Skip to Content

Notice

Big Horn Wind Energy Project

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Bonneville Power Administration (BPA), Department of Energy (DOE).

ACTION:

Notice of availability of Record of Decision (ROD).

SUMMARY:

This notice announces the availability of the ROD to offer contract terms for interconnection of 200 megawatts of power to be generated by the proposed Big Horn Wind Energy Project into the Federal Columbia River Transmission System. The project would be interconnected at a proposed BPA switching substation along BPA's Big Eddy-Midway No. 1 230-kilovolt transmission line. The proposed BPA switching substation and Big Horn Wind Energy Project would be located near the town of Bickleton in Klickitat County, Washington. This decision is consistent with and tiered to BPA's Business Plan Environmental Impact Statement (DOE/EIS-0183, June 1995) and the Business Plan Record of Decision (August 15, 1995).

ADDRESSES:

Copies of this ROD may be obtained by calling BPA's toll-free document request line, 1-800-622-4520. This ROD and the Business Plan EIS and ROD are also available on our Web site, http://www.efw.bpa.gov.

Start Further Info

FOR FURTHER INFORMATION, CONTACT:

Rick Yarde, Bonneville Power Administration—KEC-4, P.O. Box 3621, Portland, Oregon 97208-3621; toll-free telephone number 1-800-282-3713; fax number (503) 230-5699; or e-mail rryarde@bpa.gov.

Start Signature

Issued in Portland, Oregon, on March 24, 2005.

Stephen J. Wright,

Administrator and Chief Executive Officer.

End Signature End Further Info End Preamble

[FR Doc. 05-6595 Filed 4-1-05; 8:45 am]

BILLING CODE 6450-01-P