for needed repairs with limited vertical navigation clearance beneath the bridge, starting June 18, 2001, through June 27, 2001, working nights if Start Printed Page 33471required. This deviation to the regulation is necessary to allow the contractor to repair the superstructure and the bascule.

DATES:

This deviation is effective from June 18, 2001 through June 27, 2001.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Ann B. Deaton, Bridge Administrator, Fifth Coast Guard District, Bridge Section at (757) 398-6222.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

IEW Construction Group, a contractor for the New Jersey Department of Transportation requested the Coast Guard to approve a temporary deviation from the normal operation of the bridge in order to accommodate repairs. The repairs involve refurbishing the superstructure with extensive repairs to the bascule. Presently, the draw is required to operate under the operating regulations in 33 CFR 117.731a. To facilitate the repair of the bascule span, it will remain in the closed position during the period this deviation is in effect.

In accordance with 33 CFR 117.35, the District Commander granted a temporary deviation from the governing regulations in a letter dated May 17, 2001. A Local Notice to Mariners and a Broadcast Notice were sent out, so marine vessels could arrange their transits to minimize any impacts caused by the temporary deviation.

The temporary deviation allows the Green Bank Drawbridge across the Mullica River, mile 18.0, in Green Bank, New Jersey to remain closed for 10 consecutive days beginning June 18, 2001 through June 27, 2001.

Start Signature

Dated: June 11, 2001.

John E. Shkor,

Vice Admiral, U.S. Coast Guard, Commander, Fifth Coast Guard District.

End Signature End Supplemental Information

[FR Doc. 01-15659 Filed 6-21-01; 8:45 am]

BILLING CODE 4910-15-P