This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Rule
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
Effective Date: The effective date is May 26, 2004.
Table of Contents
Enhanced Content - Table of Contents
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
668
as of
11/16/2026 at 4:15 am EST
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Office of Pipeline Safety (OPS), Research and Special Programs Administration (RSPA), DOT.
ACTION:
Final rule; correction.
SUMMARY:
This document corrects a final rule published in the
Federal Register
on December 15, 2003, (68 FR 69778) and a correction document to that rule published in the
Federal Register
on April 6, 2004 (69 FR 18228). The final rule of December 15, 2003, requires operators to develop integrity management programs for gas transmission pipelines located where a leak or rupture could do the most harm,
i.e.,
where a gas transmission pipeline could impact a high consequence area (HCA). This document makes minor corrections to the rule.
DATES:
Effective Date:
The effective date is May 26, 2004.
FOR FURTHER INFORMATION CONTACT:
Mike Israni by phone at (202) 366-4571, by fax at (202) 366-4566, or by e-mail at
mike.israni@rspa.dot.gov,
regarding the subject matter of the final rule.
SUPPLEMENTARY INFORMATION:
Background
On December 15, 2003, RSPA/OPS published a final rule (68 FR 69778) that requires operators of gas transmission pipelines to develop and implement a comprehensive integrity management program for pipeline segments located in areas where a failure would have the greatest impact to the public or property. On April 6, 2004, RSPA/OPS published a correction rule that made editorial and typographical corrections to the final rule and addressed a petition for reconsideration filed by the Interstate Natural Gas Association of America.
Purpose for This Document
The April 6, 2004, correction rule contained errors. This correction document corrects those errors and corrects additional errors identified in the December 15, 2003, final rule.
Corrections and Clarifications
In the April 6, 2004, correction rule, RSPA/OPS amended the definition of “high consequence areas” by clarifying that an operator using Method (1) to identify these areas would have to calculate and evaluate potential impact circles on any transmission line in a Class 1 or Class 2 location. RSPA/OPS removed the phrase “outside a Class 3 or Class 4 location” to clarify that an operator does not have to evaluate segments that have already been classified as “high consequence areas.” However, RSPA/OPS erroneously used the term “potential impact radius” in paragraph (1)(iv) instead of the term “potential impact circle.” In this correction rule, RSPA/OPS is replacing the word “radius” with “circle.”
Section 192.925 sets forth the requirements for external corrosion direct assessment. This was change number 9 in the April 6, 2004 correction rule. In that document, RSPA/OPS revised the introductory text in paragraph (b) to clarify what an operator is required to do if the External Corrosion Direct Assessment detects pipeline coating damage. RSPA/OPS has since become aware that the
Federal Register
read this instruction as revising paragraph (b) and as deleting the further requirements in subparagraphs (b)(1) through (b)(4). RSPA/OPS did not intend for the revision to delete these requirements. This correction rule adds back to the final rule the missing requirements of paragraphs (b)(1) through (b)(4). This correction rule presents § 192.925(b) in its entirety, with the revised language in the introductory paragraph.
In the April 6, 2004, correction rule, we revised paragraph (d) of § 192.935 to include requirements for additional preventive and mitigative measures for a pipeline operating below 30% SMYS located in a Class 3 or Class 4 area. In the requirements, we referenced the reassessment requirements of §§ 192.941(b) and 192.941(c). RSPA/OPS did not mean to add these references as they only add confusion to the final rule. In this correction rule, RSPA/OPS is removing the references to the reassessment requirements of §§ 192.941(b) and 192.941(c) to avoid further confusion.
Section I of Appendix E provides additional guidance on determining a high consequence area. The second sentence in this section erroneously states that an operator must use method (a) or (b) from the definition in § 192.903 to identify a “high consequence area.” The sentence is now corrected to state that an operator must
( printed page 29904)
use method (1) or (2) from the definition in § 192.903 to identify a “high consequence area.”
2. In § 192.903 the definition of “high consequence area” is amended by removing the word “radius” from paragraph (1)(iv) and adding the word “circle” in its place.
3. Section 192.925 is amended by revising paragraph (b) to read as follows:
What are the requirements for using External Corrosion Direct Assessment (ECDA)?
* * * * *
(b)
General requirements.
