Skip to Content

Notice

Notice of Extension of Time Limit of Preliminary Results of New Shipper Review: Freshwater Crawfish Tail Meat From the People's Republic of China

Document Details

Information about this document as published in the Federal Register.

Document Statistics
Document page views are updated periodically throughout the day and are cumulative counts for this document including its time on Public Inspection. Counts are subject to sampling, reprocessing and revision (up or down) throughout the day.
Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Import Administration, International Trade Administration, U.S. Department of Commerce.

SUMMARY:

The Department of Commerce is extending the time limit of the preliminary results of the new shipper review of the antidumping duty order on freshwater crawfish tail meat from the People's Republic of China until no later than November 22, 2002. The period of review is September 1, 2001, Start Printed Page 60641through February 28, 2002. This extension is made pursuant to section 751(a)(2)(B)(iv) of the Tariff Act of 1930, as amended.

EFFECTIVE DATE:

September 26, 2002.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Douglas Kirby or Scott Lindsay, AD/CVD Enforcement, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW., Washington DC 20230; telephone: (202) 482-3782 or (202) 482-0780, respectively.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

Applicable Statutes and Regulations

Unless otherwise indicated, all citations to the statute are references to the provisions of the Tariff Act of 1930, as amended (the Act). In addition, unless otherwise indicated, all citations to the Department's regulations are to the provisions codified at 19 CFR part 351 (2002).

Statutory Time Limits

Section 351.214(i) of the regulations requires the Department to issue the preliminary results of a new shipper review within 180 days after the date on which the new shipper review was initiated, and final results of review within 90 days after the date on which the preliminary results were issued. However, if the Department determines the issues are extraordinarily complicated, section 351.214(i)(2) of the regulations allows the Department to extend the deadline for the preliminary results to up to 300 days after the date on which the new shipper review was initiated.

Background

On March 29, 2002 the Department received a timely request from Weishan Zhenyu Foodstuff Co., Ltd. (Zhenyu), in accordance with section 751(a)(2)(B) of the Act and section 351.214(c) of the regulations, for a new shipper of the antidumping duty order on freshwater crawfish tail meat from the People's Republic of China (“PRC”), which has a September anniversary date. On April 23, 2002 the Department initiated this new shipper review covering the period September 1, 2001, through February 28, 2002. See Freshwater Crawfish Tail Meat From the People's Republic of China: Initiation of New Shipper Antidumping Review (67 FR 21218). The preliminary results of review are currently due October 20, 2002.

Extension of Time Limits for Preliminary Results

Pursuant to section 751(a)(2)(B) of the Act, the Department may extend the deadline for completion of the preliminary results of a new shipper review if it determines that the case is extraordinarily complicated. The Department has determined that this case is extraordinarily complicated, and the preliminary results of this new shipper review cannot be completed within the statutory time limit of 180 days. The Department finds that this new shipper review is extraordinarily complicated because there are a number of issues that must be addressed. For example, the Department has prepared a supplemental questionnaire requesting additional information on the respondent's claims concerning affiliation and date of sale. Given the issues in this case, the Department may find it necessary to request even more information in this new shipper review. Therefore, in accordance with section 351.214(i)(2) of the regulations, the Department is extending the time limit for the completion of preliminary results by thirty-three days. The preliminary results will now be due no later than November 22, 2002.

This notice is published pursuant to sections 751(a)(2)(B) and 777(i)(1) of the Act.

Start Signature

Dated: September 19, 2002.

Joseph A. Spetrini,

Deputy Assistant Secretary for Import Administration, Group III.

End Signature End Supplemental Information

[FR Doc. 02-24479 Filed 9-25-02; 8:45 am]

BILLING CODE 3510-DS-P