Skip to Content

Notice

Certain Hot-Rolled Carbon Steel Flat Products from India: Extension of Time Limit for Preliminary Results of Antidumping Duty Administrative Review

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

ACTION:

Notice of Extension of Time Limits.

EFFECTIVE DATE:

August 27, 2003.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Timothy Finn or Kevin Williams, AD/CVD Enforcement, Office 4, Group II, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW, Washington, DC 20230; telephone (202) 482-0065 or (202) 482-2371, respectively.

End Further Info

TIME LIMITS:

Statutory Time Limits

Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (the Act), requires the Department of Commerce (the Department) to make a preliminary determination within 245 days after the last day of the anniversary month of an order or finding for which a review is requested and a final determination within 120 days after the date on which the preliminary determination is published. However, if it is not practicable to complete the review within these time periods, section 751(a)(3)(A) of the Act allows the Department to extend the 245-day time limit for the preliminary determination to a maximum of 365 days and the time limit for the final determination to 180 days (or 300 days if the Department does not extend the time limit for the preliminary determination) from the date of publication of the preliminary determination.

Background

On January 22, 2003, the Department published a notice of initiation of administrative review of the antidumping duty order on certain hot-rolled carbon steel flat products from India, covering the period May 3, 2001 through November 30, 2002. See Initiation of Antidumping and Countervailing Duty Administrative Reviews and Request for Revocation in Part, 68 FR 3009, 3010 (January 22, 2003). The preliminary results are currently due no later than September 2, 2003.

Extension of Time Limit for Preliminary Results of Review

We determine that it is not practicable to complete the preliminary results of this review within the original time limit. Therefore, the Department is extending the time limit for completion of the preliminary results by 62 days until no later than November 3, 2003. See Decision Memorandum from Thomas Futtner, Acting Office Director for Import Administration, Group II, Office IV to Holly A. Kuga, Acting Deputy Assistant Secretary for Import Administration, Group II, dated concurrently with this notice, which is on file in the Central Records Unit, Room B-099 of the Department's main building. We intend to issue the final results no later than 120 days after the publication of the preliminary results notice.

This extension is in accordance with section 751(a)(3)(A) of the Act.

Start Signature

Dated: August 18, 2003.

Holly A. Kuga,

Acting Deputy Assistant Secretary for Import Administration, Group II.

End Signature End Preamble

[FR Doc. 03-21905 Filed 8-26-03; 8:45 am]

BILLING CODE 3510-DS-S