Skip to Content

Rule

Establishment of Class D Airspace; Greenville Donaldson Center, SC, Amendment of Class E2 Airspace; Greer, Greenville-Spartanburg Airport SC, and Amendment of Class E5 Airspace; Greenville, SC

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Federal Aviation Administration (FAA), DOT.

ACTION:

Final rule; delay of effective date.

SUMMARY:

This action delays indefinitely the establishment of Class D airspace at Greenville Donaldson Center, SC, the amendment of Class E2 airspace at Greer, Greenville-Spartanburg Airport, SC, and the amendment of Class E5 airspace at Greenville, SC. The construction of a new federal contract tower with a weather reporting system has been delayed, with an uncertain completion date; therefore, the effective date of the establishment of Class D airspace and amendment of Class E airspace must also be delayed indefinitely.

EFFECTIVE DATE:

The effective date of the final rule published May 1, 2002, at 67 FR 21575 (0901 UTC, November 28, 2002) is delayed indefinitely.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Walter R. Cochran, Manager, Airspace Branch, Air Traffic Division, Federal Aviation Administration, P.O. Box 20636, Atlanta, GA 30320; telephone (404) 305-5586.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

History

Airspace Docket No. 02-ASO-04, published in the Federal Register on May 1, 2002, (67 FR 21575), established Class D airspace at Greenville Start Printed Page 65873Donaldson Center, SC, amended Class E2 airspace at Greer, Greenville-Spartanburg Airport, SC, and amended Class E5 airspace at Greenville, SC. The construction of a federal contract tower with a weather reporting system at Donaldson Center Airport made this action necessary. This action was originally scheduled to become effective on November 28, 2002; however, an unforeseen delay in beginning construction on the tower has required the effective date of this action to be delayed. Construction is now scheduled to begin in January 2003, with an anticipated date of September 2003. A notice announcing a new effective date will be published in the Federal Register at least 90 days prior to the new effective date.

The FAA has determined that this regulation only involves an established body of technical regulations for which frequent and routine amendments are necessary to keep them operationally current. It, therefore, (1) is not a “significant regulatory action” under Executive Order 12866; (2) is not a “significant rule” under DOT Regulatory Policies and Procedures (44 FR 11034; February 26, 1979); and (3) does not warrant preparation of a regulatory evaluation as the anticipated impact is so minimal. Since this is a routine matter that will only affect air traffic procedures and air navigation, it is certified that this rule will not have a significant economic impact on a substantial number of small entities under the criteria of the Regulatory Flexibility Act.

Start List of Subjects

List of Subjects in 14 CFR Part 71

End List of Subjects

Delay of Effective Date

Start Amendment Part

The effective date on Airspace Docket No. 02-ASO-04 is hereby delayed indefinitely.

End Amendment Part Start Authority

Authority: 49 U.S.C. app. 1348(a), 1354(a), 1510, E.O. 10854, 24 FR 9565, 3 CFR, 1959-1963 Comp., p. 389; 49 U.S.C. 106(g); 14 CFR 11.69.

End Authority
* * * * *
Start Signature

Issued in College Park, Georgia, on October 17, 2002.

Walter R. Cochran,

Acting Manager, Air Traffic Division, Southern Region.

End Signature End Supplemental Information

[FR Doc. 02-27174 Filed 10-28-02; 8:45 am]

BILLING CODE 4910-13-M