Skip to Content

Rule

Changes in Flood Elevation Determinations

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Federal Emergency Management Agency (FEMA), Emergency Preparedness and Response Directorate, Department of Homeland Security.

ACTION:

Final rule.

SUMMARY:

Modified Base (1% annual chance) Flood Elevations (BFEs) are finalized for the communities listed below. These modified elevations will be used to calculate flood insurance premium rates for new buildings and their contents.

EFFECTIVE DATES:

The effective dates for these modified BFEs are indicated on the following table and revise the Flood Insurance Rate Map(s) (FIRMs) in effect for each listed community prior to this date.

ADDRESSES:

The modified BFEs for each community are available for inspection at the office of the Chief Executive Officer of each community. The respective addresses are listed in the table below.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Doug Bellomo, P.E., Hazard Identification Section, Emergency Preparedness and Response Directorate, FEMA, 500 C Street SW., Washington, DC 20472, (202) 646-2903.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

FEMA makes the final determinations listed below of modified BFEs for each community listed. These modified elevations have been published in newspapers of local circulation and ninety (90) days have elapsed since that publication. The Mitigation Division Director of the Emergency Preparedness and Response Directorate has resolved any appeals resulting from this notification.

The modified BFEs are not listed for each community in this notice. However, this rule includes the address of the Chief Executive Officer of the community where the modified base flood elevation determinations are available for inspection.

The modifications are made pursuant to section 206 of the Flood Disaster Protection Act of 1973, 42 U.S.C. 4105, and are in accordance with the National Flood Insurance Act of 1968, 42 U.S.C. 4001 et seq., and with 44 CFR part 65.

For rating purposes, the currently effective community number is shown and must be used for all new policies and renewals.

The modified BFEs are the basis for the floodplain management measures that the community is required to either adopt or to show evidence of being already in effect in order to qualify or to remain qualified for participation in the National Flood Insurance Program (NFIP).

These modified elevations, together with the floodplain management criteria required by 44 CFR 60.3, are the minimum that are required. They should not be construed to mean that the community must change any existing ordinances that are more stringent in their floodplain management requirements. The community may at any time enact stricter requirements of its own, or pursuant to policies established by other Federal, state or regional entities.

These modified elevations are used to meet the floodplain management requirements of the NFIP and are also used to calculate the appropriate flood insurance premium rates for new buildings built after these elevations are made final, and for the contents in these buildings.

The changes in BFEs are in accordance with 44 CFR 65.4.

National Environmental Policy Act

This rule is categorically excluded from the requirements of 44 CFR part 10, Environmental Consideration. No environmental impact assessment has been prepared.

Regulatory Flexibility Act

The Mitigation Division Director of the Emergency Preparedness and Response Directorate certifies that this rule is exempt from the requirements of the Regulatory Flexibility Act because modified BFEs are required by the Flood Disaster Protection Act of 1973, 42 U.S.C. 4105, and are required to maintain community eligibility in the NFIP. No regulatory flexibility analysis has been prepared.

Regulatory Classification

This final rule is not a significant regulatory action under the criteria of Start Printed Page 50321section 3(f) of Executive Order 12866 of September 30, 1993, Regulatory Planning and Review, 58 FR 51735.

Executive Order 12612, Federalism

This rule involves no policies that have federalism implications under Executive Order 12612, Federalism, dated Oct. 26, 1987.

Executive Order 12778, Civil Justice Reform

This rule meets the applicable standards of section 2(b)(2) of Executive Order 12778.

Start List of Subjects

List of Subjects in 44 CFR Part 65

End List of Subjects Start Amendment Part

Accordingly,

End Amendment Part Start Part

PART 65—[AMENDED]

End Part Start Amendment Part

1. The authority citation for part 65 continues to read as follows:

End Amendment Part Start Authority

Authority: 42 U.S.C. 4001 et seq.; Reorganization Plan No. 3 of 1978, 3 CFR, 1978 Comp., p. 329; E.O. 12127, 44 FR 19367, 3 CFR, 1979 Comp., p. 376.

End Authority
[Amended]
Start Amendment Part

2. The tables published under the authority of § 65.4 are amended as follows:

End Amendment Part
State and countyLocationDates and name of newspaper where notice was publishedChief executive officer of communityEffective date of modificationCommunity No.
New Hampshire: Cheshire (FEMA Docket No. D-7547)City of KeeneOct. 3, 2003, Oct. 10, 2003, The Keene SentinelThe Honorable Michael Blastos, Mayor of the City of Keene, City Hall, 3 Washington Street, Keene, New Hampshire 03431Sept. 25, 2003330023 D
Start Signature

(Catalog of Federal Domestic Assistance No. 83.100, “Flood Insurance.”)

Dated: August 9, 2004.

David I. Maurstad,

Acting Director, Mitigation Division, Emergency Preparedness and Response Directorate.

End Signature End Supplemental Information

[FR Doc. 04-18695 Filed 8-13-04; 8:45 am]

BILLING CODE 9110-12-P