This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Notice of decision by NHTSA that nonconforming 2001 Mercedes Benz Gelaendewagen 5-door long wheel base multipurpose passenger vehicles (MPVs) are eligible for importation.
Notice of decision by NHTSA that nonconforming model years ("MY") 1999, 2000, and 2001 Mercedes Benz CL500 and CL600 passenger cars are eligible for importation.
Notice of decision by NHTSA that nonconforming 1999-2000 Mercedes Benz Gelaendewagen multi-purpose passenger vehicles (MPVs) are eligible for importation.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
64
as of
09/05/2026 at 2:15 am EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Research and Special Programs Administration (RSPA), DOT.
ACTION:
Notice; grant of waiver.
SUMMARY:
The Research and Special Programs Administration's (RSPA) Office of Pipeline Safety (OPS) is granting Alyeska Pipeline Service Company's (Alyeska) petition for a waiver of the pipeline safety regulation that requires an operator to reduce the pressure of a pipeline to not more than 50 percent of the maximum operating pressure whenever the line pipe is moved.
SUPPLEMENTARY INFORMATION:
Background
Alyeska petitioned RSPA/OPS for a waiver from compliance with the requirements of 49 CFR 195.424(a) for 420 miles of aboveground line pipe in the Trans Alaska Pipeline System (TAPS). TAPS was designed and constructed between 1973 and 1977 to transport oil 800 miles from Prudhoe Bay, Alaska, to Alyeska's marine terminal at Valdez, Alaska. Over half of the TAPS pipeline was constructed aboveground. Section 195.424(a) does not allow a pipeline operator to move any line pipe unless the pressure in the pipeline section is reduced to not more than 50 percent of the maximum operating pressure (MOP). Alyeska argues that lowering the pressure on the aboveground portion of TAPS is not necessary and is disruptive and burdensome to its pipeline operations.
The requested waiver would apply whenever routine maintenance necessitates that the aboveground line pipe be moved laterally, longitudinally or vertically, to relieve pipe stresses and restore the pipe to its intended position. On July 22, 2004, RSPA/OPS published a notice in the
Federal Register
requesting public comment on Alyeska's waiver request (69 FR 43880). No
( printed page 67213)
comments were received in response to this Notice.
Findings and Grant of Waiver
RSPA/OPS finds that Alyeska's requested waiver from § 195.424 (a) is not inconsistent with pipeline safety for the following reasons:
1. Because of its unique design, the aboveground portion of TAPS behaves differently from conventionally buried pipelines. Moving a buried pipeline during maintenance activities may impose additional stresses on the pipe. Thus, lowering the pipeline pressure prior to movement provides a safety factor and reduces the possibility of pipeline failure from overstressing the pipe. In contrast, TAPS’ aboveground pipeline is placed on support structures that allow the pipeline to move freely within a design range without imposing additional stresses on the pipeline. This design feature eliminates or reduces stresses imposed on the pipeline due to thermal expansion, seismic events, or settlement of the support structures and reduces the need to reduce pressure on the pipeline.
2. The TAPS pipeline is fully restrained where it transitions between underground and aboveground sections. The point of restraint is located approximately 1,000-1,500 feet away from the transition. This is point where the pipeline begins to behave as a fully restrained underground structure. Aboveground piping is more easily monitored and is much less restrained than underground pipe. Stresses imposed on aboveground pipe in the TAPS system are resolved by allowing movement of the pipe on support structures. Therefore, it is not necessary to reduce operating pressure on aboveground sections of the TAPS pipeline during routine maintenance activities.
3. Alyeska has established maintenance procedures to ensure the safety of the aboveground portion of this pipeline. These maintenance procedures ensure that the pipeline is maintained within its safe operating design limits. Alyeska has procedures to:
Install temporary support brackets to lift and replace the pipeline's vertical support members (VSMs);
Calibrate the spring hangers and balance the load across the VSM;
Adjust the brackets and re-level the anchor platforms whenever the anchor platform exceeds 2 percent;
Reposition the anchor slide plate to return the anchor to its proper alignment; and
Adjust the elevation of the pipe shoes to increase the flexibility of the pipeline during pipe movement.
Many of these maintenance procedures are considered “covered tasks” under 49 CFR 195.501,
Qualification of Pipeline Personnel.
All steps of a procedure are mandatory and must be followed by pipeline maintenance personnel. Maintenance crew members must be qualified on the method of applying a procedure and on how to provide notification to the Operations Control Center, the local Maintenance Coordinator, the Control Room Operator, and the nearest upstream pump station prior to performing a procedure.
Based on these findings, RSPA/OPS grants Alyeska's request for a waiver of the requirements of § 195.424(a) for the aboveground portion of TAPS. The grant of this waiver is conditioned on the following items. Alyeska must—
Apply this waiver only to the aboveground portions of TAPS;
Apply this waiver during instances of routine pipe movement provided the pipe movement does not increase the stresses on the pipe;
Not apply this waiver during instances where the pipe has fallen off the pipe supports due to seismic or hydraulic events, frost jacking, or dilapidated support structures; and
Apply this waiver only during instances whenever routine maintenance necessitates the aboveground pipe be moved laterally, longitudinally or vertically, to relieve pipe stresses and restore the pipe to its intended position.
If Alyeska does not comply with any of these requirements, or if circumstances indicate that the waiver compromises the safety of the pipeline or of people or property, RSPA/OPS reserves the right to terminate the waiver.