Electrical Interconnection of the Summit/Westward Project

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Bonneville Power Administration (BPA), Department of Energy (DOE).

ACTION:

Notice of availability of Record of Decision (ROD).

SUMMARY:

This notice announces the availability of the ROD to offer contract terms for interconnection of the proposed Summit/Westward Project into the Federal Columbia River Transmission System at BPA's Allston Start Printed Page 45799Substation. This decision is consistent with BPA's Business Plan Final Environmental Impact Statement (DOE/EIS-0183, June 1995) and the Business Plan ROD (August 1995). The project is proposed by Westward Energy, LLC, and involves construction and operation of a 520-megawatt natural-gas-fired, combined-cycle generating facility to be located in Columbia County, Oregon, about 4.5 miles north of Clatskanie, Oregon.

ADDRESSEs:

Copies of the ROD and EIS may be obtained by calling BPA's toll-free document request line, 1-800-622-4520. The ROD and EIS Summary are also available on our Web site, www.efw.bpa.gov.

Start Further Info

FOR FURTHER INFORMATION, CONTACT:

Dawn Boorse, Bonneville Power Administration—KEC-4, P.O. Box 3621, Portland, Oregon, 97208-3621; toll-free telephone number 1-800-282-3713; direct telephone number 503-230-5678; fax number 503-230-5699; or e-mail drboorse@bpa.gov.

Start Signature

Issued in Portland, Oregon, on July 25, 2003.

Stephen J. Wright,

Administrator and Chief Executive Officer.

End Signature End Further Info End Preamble

[FR Doc. 03-19709 Filed 8-1-03; 8:45 am]