Skip to Content

Notice

Proposed Agency Information Collection Activities; Comment Request

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Federal Railroad Administration, DOT.

ACTION:

Notice.

SUMMARY:

In accordance with the Paperwork Reduction Act of 1995 and its implementing regulations, the Federal Railroad Administration (FRA) hereby announces that it is seeking approval of the following information collection activities. Before submitting these information collection requirements for clearance by the Office of Management and Budget (OMB), FRA Start Printed Page 71870is soliciting public comment on specific aspects of the activities identified below.

DATES:

Comments must be received no later than Feburary 8, 2005.

ADDRESSES:

Submit written comments on any or all of the following proposed activities by mail to either: Mr. Robert Brogan, Office of Safety, Planning and Evaluation Division, RRS-21, Federal Railroad Administration, 1120 Vermont Ave., NW., Mail Stop 17, Washington, DC 20590, or Ms. Debra Steward, Office of Information Technology and Productivity Improvement, RAD-20, Federal Railroad Administration, 1120 Vermont Ave., NW., Mail Stop 35, Washington, DC 20590. Commenters requesting FRA to acknowledge receipt of their respective comments must include a self-addressed stamped postcard stating, “Comments on OMB control number 2130-0557. Alternatively, comments may be transmitted via facsimile to (202) 493-6230 or (202) 493-6170, or e-mail to Mr. Brogan at robert.brogan@fra.dot.gov, or to Ms. Steward at debra.steward@fra.dot.gov. Please refer to the assigned OMB control number or collection title in any correspondence submitted. FRA will summarize comments received in response to this notice in a subsequent notice and include them in its information collection submission to OMB for approval.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Mr. Robert Brogan, Office of Planning and Evaluation Division, RRS-21, Federal Railroad Administration, 1120 Vermont Ave., NW., Mail Stop 17, Washington, DC 20590 (telephone: (202) 493-6292) or Debra Steward, Office of Information Technology and Productivity Improvement, RAD-20, Federal Railroad Administration, 1120 Vermont Ave., NW., Mail Stop 35, Washington, DC 20590 (telephone: (202) 493-6139). (These telephone numbers are not toll-free.)

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

The Paperwork Reduction Act of 1995 (PRA), Pub. L. 104-13, § 2, 109 Stat. 163 (1995) (codified as revised at 44 U.S.C. 3501-3520), and its implementing regulations, 5 CFR part 1320, require Federal agencies to provide 60-days notice to the public for comment on information collection activities before seeking approval by OMB. 44 U.S.C. 3506(c)(2)(A); 5 CFR 1320.8(d)(1), 1320.10(e)(1), 1320.12(a). Specifically, FRA invites interested respondents to comment on the following summary of proposed information collection activities regarding (i) whether the information collection activities are necessary for FRA to properly execute its functions, including whether the activities will have practical utility; (ii) the accuracy of FRA's estimates of the burden of the information collection activities, including the validity of the methodology and assumptions used to determine the estimates; (iii) ways for FRA to enhance the quality, utility, and clarity of the information being collected; and (iv) ways for FRA to minimize the burden of information collection activities on the public by automated, electronic, mechanical, or other technological collection techniques or other forms of information technology (e.g., permitting electronic submission of responses). See 44 U.S.C. 3506(c)(2)(A)(i)-(iv); 5 CFR 1320.8(d)(1)(i)-(iv). FRA believes that soliciting public comment will promote its efforts to reduce the administrative and paperwork burdens associated with the collection of information mandated by Federal regulations. In summary, FRA reasons that comments received will advance three objectives: (i) Reduce reporting burdens; (ii) ensure that it organizes information collection requirements in a “user friendly” format to improve the use of such information; and (iii) accurately assess the resources expended to retrieve and produce information requested. See 44 U.S.C. 3501.

Below is a brief summary of current information collection activities that FRA will submit for clearance by OMB as required under the PRA:

Title: Safety Integration Plans.

OMB Control Number: 2130-0557.

Abstract: The Federal Railroad Administration (FRA) and the Surface Transportation Board (STB), working in conjunction with each other, have issued joint final rules establishing procedures for the development and implementation of safety integration plans (“SIPs” or “plans”) by a Class I railroad proposing to engage in certain specified merger, consolidation, or acquisition of control transactions with another Class I railroad, or a Class II railroad with which it proposes to amalgamate operations. The scope of the transactions covered under the two rules is the same. FRA will use the information collected, notably the required SIPs, to maintain and promote a safe rail environment by ensuring that affected railroads (Class Is and some Class IIs) address critical safety issues unique to the amalgamation of large, complex railroad operations.

Form Number(s): N/A.

Affected Public: Railroads.

Respondent Universe: Class I Railroads.

Frequency of Submission: On occasion.

  Total Total

CFR sectionRespondent universeTotal annual responsesAverage time per responseTotal annual burden hoursTotal annual burden cost
244.13—Safety Integration Plans:
Amalgamation of Operations—SIP Development & Quarterly Meetings8 railroads1 plan360 hours360 hours22,224
244.17—Procedures8 railroads25 reports40 hours/2 hours92 hours5,152
—Coordination in Implementing Approved SIP8 railroads50 phone calls10 minutes4 hours224
—Request For Confidential Treatment8 railroads1 request8 hours8 hours1,224
244.19—Disposition
—Comments on Proposed SIP Amendments8 railroads2 reports16 hours32 hours1,792

Total Responses: 79.

Estimated Total Annual Burden: 496 hours.

Status: Extension of a Currently Approved Collection.

Pursuant to 44 U.S.C. 3507(a) and 5 CFR 1320.5(b), 1320.8(b)(3)(vi), FRA informs all interested parties that it may not conduct or sponsor, and a respondent is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Start Authority

Authority: 44 U.S.C. 3501-3520.

End Authority Start Signature
Start Printed Page 71871

Issued in Washington, DC on December 3, 2004.

Kathy A. Weiner,

Director, Office of Information Technology and Support Systems, Federal Railroad Administration.

End Signature End Supplemental Information

[FR Doc. 04-27089 Filed 12-9-04; 8:45 am]

BILLING CODE 4910-06-P