Skip to Content


Stainless Steel Plate in Coils From Taiwan: Extension of Time Limit for the Final Results of the Antidumping Duty Administrative Review

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble


Import Administration, International Trade Administration, Department of Commerce.


Notice of extension of time limit for the final results of antidumping duty administrative review.


September 19, 2003.

Start Further Info


Catherine Bertrand, AD/CVD Enforcement, Group III, Office 9, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW., Washington DC 20230; telephone: (202) 482-3207.


On June 4, 2003, the Department of Commerce (“the Department”) published the preliminary rescission of the administrative review of the antidumping duty order on stainless steel plate in coils from Taiwan. See Preliminary Rescission of Antidumping Duty Administrative Review: Stainless Steel Plate in Coils from Taiwan, 68 FR 33472 (June 4, 2003). The final results of this administrative review are currently due no later than October 2, 2003.

Extension of Time Limit for Preliminary Results

Due to the complexity of issues present in this administrative review, such as complicated affiliation issues and middleman dumping allegations, the Department has determined that it is not practicable to complete this review within the original time period provided in section 751(a)(3)(A) of the Tariff Act of 1930, as amended, and section 351.213(h)(2) of the Department's regulations. Given the complexity of these issues and the large amount of information collected during the review, the Department needs additional time to review the record of this proceeding and make a determination. Therefore, we are extending the due date for the final results by 30 days, until no later than November 1, 2003.

Start Signature
Start Printed Page 54893

Dated: September 15, 2003.

Joseph A. Spetrini,

Deputy Assistant Secretary for Import Administration, Group III.

End Signature End Further Info End Preamble

[FR Doc. 03-23964 Filed 9-18-03; 8:45 am]