Legal Status
Legal Status
Notice
Stainless Steel Sheet and Strip in Coils From Mexico; Extension of Time Limit for Preliminary Results of Antidumping Duty Administrative Review
A Notice by the International Trade Administration on
Document Details
Information about this document as published in the Federal Register.
- Printed version:
- Publication Date:
- 03/08/2005
- Agencies:
- International Trade Administration
- Dates:
- March 8, 2005.
- Effective Date:
- 03/08/2005
- Document Type:
- Notice
- Document Citation:
- 70 FR 11194
- Page:
- 11194 (1 page)
- Agency/Docket Number:
- A-201-822
- Document Number:
- E5-974
Document Details
-
Enhanced Content - Table of Contents
This tables of contents is a navigational tool, processed from the headings within the legal text of Federal Register documents. This repetition of headings to form internal navigation links has no substantive legal effect.
Enhanced Content - Table of Contents
-
Enhanced Content - Submit Public Comment
- This feature is not available for this document.
Enhanced Content - Submit Public Comment
-
Enhanced Content - Read Public Comments
- This feature is not available for this document.
Enhanced Content - Read Public Comments
-
Enhanced Content - Sharing
- Shorter Document URL
- https://www.federalregister.gov/d/E5-974 https://www.federalregister.gov/d/E5-974
Enhanced Content - Sharing
-
Enhanced Content - Document Tools
These tools are designed to help you understand the official document better and aid in comparing the online edition to the print edition.
-
These markup elements allow the user to see how the document follows the Document Drafting Handbook that agencies use to create their documents. These can be useful for better understanding how a document is structured but are not part of the published document itself.
Display Non-Printed Markup Elements
Enhanced Content - Document Tools
-
-
Enhanced Content - Developer Tools
This document is available in the following developer friendly formats:
- JSON: Normalized attributes and metadata
- XML: Original full text XML
- MODS: Government Publishing Office metadata
More information and documentation can be found in our developer tools pages.
Enhanced Content - Developer Tools
Published Document
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Import Administration, International Trade Administration, Department of Commerce.
EFFECTIVE DATE:
March 8, 2005.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Angela Strom at (202) 482-2704, Maryanne Burke at (202) 482-5604 or Robert James at (202) 482-0649, AD/CVD Operations, Office 7, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW., Washington, DC 20230.
Background
On July 30, 2004, the Department of Commerce (the Department) received timely requests to conduct an administrative review of the antidumping duty order on stainless steel sheet and strip in coils from Mexico. On August 30, 2004, the Department published a notice of initiation of this administrative review, covering the period of July 1, 2003, to June 30, 2004 (69 FR 52857). The preliminary results are currently due no later than April 2, 2005.
Extension of Time Limits for Preliminary Results
Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (the Tariff Act), requires the Department to complete the preliminary results of an administrative review within 245 days after the last day of the anniversary month of an order for which a review is requested. However, if it is not practicable to complete the review within these time periods, section 751(a)(3)(A) of the Act allows the Department to extend the time limit for the preliminary results to a maximum of 365 days after the last day of the anniversary month of an order for which a review is requested.
We are currently analyzing a number of complex issues with respect to the basis for normal value which must be addressed prior to the issuance of the preliminary results. Specifically, further analysis is needed in relation to downstream sales, billing adjustments, currency conversions and cost of production data used in the margin calculation program. This requires additional time and makes it impracticable to complete the preliminary results of this review within the originally anticipated time limit. Accordingly, the Department is extending the time limit for completion of the preliminary results of this administrative review no later than July 31, 2005, which is 365 days from the last day of the anniversary month. We intend to issue the final results no later than 120 days after publication of the preliminary results notice.
Start SignatureDated: March 2, 2005.
Barbara E. Tillman,
Acting Deputy Assistant Secretary for Import Administration.
[FR Doc. E5-974 Filed 3-7-05; 8:45 am]
BILLING CODE 3510-DS-P