Legal Status
Legal Status
Notice
Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests
A Notice by the Federal Energy Regulatory Commission on
Document Details
Information about this document as published in the Federal Register.
- Printed version:
- Publication Date:
- 07/25/2003
- Agencies:
- Federal Energy Regulatory Commission
- Document Type:
- Notice
- Document Citation:
- 68 FR 44072
- Page:
- 44072-44073 (2 pages)
- Agency/Docket Number:
- Project No. 2720-036
- Document Number:
- 03-18936
Document Details
-
Enhanced Content - Table of Contents
This tables of contents is a navigational tool, processed from the headings within the legal text of Federal Register documents. This repetition of headings to form internal navigation links has no substantive legal effect.
There is no table of contents available for this document.Enhanced Content - Table of Contents
-
Enhanced Content - Submit Public Comment
- This feature is not available for this document.
Enhanced Content - Submit Public Comment
-
Enhanced Content - Read Public Comments
- This feature is not available for this document.
Enhanced Content - Read Public Comments
-
Enhanced Content - Sharing
- Shorter Document URL
- https://www.federalregister.gov/d/03-18936 https://www.federalregister.gov/d/03-18936
Enhanced Content - Sharing
-
Enhanced Content - Document Tools
These tools are designed to help you understand the official document better and aid in comparing the online edition to the print edition.
-
These markup elements allow the user to see how the document follows the Document Drafting Handbook that agencies use to create their documents. These can be useful for better understanding how a document is structured but are not part of the published document itself.
Display Non-Printed Markup Elements
Enhanced Content - Document Tools
-
-
Enhanced Content - Developer Tools
This document is available in the following developer friendly formats:
- JSON: Normalized attributes and metadata
- XML: Original full text XML
- MODS: Government Publishing Office metadata
More information and documentation can be found in our developer tools pages.
Enhanced Content - Developer Tools
Published Document
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 2720-036.
c. Date filed: July 29, 2002.
d. Applicant: City of Norway, Michigan.
e. Name of Project: Sturgeon Falls Hydroelectric Project.
f. Location: On the Menominee River in Dickinson County, Michigan and Marinette County, Wisconsin. The project does not utilize lands of the United States.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)—825(r)
h. Applicant Contact: Ray Anderson, City Manager, City of Norway, City Hall, 915 Main Street, Norway, Michigan 49870, (906) 563-8015.
i. FERC Contact: Patti Leppert (202) 502-6034, or patricia.leppert@ferc.gov.
j. Deadline for filing motions to intervene and protests: 60 days from the issuance date of this notice.
All documents (original and eight copies) should be filed with: Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission Start Printed Page 44073relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.
Motions to intervene and protests, comments, recommendations, terms and conditions, and prescriptions may be filed electronically via the Internet in lieu of paper. The Commission strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site (http://www.ferc.gov ) under the “e-Filing” link.
k. This application has been accepted for filing, but is not ready for environmental analysis at this time.
l. Description of Project: The existing project consists of: (1) A 270-foot-long concrete dam with spillway equipped with a 16.7-foot-high by 24-foot-wide Taintor gate and a 16.7-foot-high by 16-foot-wide Taintor gate; (2) a 126.5-foot-long concrete head-works structure; (3) a 400-acre impoundment with a normal pool elevation of 829.8 feet National Geodetic Vertical Datum; (4) a 300-foot-long, 60-foot-wide power canal; (5) a powerhouse containing four generating units with a total installed capacity of 5,136 kilowatts; (6) a 300-foot-long, 7.2-kV transmission line; and (7) appurtenant facilities.
m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's Web site at http://www.ferc.gov using the "FERRIS" link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for TTY, (202) 502-8659. A copy is also available for inspection and reproduction at the address in item h above.
n. Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.
All filings must (1) bear in all capital letters the title “PROTEST” or “MOTION TO INTERVENE;” (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application.
o. Procedural schedule and final amendments: The application should be processed according to the following Hydro Licensing Schedule. Revisions to the schedule will be made as appropriate.
Issue Scoping Document 1 for comments: July 2003.
Request Additional Information, if necessary: August 2003.
Issue Scoping Document 2, if necessary: August 2003.
Notice Ready for Environmental Analysis: September 2003.
Notice of the availability of the EA: January 2004.
Ready for Commission's decision on the application: March 2004.
p. You may also register online at http://www.ferc.gov/esubscribenow.htm to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support.
Start SignatureMagalie R. Salas,
Secretary.
[FR Doc. 03-18936 Filed 7-24-03; 8:45 am]
BILLING CODE 6717-01-P