An operator that uses direct assessment to assess the threat of external corrosion must follow the requirements in this section, in ASME/ANSI B31.8S (ibr, see § 192.7), section 6.4, and in NACE RP 0502-2002 (ibr, see § 192.7). An operator must develop and implement a direct assessment plan that has procedures addressing preassessment, indirect examination, direct examination, and post-assessment. If the ECDA detects pipeline coating damage, the operator must also integrate the data from the ECDA with other information from the data integration (§ 192.917(b)) to evaluate the covered segment for the threat of third party damage, and to address the threat as required by § 192.917(e)(1).
(1)
Preassessment.
In addition to the requirements in ASME/ANSI B31.8S section 6.4 and NACE RP 0502-2002, section 3, the plan's procedures for preassessment must include—
(i) Provisions for applying more restrictive criteria when conducting ECDA for the first time on a covered segment; and
(ii) The basis on which an operator selects at least two different, but complementary indirect assessment tools to assess each ECDA Region. If an operator utilizes an indirect inspection method that is not discussed in Appendix A of NACE RP0502-2002, the operator must demonstrate the applicability, validation basis, equipment used, application procedure, and utilization of data for the inspection method.
(2)
Indirect examination.
In addition to the requirements in ASME/ANSI B31.8S section 6.4 and NACE RP 0502-2002, section 4, the plan's procedures for indirect examination of the ECDA regions must include—
(i) Provisions for applying more restrictive criteria when conducting ECDA for the first time on a covered segment;
(ii) Criteria for identifying and documenting those indications that must be considered for excavation and direct examination. Minimum identification criteria include the known sensitivities of assessment tools, the procedures for using each tool, and the approach to be used for decreasing the physical spacing of indirect assessment tool readings when the presence of a defect is suspected;
(iii) Criteria for defining the urgency of excavation and direct examination of each indication identified during the indirect examination. These criteria must specify how an operator will define the urgency of excavating the indication as immediate, scheduled or monitored; and
(iv) Criteria for scheduling excavation of indications for each urgency level.
(3)
Direct examination.
In addition to the requirements in ASME/ANSI B31.8S section 6.4 and NACE RP 0502-2002, section 5, the plan's procedures for direct examination of indications from the indirect examination must include—
(i) Provisions for applying more restrictive criteria when conducting ECDA for the first time on a covered segment;
(ii) Criteria for deciding what action should be taken if either:
(A) Corrosion defects are discovered that exceed allowable limits (Section 5.5.2.2 of NACE RP0502-2002), or
(B) Root cause analysis reveals conditions for which ECDA is not suitable (Section 5.6.2 of NACE RP0502-2002);
(iii) Criteria and notification procedures for any changes in the ECDA Plan, including changes that affect the severity classification, the priority of direct examination, and the time frame for direct examination of indications; and
(iv) Criteria that describe how and on what basis an operator will reclassify and reprioritize any of the provisions that are specified in section 5.9 of NACE RP0502-2002.
(4)
Post assessment and continuing evaluation.
In addition to the requirements in ASME/ANSI B31.8S section 6.4 and NACE RP 0502-2002, section 6, the plan's procedures for post assessment of the effectiveness of the ECDA process must include—
(i) Measures for evaluating the long-term effectiveness of ECDA in addressing external corrosion in covered segments; and
(ii) Criteria for evaluating whether conditions discovered by direct examination of indications in each ECDA region indicate a need for reassessment of the covered segment at an interval less than that specified in § 192.939. (See Appendix D of NACE RP0502-2002.)
* * * * *
4. Section 192.935 is amended by revising the introductory text of paragraph (d) to read as follows:
What additional preventive and mitigative measures must an operator take?
* * * * *
(d)
Pipelines operating below 30% SMYS.
An operator of a transmission pipeline operating below 30% SMYS located in a high consequence area must follow the requirements in paragraphs (d)(1) and (d)(2) of this section. An operator of a transmission pipeline operating below 30% SMYS located in a Class 3 or Class 4 area but not in a high consequence area must follow the requirements in paragraphs (d)(1), (d)(2) and (d)(3) of this section.
* * * * *
Appendix E to Part 192—[Amended]
5. In Appendix E to Part 192, the introductory text of Section I is amended by removing the words “method (a) or (b)” from the second sentence and adding the words “method (1) or (2)” in its place.