Skip to Content

Notice

Hackberry LNG Terminal, L.L.C.; Notice of Resource Agency Meeting and Site Visit

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble August 29, 2002.

On September 11, 2002, staff of the Office of Energy Projects (OEP) will attend an interagency meeting and pre-certification site visit of Hackberry LNG Terminal L.L.C.'s (Hackberry LNG) proposed liquefied natural gas (LNG) import terminal and storage facility in Cameron Parish, Louisiana. Representatives of Federal and state resource agencies, as well as representatives of Hackberry LNG, will be present.

All interested parties may attend the site visit. Those planning to attend must provide their own transportation. Anyone interested in participating should meet at the proposed LNG terminal site, located approximately 15 miles south of Sulphur, Louisiana along Louisiana State Route 27, at 8:30 a.m. on September 11, 2002. The meeting place is a gravel drive on the left side of Louisiana State Route 27, two miles south of the Intracoastal Waterway bridge.

Start Signature

Linwood A. Watson, Jr.,

Deputy Secretary.

End Signature End Preamble

[FR Doc. 02-22659 Filed 9-5-02; 8:45 am]

BILLING CODE 6717-01-P