Skip to Content

Notice

Silicon Metal From Brazil: Extension of Time Limit for Preliminary Results of Antidumping Duty Administrative Review

Document Details

Information about this document as published in the Federal Register.

Document Statistics
Document page views are updated periodically throughout the day and are cumulative counts for this document including its time on Public Inspection. Counts are subject to sampling, reprocessing and revision (up or down) throughout the day.
Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

EFFECTIVE DATE:

March 11, 2003.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Maisha Cryor at (202) 482-5831 or Start Printed Page 11520Thomas Futtner at (202) 482-3814, Group II, Office 4, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Ave, NW., Washington, DC 20230.

Time Limits

Statutory Time Limits

Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (the Act), requires the Department of Commerce (the Department) to make a preliminary determination within 245 days after the last day of the anniversary month of an order for which a review is requested and a final determination within 120 days after the date on which the preliminary determination is published. However, if it is not practicable to complete the review within these time periods, section 751(a)(3)(A) of the Act allows the Department to extend the time limit for the preliminary determination to a maximum of 365 days after the last day of the anniversary month.

Background

On August 27, 2002, the Department published a notice of initiation of administrative review of the antidumping duty order on Silicon Metal from Brazil, covering the period July 1, 2001 through June 30, 2002. See Initiation of Antidumping and Countervailing Duty Administrative Reviews and Requests for Revocation in Part, 67 FR 55000, 55001 (August 27, 2002). The preliminary results are currently due no later than April 2, 2003.

Extension of Time Limit for Preliminary Results of Review

We determine that it is not practicable to complete the preliminary results of this review within the original time limit. Therefore, the Department is extending the time limit for completion of the preliminary results until no later than July 22, 2003. See Decision Memorandum from Holly A. Kuga, Senior Office Director, to Bernard T. Carreau, Deputy Assistant Secretary, dated concurrently with this notice, which is on file in the Central Records Unit, Room B-099 of the main Commerce building. We intend to issue the final results no later than 120 days after the publication of the preliminary results notice.

This extension is in accordance with section 751(a)(3)(A) of the Act.

Start Signature

Dated: March 4, 2003.

Holly A. Kuga,

Acting Deputy Assistant Secretary for Import Administration, Group II.

End Signature End Further Info End Preamble

[FR Doc. 03-5776 Filed 3-10-03; 8:45 am]

BILLING CODE 3510-DS-P