Skip to Content

Notice

Office of Fossil Energy; Notice of Filings of Coal Capability Powerplant and Industrial Fuel Use Act

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Office of Fossil Energy.

ACTION:

Notice of filings.

SUMMARY:

The owners/operators of 7 baseload electric powerplants have submitted coal capability self-certifications pursuant to section 201 of the Powerplant and Industrial Fuel Use Act of 1978, as amended, in accordance with 10 CFR 501.60, 61.

ADDRESSES:

Copies of self-certification filings are available for public inspection, upon request, in the Office of Coal & Power Import/Export, Fossil Energy, Room 4G-039, FE-27, Forrestal Building, 1000 Independence Avenue, SW., Washington, DC 20585.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Ellen Russell at (202) 586-9624.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

Title II of the Powerplant and Industrial Fuel Use Act of 1978 (FUA), as amended (42 Start Printed Page 21231U.S.C. 8301 et seq.), provides that no new baseload electric powerplant may be constructed or operated without the capability to use coal or another alternate fuel as a primary energy source. In order to meet the requirement of coal capability, the owner or operator of such facilities proposing to use natural gas or petroleum as its primary energy source shall certify, pursuant to FUA section 201(d), to the Secretary of Energy prior to construction, or prior to operation as a base load electric powerplant, that such powerplant has the capability to use coal or another alternate fuel. Such certification establishes compliance with section 201(a) as of the date filed with the Department of Energy (DOE). The Secretary is required to publish a notice in the Federal Register that a certification has been filed. The following owners/operators of proposed new baseload electric powerplants have filed self-certifications pursuant to section 201(d) and in accordance with DOE regulations in 10 C.F.R. 501.60, 61.

Owner/operatorCapacityPlant locationIn-service date
Migrant Zeeland, LLC550 MWZeeland, MIJuly 1, 2002.
Duke Energy Fayette, LLC620 MWMasontown, PAJune 1, 2003.
Hermiston Power Partnership617 MWHermiston, OregonJune 2002.
Duke Energy Washington, LLC620 MWBeverly, OhioJune 1, 2002.
Meriden Gas Turbines, LLC544 MWMeriden, CTAugust 1, 2003.
Migrant Sugar Creek Ven, Inc.559 MWWest Terre Haute, INJune 1, 2003.
MidAmerican Energy Co.540 MWPleasant Hill, IowaPhase I Summer 2003/Phase II Summer 2003.
Start Signature

Issued in Washington, DC, on April 24, 2002.

Anthony J. Como,

Deputy Director, Electric Power Regulation, Office of Coal & Power Import/Export, Office of Coal & Power Systems, Office of Fossil Energy.

End Signature End Supplemental Information

[FR Doc. 02-10572 Filed 4-29-02; 8:45 am]

BILLING CODE 6450-01-P