Stainless Steel Sheet and Strip in Coils from Taiwan: Extension of Time Limits for Preliminary Results of Antidumping Duty Administrative Review

Document Details

Information about this document as published in the Federal Register.

Document Statistics
Document page views are updated periodically throughout the day and are cumulative counts for this document including its time on Public Inspection. Counts are subject to sampling, reprocessing and revision (up or down) throughout the day.
Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble Start Printed Page 18053

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

ACTION:

Extension of time limits for the preliminary results of antidumping duty administrative review.

SUMMARY:

The Department of Commerce (“the Department”) is extending the time limits for the preliminary results of the antidumping duty administrative review of stainless steel sheet and strip (“SSSS”) from Taiwan.

EFFECTIVE DATE:

April 6, 2004.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Peter Mueller, AD/CVD Enforcement Group III, Office 9, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW., Washington, DC 20230; telephone: (202) 482-5811.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

Background

On July 2, 2003, the Department published a notice of opportunity to request an administrative review of the antidumping duty order on SSSS from Taiwan. See Antidumping or Countervailing Duty Order, Finding, or Suspended Investigation; Opportunity to Request Administrative Review, 68 FR 39511 (July 2, 2003). On July 24, 2003, Chia Far Industrial Factory Co. Ltd. (“Chia Far”), a Taiwanese producer of subject merchandise, requested that the Department conduct an administrative review of its sales of subject merchandise during the period of review. On July 30, 2003, petitioners [1] requested that the Department conduct an administrative review of Chia Far, Yieh United Steel Corporation (“YUSCO”), Tung Mung Development Co., Ltd., Ta Chen Stainless Pipe Co., Ltd., China Steel Corporation, Tang Eng Iron Works, PFP Taiwan Co., Ltd., Yieh Loong Enterprise Co., Ltd., Yieh Trading Corp., Goang Jau Shing Enterprise Co., Ltd., Yieh Mau Corp., Chien Shing Stainless Co., Chain Chon Industrial Co., Ltd., and their various affiliates. On August 22, 2003, the Department published a notice of initiation of a review of SSSS from Taiwan covering the period July 1, 2002 through June 30, 2003. See Initiation of Antidumping and Countervailing Duty Administrative Reviews and Requests for Revocation in Part, 68 FR 50750 (August 22, 2003). On February 5, 2004, the Department extended the time limit for the preliminary results of this administrative review by 60 days. See Stainless Steel Sheet and Strip in Coils from Taiwan: Extension of Time Limits for Preliminary Results of Antidumping Duty Administrative Review, 69 FR 5497 (February 5, 2004). The preliminary results of review are currently due no later than May 31, 2004.

Extension of Time Limits for Preliminary Results

Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (“the Act”) states that the administering authority shall make a preliminary determination within 245 days after the last day of the month in which occurs the anniversary of the date of publication of the order, finding, or suspension agreement for which the review under section 751(a)(1) is requested. If it is not practicable to complete the review within the foregoing time, the administering authority may extend that 245-day period to 365 days. Completion of the preliminary results within a 245-day period is impracticable for the following reasons: (1) In order to calculate margins for the preliminary results, the Department must first resolve a complex inquiry as to whether merchandise entering under certain Harmonized Tariff Schedule classifications should be considered subject merchandise; (2) The review involves a large number of transactions and complex adjustments; (3) The responses from Chia Far and YUSCO include sales and cost information which require the Department to gather and analyze a significant amount of information; and (4) The review involves examining complex relationships between the producers and a large number of customers and suppliers.

Therefore, in accordance with section 751(a)(3)(A) of the Act, and section 351.213(h)(2) of the Department's regulations, we are extending the time period for issuing the preliminary results of review by 60 days from May 31, 2004 until July 30, 2004. The final results continue to be due 120 days after the publication of the preliminary results. This notice is issued and published in accordance with section 751(a)(3)(A) of the Act, and section 351.213(h)(2) of the Department's regulations.

Start Signature

Dated: March 31, 2004.

Barbara E. Tillman,

Acting Deputy Assistant Secretary for Import Administration, Group III.

End Signature End Supplemental Information

Footnotes

1.  Petitioners are Allegheny Ludlum Corporation, AK Steel Corporation, Butler Armco Independent Union, J&L Specialty Steel, Inc., United States Steelworkers of America, AFL-CIO/CLC, and Zanesville Armco Independent Organization.

Back to Citation

[FR Doc. 04-7807 Filed 4-5-04; 8:45 am]