Legal Status
Legal Status
Notice
Certain Steel Concrete Reinforcing Bars from Turkey; Notice of Extension of Time Limit for Preliminary Results in Antidumping Duty Administrative Review
A Notice by the International Trade Administration on
Document Details
Information about this document as published in the Federal Register.
- Printed version:
- Publication Date:
- 12/05/2001
- Agencies:
- International Trade Administration
- Dates:
- December 5, 2001.
- Effective Date:
- 12/05/2001
- Document Type:
- Notice
- Document Citation:
- 66 FR 63218
- Page:
- 63218 (1 page)
- Agency/Docket Number:
- A-489-807
- Document Number:
- 01-30168
Document Details
-
Enhanced Content - Table of Contents
This tables of contents is a navigational tool, processed from the headings within the legal text of Federal Register documents. This repetition of headings to form internal navigation links has no substantive legal effect.
Enhanced Content - Table of Contents
-
Enhanced Content - Submit Public Comment
- This feature is not available for this document.
Enhanced Content - Submit Public Comment
-
Enhanced Content - Read Public Comments
- This feature is not available for this document.
Enhanced Content - Read Public Comments
-
Enhanced Content - Sharing
- Shorter Document URL
- https://www.federalregister.gov/d/01-30168 https://www.federalregister.gov/d/01-30168
Enhanced Content - Sharing
-
Enhanced Content - Document Tools
These tools are designed to help you understand the official document better and aid in comparing the online edition to the print edition.
-
These markup elements allow the user to see how the document follows the Document Drafting Handbook that agencies use to create their documents. These can be useful for better understanding how a document is structured but are not part of the published document itself.
Display Non-Printed Markup Elements
Enhanced Content - Document Tools
-
-
Enhanced Content - Developer Tools
This document is available in the following developer friendly formats:
- JSON: Normalized attributes and metadata
- XML: Original full text XML
- MODS: Government Publishing Office metadata
More information and documentation can be found in our developer tools pages.
Enhanced Content - Developer Tools
Published Document
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Import Administration, International Trade Administration, Department of Commerce.
EFFECTIVE DATE:
December 5, 2001.
SUMMARY:
The Department of Commerce is extending the time limit for completion of the preliminary results of the administrative review of the antidumping duty order on certain steel concrete reinforcing bars from Turkey. The period of review is April 1, 2000, through March 31, 2001.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Irina Itkin or Elizabeth Eastwood at (202) 482-0656 or (202) 482-3874, respectively, Office of AD/CVD Enforcement, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW., Washington, DC 20230.
Applicable Statute and Regulations
Unless otherwise indicated, all citations to the Tariff Act of 1930, as amended (the Act), are references to the provisions effective January 1, 1995, the effective date of the amendments made to the Act by the Uruguay Round Agreements Act. In addition, unless otherwise indicated, all citations to the Department of Commerce's (the Department's) regulations are to 19 CFR part 351 (2001).
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
On May 23, 2001, the Department published a notice of initiation of administrative review of the antidumping duty order on certain steel concrete reinforcing bars from Turkey. The period of review is April 1, 2000, through March 31, 2001. The review covers three producers/exporters of the subject merchandise to the United States.
Pursuant to section 751(a)(3)(A) of the Act, the Department shall make a preliminary determination in an administrative review of an antidumping order within 245 days after the last day of the anniversary month of the date of publication of the order. The Act further provides, however, that the Department may extend the 245-day period to 365 days if it determines it is not practicable to complete the review within the foregoing time period. Because it is not practicable to complete this administrative review within the time limit mandated by section 751(a)(3)(A) of the Act, the Department is extending the time limit for completion of the preliminary results. This review involves a number of complicated issues including high inflation in Turkey during the period of review. Because we need additional time for our analysis, we have extended the deadline until April 30, 2002.
This extension is in accordance with section 751(a)(3)(A) of the Act (19 U.S.C. 1675(a)(3)(A)) and 19 CFR 351.213(h)(2).
Start SignatureDated: November 29, 2001.
Richard W. Moreland,
Deputy Assistant Secretary for Import Administration.
[FR Doc. 01-30168 Filed 12-4-01; 8:45 am]
BILLING CODE 3510-DS-P