Skip to Content

Notice

Porcelain-on-Steel Cookware from Mexico: Notice of Extension of Time Limit for Antidumping Duty Administrative Review

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Import Administration, International Trade Administration, United States Department of Commerce.

EFFECTIVE DATE:

March 14, 2002.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Kate Johnson or Rebecca Trainor at (202) 482-4929 or (202) 482-4007, respectively, Office of AD/CVD Enforcement, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, N.W., Washington, D.C., 20230.

End Further Info

POSTPONEMENT OF FINAL RESULTS OF ADMINISTRATIVE REVIEW:

The Department of Commerce (“the Department”) published the preliminary results of the administrative review of the antidumping duty order on Porcelain-on-Steel Cookware from Mexico on November 13, 2001 (66 FR 56799). The current deadline for the final results in this review is March 13, 2002. In accordance with section 751(a)(3)(A) of the Tariff Act of 1930 (“the Act”), as amended, the Department finds that it is not practicable to complete this administrative review within the original time frame because it is conducting a changed-circumstances antidumping duty administrative review in which it is considering revoking the order on porcelain-on-steel cookware from Mexico and rescinding this administrative review. Thus, the Department is extending the time limit for completion of the final results until May 12, 2002, which is 180 days after the date on which notice of the preliminary results was published in the Federal Register.

Start Signature

March 8, 2002

Richard W. Moreland,

Deputy Assistant Secretary for Import Administration.

End Signature End Preamble

[FR Doc. 02-6174 Filed 3-13-02; 8:45 am]

BILLING CODE 3510-DS-S